← Back
Miscellaneous hospital / health care facility
Queens Family Medical Center
37-11 QUEENS BOULEVARD · BIN 4003140
💬 Discuss this project
1925Year Built
2Stories
I9Building Class
M1-4Zoning
54,790 sfGross Floor Area
2Units
LL97 Covered3 Open Violations ▸
Miscellaneous hospital / health care facility · 40,000 sf lot · 1.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof14p · 4 filings · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1Under Construction14p · 5 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP504/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GENSLER307/22/2026
A&M CONSULTING611/20/2025
RIGID STRUCTURAL DESIGN, LLC203/03/2025
COSENTINI ASSOCIATES410/22/2024
IMEG Consulting Corp.110/22/2024
GMH ARCHITECTURE PLLC106/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.703/21/2026
Rigid Structural Design, LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KELAIR INCGeneral Contractor407/08/2026
W5 GROUP LLCGeneral Contractor403/21/2026
BENCHMARK BUILDERS LLCGeneral Contractor307/08/2026
P.H. WORKS INCPlumbing207/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor204/09/2026
TRISTATE AIR CONDITIONINGGeneral Contractor207/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection107/08/2026
EVERGREEN MECHANICAL CORPFire Protection107/08/2026
EVERGREEN MECHANICAL CORPPlumbing107/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor107/31/2026
MAC FELDER INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003410/22/2024
METROSPEC SIA6420107/24/2024
Building Lifecycle
All (116)Filed (17)Permit Issued (18)Signed Off (10)Violation (45)Inspection (10)Special Inspection (16)
07/30/2026
Permit issued — General Construction
Q01425414-I1-GC
07/22/2026
Filed — Alteration
General construction filing as per plans. No change in use, egress or occupancy
Q01425414-I1
07/09/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Benjamin Plotnick
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Plotnick
07/01/2026
Special inspection requirement — Final
Sandra Joslyn
02/25/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01188931-I1
01/06/2026
Signed off — Alteration
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01188907-I1
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Filed — Alteration
PROVIDE A NEW TIE-IN TO THE EXISTING GAS LINE FROM THE CELLAR TO THE ROOFTOP UNITS AS PER PLANS SUBMITTED HEREWITH.
Q01064196-P4
11/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Signed off — Alteration
Q01114791-I1
10/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/27/2025
Signed off — Alteration
Roofing replacement as per plan submitted herewith. No change in use, egress, or occupancy under this application
Q01055949-I1
10/22/2025
Signed off — Alteration
STRUCTURAL SCOPE: TRENCHING OF SLAB ON GRADE IN CELLAR, NEW STAIR AND RAMPON GRADE, MODIFICATION OF EXISTING DUNNAGE
Q01114868-I1
10/21/2025
Signed off — Alteration
SCOPE OF WORK UNDER THIS APPLICATIONS INCLUDES NEW PLUMBING FIXTURES AND ASSOCIATED DOMESTIC WATER AND SANITARY PIPING WITHIN THE AREA OF WORK. Scope of work includes new sprinklers and piping throughout the area of work.
Q01114840-I1
10/21/2025
Permit issued — General Construction
Q01055949-I1-GC
10/20/2025
Filed — Alteration
PROVIDE A NEW TIE-IN TO THE EXISTING GAS LINE FROM THE CELLAR TO THE ROOFTOP UNITS AS PER PLANS SUBMITTED HEREWITH.
Q01064196-P3
10/16/2025
Signed off — Alteration
MH FILING AS PER PLANS.
Q01114812-I1
10/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2025
Filed — Alteration
PROVIDE A NEW TIE-IN TO THE EXISTING GAS LINE FROM THE CELLAR TO THE ROOFTOP UNITS AS PER PLANS SUBMITTED HEREWITH.
Q01064196-P2
09/29/2025
Permit issued — Plumbing
Q01064196-S1-PL
09/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/01/2025
Permit issued — Mechanical Systems
Q01064196-I1-MS
03/04/2025
Permit issued — Sidewalk Shed
Q01188931-I1-SH
03/04/2025
Permit issued — Construction Fence
Q01188907-I1-FN
03/03/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01188931-I1
03/03/2025
Filed — Alteration
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01188907-I1
01/23/2025
Permit issued — Plumbing
Q01114840-I1-EW-SP
01/22/2025
Filed — Alteration
PROVIDE A NEW TIE-IN TO THE EXISTING GAS LINE FROM THE CELLAR TO THE ROOFTOP UNITS AS PER PLANS SUBMITTED HEREWITH.
Q01064196-P1
01/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/03/2025
Permit issued — Mechanical Systems
Q01114812-I1-MS
12/09/2024
Permit issued — Plumbing
Q01114840-I1-PL
12/05/2024
Permit issued — Structural
Q01114868-I1-ST
11/27/2024
Permit issued — Mechanical Systems
Q01114812-I1-MS
11/20/2024
Permit issued — General Construction
Q01114791-I1-GC
10/30/2024
Signed off — Alteration
Q01050548-I1
10/29/2024
Signed off — Alteration
Q01049469-I1
10/23/2024
Signed off — Alteration
DEMOLITION OF EXISTING SPRINKLERS FIXTURES AND ASSOCIATED PIPING.
Q01049484-I1
10/22/2024
Filed — Alteration
STRUCTURAL SCOPE: TRENCHING OF SLAB ON GRADE IN CELLAR, NEW STAIR AND RAMPON GRADE, MODIFICATION OF EXISTING DUNNAGE
Q01114868-I1
10/22/2024
Filed — Alteration
MH FILING AS PER PLANS.
Q01114812-I1
10/21/2024
Filed — Alteration
Q01114791-I1
10/16/2024
Filed — Alteration
SCOPE OF WORK UNDER THIS APPLICATIONS INCLUDES NEW PLUMBING FIXTURES AND ASSOCIATED DOMESTIC WATER AND SANITARY PIPING WITHIN THE AREA OF WORK. Scope of work includes new sprinklers and piping throughout the area of work.
Q01114840-I1
10/01/2024
Permit issued — Plumbing
Q01064196-S1-PL
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/20/2024
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
09/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
09/20/2024
Special inspection requirement — Maintenance information
Christopher Drutjons
09/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
09/20/2024
Special inspection requirement — Shutoff dampers
Christopher Drutjons
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
09/20/2024
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
09/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
09/20/2024
Special inspection requirement — Mechanical Systems
Christopher Drutjons
09/20/2024
Special inspection requirement — Final
Christopher Drutjons
09/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2024
Permit issued — Mechanical Systems
Q01064196-I1-MS
Latest 60 of 116 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP07/30/2026
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC10/21/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC09/29/2025
DOB NOWMechanical SystemsSigned-offKELAIR INC05/01/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP03/04/2025
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP03/04/2025
DOB NOWPlumbingSigned-offAGGRESSIVE FIRE PROT LLC01/23/2025
DOB NOWMechanical SystemsSigned-offTRISTATE AIR CONDITIONING01/03/2025
DOB NOWPlumbingSigned-offMAC FELDER INC12/09/2024
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC12/05/2024
DOB NOWMechanical SystemsSigned-offTRISTATE AIR CONDITIONING11/27/2024
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC11/20/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC10/01/2024
DOB NOWMechanical SystemsSigned-offKELAIR INC07/30/2024
DOB NOWSprinklersSigned-offEVERGREEN MECHANICAL CORP07/26/2024
DOB NOWSprinklersSigned-offEVERGREEN MECHANICAL CORP07/26/2024
DOB NOWGeneral ConstructionSigned-offW5 GROUP LLC06/28/2024
DOB NOWGeneral ConstructionSigned-offW5 GROUP LLC06/26/2024
BISOTISSUEDDNP BUILDERS LLC02/09/2015
BISMHISSUEDG S I SYSTEMS INC04/11/2014
BISSPISSUEDPLUMBING NYC, INC02/19/2014
BISOTISSUEDDNP BUILDERS LLC04/12/2013
BISEQISSUEDDNP BUILDERS LLC03/29/2013
BISOTISSUEDALL AIRE CONDITINONING CO10/07/2011
BISFPISSUEDFIREMASTERS07/19/2007
BISSPISSUEDCODE FIRE PROTECTION CORP06/01/2007
BISPLISSUEDPARAMOUNT PLUMBING SERVICES & AL04/24/2007
BISMHISSUEDSIGNATURE CONSTRUCTION GROUP04/13/2007
BISEQISSUEDSIGNATURE CONSTRUCTION GROUP04/13/2007
BISOTISSUEDSIGNATURE CONSTRUCTION GROUP04/13/2007
BISOTISSUEDSIGNATURE CONSTRUCTION GROUP04/13/2007
BISPLISSUEDNEW YORK STANDARD MECH CORP05/14/2002
BISPLISSUEDECONOMY P & H CO.,INC04/06/2001
BISPLISSUEDECONOMY P & H CO.,INC02/16/2001
BISOTISSUEDNY HOTEL TRADE COUNCIL & HOTEL A04/13/2000
BISPLISSUEDSTANFILL PLG HTG04/05/1995
BISMHISSUEDSTRUCTURE TONE10/21/1994
BISOTISSUEDSTRUCTURE TONE10/21/1994
BISPLISSUEDSTANFILL PLUMBNG & HEATING08/25/1994
BISPLISSUEDSTANFILL PLUMBING AND HEATING05/03/1994
+ 3 more permits on file
1 project · most recent 11/20/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/20/2025Signed-offKELAIR INCAir Conditioning Systems
Cooling
Seasons 4 LA040-3SJK33-0423-TN6.0-16SE 506,500 BTU ×4
LA030-3SJK23-0313-TN5.0-12SE 381,000 BTU ×1
LA055-3SJK33-0564-TN8.0-20SE 672,800 BTU ×1
1 project · most recent 11/20/2025
Gas
FiledStatusContractorScope
11/20/2025Signed-offP.H. WORKS INCGas
5 projects · most recent 09/22/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
09/22/2025CompleteSTRIANO ELECTRIC CO., INCGeneral Wiring
02/19/2025CompleteDIANE ELECTRIC INC.HVAC Wiring
11/25/2024CompleteSTRIANO ELECTRIC CO., INC—
08/01/2024CompletePREMIER ELECTRIC, INCGeneral Wiring
12/04/2020CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/09/2026Exterior Insulation and Finish Systems (EIFS)Benjamin Plotnickspecial
07/09/2026Energy Code Compliance InspectionsBenjamin Plotnickprogress
07/01/2026FinalSandra Joslynprogress
09/20/2024Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
09/20/2024HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
09/20/2024Maintenance informationChristopher Drutjonsenergy_progress
09/20/2024HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
09/20/2024Shutoff dampersChristopher Drutjonsenergy_progress
09/20/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
09/20/2024Sprinkler SystemsChristopher Drutjonsspecial
09/20/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
09/20/2024Mechanical SystemsChristopher Drutjonsspecial
09/20/2024FinalChristopher Drutjonsprogress
06/10/2024FinalMichael Risbergsprogress
06/10/2024Mechanical SystemsMichael Risbergsspecial
05/23/2024FinalGeorge Huangprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Queens Health CenterMedical / HealthcareFloor 1
Project Q01050548 Alteration · LOC Issued · 06/20/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/22/2026Q01049469-I1Request digital key ↗
08/22/2026Q01049484-I1Request digital key ↗
08/22/2026Q01055949-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits16
▸BISWORK PERMIT APPLICATION7
02/24/2015420820883Open ↗
04/16/2014420820892Open ↗
02/20/2014420820892Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
05/06/2013420820892Open ↗
04/10/2013420820883Open ↗
04/10/2013420820892Open ↗
Showing 3 of 7 on file for this type
▸BISPLACE OF ASSEMBLY2
01/07/2015402605944Open ↗
12/13/2014402605944Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/22/2026Q01049469-I1Open ↗
08/21/2026Q01114791-I1Open ↗
08/16/2026Q01425414-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
04/08/2015420615819Open ↗
04/08/2015420820883Open ↗
12/11/2014420820883Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01425414-I1Open ↗
09/02/2026Q01425414-I1Open ↗
08/28/2026Q01055949-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q01425414-I1Open ↗
08/27/2026Q01114840-I1Open ↗
08/24/2026Q01064196-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/01/2013420826903Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/29/2013420826903Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE PERMITS3
01/20/2012420460174Open ↗
01/20/2012420460174Open ↗
01/20/2012420460174Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
03/18/2015420820892Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/19/2012420460174Open ↗
▸BISSCHEDULE B - PLUMBING1
04/10/2013420820892Open ↗
▸Safety & Tenant Protection4
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
05/16/2013420615819Open ↗
04/17/2013420820883Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
04/17/2013420820883Open ↗
▸BISSTREET TREE CHECKLIST1
06/16/2020420666568Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/22/2026Q01049469-I1Open ↗
08/21/2026Q01114791-I1Open ↗
08/16/2026Q01425414-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/28/2012420615819Open ↗
08/28/2012420615819Open ↗
04/10/2013420820892Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
04/10/2013420820892Open ↗
03/26/2013420820883Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/20/2011420460174Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/11/2014420820883Open ↗
01/17/2014420820892Open ↗
08/28/2012420615819Open ↗
▸BISTECHNICAL REPORT: ENERGY2
01/19/2012420460174Open ↗
07/20/2011420460174Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/19/2012420460174Open ↗
▸Inspections & Test Reports1
▸BISMANUFACTURE STATEMENT: QUALITY OF MASONRY UNITS-REQUIRED PRIOR TO CONSTRUCTION OF MASONRY (B FORM 10H)1
04/10/2013420820883Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS5
04/10/2013420820883Open ↗
04/10/2013420820892Open ↗
04/01/2013420826903Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/18/2013420826903Open ↗
05/16/2013420615819Open ↗
01/19/2012420460174Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/18/2013420826903Open ↗
01/19/2012420460174Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
05/01/2015420820892Open ↗
05/01/2015420820883Open ↗
04/08/2015420615819Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
02/24/2015420820883Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
04/10/2013420820883Open ↗
04/10/2013420820892Open ↗
04/01/2013420826903Open ↗
Showing 3 of 4 on file for this type