← Back
Primarily 2 family with 1 store or office
366 METROPOLITAN AVENUE
BROOKLYN · BIN 3062501
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
M1-2/R6AZoning
2,700 sfGross Floor Area
3Units
17 Open Violations 13 unresolved · 4 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: FP MET REALTY LLC · 1,550 sf lot · 1.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 3 filings · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMC REALTY2407/08/2026
FP MET REALTY LLC703/22/2026
366 METROPOLITAN AVE103/22/2026
CRISTAL DRIVER REST CORP103/22/2026
DOW YOUNG GROUP203/21/2026
COMMODORE503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & ASSOC.203/21/2026
LU NING ARCHITECTURE, PLLC203/21/2026
SEAY-YARBROUGH203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME CONSTRUCTION NEW YOGeneral Contractor407/08/2026
ALTO ELECTRIC INCElectrical103/22/2026
DONOHUE, MICHAELElectrical103/21/2026
MCCLARIN, LEROYElectrical103/21/2026
SUPERIOR HVAC INCGeneral Contractor107/08/2026
ZATOS PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899106/26/2025
BRIAN ILL DEVELOPMENT LLC1402106/26/2025
VINCENT J. LIOTTA P. E.1974201/25/2023
LU NING ARCHITECTURE, PLL1155409/23/2022
SY ENGINEERING PLLC5149101/26/2022
Z & T ENGINEERING, P.C.591110/01/2021
Building Lifecycle
All (79)Filed (9)Permit Issued (4)Signed Off (4)Violation (31)Inspection (5)Special Inspection (26)
01/05/2026
Violation issued (FDNY_NOV, closed)
06/26/2025
Filed — Alteration
B01214987-I1
02/13/2025
Violation issued (ECB, open)
Construction
08/12/2024
Signed off — Alteration
REPAIR & REPLACE FIRE DAMAGE ON THE REAR WALL. REPAIR AND RENOVATE AS REQUIRED, NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00581825-S1
01/11/2024
Signed off — Alteration
REPAIR & REPLACE FIRE DAMAGE ON THE REAR WALL. REPAIR AND RENOVATE AS REQUIRED, NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00581825-I1
01/05/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/28/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION REQUIRED FOR FIRE AND WATER REPAIR.
B00581832-I1
07/10/2023
Signed off — Alteration
B00805191-I1
06/01/2023
Violation issued (ECB, open)
Construction
05/30/2023
Permit issued — Mechanical Systems
B00805191-I1-MS
01/25/2023
Filed — Alteration
B00805191-I1
12/28/2022
Violation issued (FDNY_NOV, closed)
10/26/2022
Violation issued (ECB, closed)
Construction
10/24/2022
Filed — Alteration
REPLACEMENT OF 8 UNITS WITH A TOTAL CAPACITY OF 6 TONS ON THE ROOF AND 3RD FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00749177-I1
10/24/2022
Violation issued (ECB, closed)
Construction
10/17/2022
Violation issued (ECB, closed)
Construction
10/17/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2022
Violation issued (ECB, closed)
Construction
10/17/2022
Violation issued (ECB, closed)
Construction
10/05/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/23/2022
Filed — Alteration
REPAIR & REPLACE FIRE DAMAGE ON THE REAR WALL. REPAIR AND RENOVATE AS REQUIRED, NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00581825-P1
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
09/23/2022
Special inspection requirement — Mechanical Systems
NING LU
09/23/2022
Special inspection requirement — Final
NING LU
09/23/2022
Special inspection requirement — Energy Code Compliance Inspections
NING LU
09/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
09/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
NING LU
09/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
NING LU
09/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
NING LU
08/22/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
NING LU
06/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
06/03/2022
Special inspection requirement — Energy Code Compliance Inspections
NING LU
06/01/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION REQUIRED FOR FIRE AND WATER REPAIR.
B00581832-P1
05/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
NING LU
05/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
NING LU
05/18/2022
Special inspection requirement — HVAC-R and service water heating system controls
NING LU
05/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
NING LU
05/18/2022
Special inspection requirement — Energy Code Compliance Inspections
NING LU
05/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
05/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
05/18/2022
Special inspection requirement — Mechanical Systems
NING LU
05/18/2022
Special inspection requirement — Energy Code Compliance Inspections
NING LU
05/18/2022
Special inspection requirement — Final
NING LU
05/18/2022
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
03/15/2022
Permit issued — Plumbing
B00581832-I1-PL
01/26/2022
Filed — Alteration
REPLACING OLD EXHAUST DUCT WITH NEW FOR EXISTING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM. EXISTING UPBLAST EXHAUST FAN TO BE REINSTALLED AFTER EXHAUST DUCT REPLACEMENT. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00661246-I1
11/19/2021
Permit issued — Structural
B00581825-S1-ST
11/18/2021
Permit issued — General Construction
B00581825-I1-GC-CX
10/01/2021
Filed — Alteration
REPAIR & REPLACE FIRE DAMAGE ON THE REAR WALL. REPAIR AND RENOVATE AS REQUIRED, NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00581825-S1
10/01/2021
Special inspection requirement — Masonry
Fei Zeng
10/01/2021
Special inspection requirement — Post-installed Anchors
Fei Zeng
10/01/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fei Zeng
09/23/2021
Filed — Alteration
REPAIR & REPLACE FIRE DAMAGE ON THE REAR WALL. REPAIR AND RENOVATE AS REQUIRED, NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B00581825-I1
09/23/2021
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION REQUIRED FOR FIRE AND WATER REPAIR.
B00581832-I1
09/23/2021
Special inspection requirement — Final
Fei Zeng
02/16/2021
Violation issued (FDNY_NOV, closed)
08/18/2015
Violation issued (FDNY_NOV, closed)
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSUPERIOR HVAC INC05/30/2023
DOB NOWPlumbingSigned-offZATOS PLBG AND HTG INC03/15/2022
DOB NOWStructuralSigned-offPRIME CONSTRUCTION NEW YO11/19/2021
DOB NOWGeneral ConstructionSigned-offPRIME CONSTRUCTION NEW YO11/18/2021
BISFPISSUEDFIRE COMMAND CO, INC04/12/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/22/2016
BISFPISSUEDMASTER FIRE SYSTEMS, INC08/16/2016
2 projects · most recent 10/24/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/24/2022——Air Conditioning Systems
Cooling
Mitsubishi Electric MSZ-GL12NA 1 tons · Ahu ×6
MXZ-SM36NAMHZ-U1 3 tons · Condensing Unit ×2
01/26/2022——Ventilation Systems
Ventilation
Captiveaire NCA18FA 4,000 CFM · Exhaust Fan ×3
3 projects · most recent 10/27/2022
General Wiring
FiledStatusContractorScope
10/27/2022CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
04/09/2022Permit IssuedALTO ELECTRIC INCGeneral Wiring
08/06/2021Permit IssuedALL WAYS ELECTRIC CORP.W—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/05/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/05/2022Fail-Final General Construction Non-Directive 14FailView ↗
08/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/23/2022Fire-Resistant Penetrations and JointsNING LUspecial
09/23/2022Mechanical SystemsNING LUspecial
09/23/2022FinalNING LUprogress
09/23/2022Energy Code Compliance InspectionsNING LUprogress
09/23/2022Fire-Resistance Rated ConstructionNING LUprogress
09/23/2022HVAC-R and service water heating equipmentNING LUenergy_progress
09/23/2022HVAC-R and service water piping design and insulationNING LUenergy_progress
09/23/2022HVAC-R and service water heating system controlsNING LUenergy_progress
06/03/2022HVAC-R and service water piping design and insulationNING LUenergy_progress
06/03/2022Fire-Resistant Penetrations and JointsNING LUspecial
06/03/2022Energy Code Compliance InspectionsNING LUprogress
05/18/2022HVAC-R and service water piping design and insulationNING LUenergy_progress
05/18/2022HVAC-R and service water heating equipmentNING LUenergy_progress
05/18/2022HVAC-R and service water heating system controlsNING LUenergy_progress
05/18/2022HVAC-R and service water piping design and insulationNING LUenergy_progress
05/18/2022Energy Code Compliance InspectionsNING LUprogress
05/18/2022Fire-Resistant Penetrations and JointsNING LUspecial
05/18/2022Fire-Resistant Penetrations and JointsNING LUspecial
05/18/2022Mechanical SystemsNING LUspecial
05/18/2022Energy Code Compliance InspectionsNING LUprogress
05/18/2022FinalNING LUprogress
05/18/2022Fire-Resistance Rated ConstructionNING LUprogress
10/01/2021MasonryFei Zengspecial
10/01/2021Post-installed AnchorsFei Zengspecial
10/01/2021Structural Stability – Alterations of existing buildingsFei Zengspecial
Latest 25 of 26.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00581825-S1Request digital key ↗
09/01/2026B00581825-I1Request digital key ↗
09/01/2026B00581825-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
04/12/2017340490409Open ↗
02/28/2017321425132Open ↗
07/26/2016321425132Open ↗
▸BISWORK PERMIT APPLICATION3
04/12/2017340490409Open ↗
12/29/2016321425132Open ↗
08/17/2016321425132Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00581825-S1Open ↗
09/01/2026B00581825-I1Open ↗
09/01/2026B00581825-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00581832-P1Open ↗
09/02/2026B00581832-P1Open ↗
08/31/2026B00581832-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00581832-P1Open ↗
08/31/2026B00581832-I1Open ↗
08/29/2026B00581825-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/12/2017340490409Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/17/2016321425132Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/12/2017340490409Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/12/2017340490409Open ↗
▸Safety & Tenant Protection8
▸DOB NOWHPD-1: Anti-Harassment Area Checklist7
08/13/2026B00661246-I1Open ↗
08/13/2026B00581825-P1Open ↗
08/13/2026B00581825-I1Open ↗
Showing 3 of 7 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
07/26/2016321425132Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00581825-S1Open ↗
09/01/2026B00581825-I1Open ↗
09/01/2026B00581832-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01214987-I1Open ↗
08/13/2026B00661246-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00581825-I1Open ↗
08/13/2026B00581832-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/12/2017340490409Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/12/2017340490409Open ↗
07/26/2016321425132Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
02/28/2017321425132Open ↗
07/26/2016321425132Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/12/2017340490409Open ↗