Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Prince Condominium
37-20 PRINCE STREET · BIN 4112269
💬 Discuss this project
2008Year Built
15Stories
RMBuilding Class
C4-2Zoning
110,163 sfGross Floor Area
104Units
LL97 CoveredRent Stabilized36 Open Violations 33 unresolved · 3 paperwork only ▸FISP: No Report Filed
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE PRINCE PLAZA CONDOMINIUM · 22,500 sf lot · 4.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 39p · 4 filings · 20 docs
Floor 24p · 4 filings · 19 docs
Floor 11p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRANSAMERICA FINANCIAL ADVISORS504/09/2026
C AND C PRINCE HOLDING LLC903/22/2026
PRINCE PLAZA CONDOMINIUM INC1903/22/2026
PRINCE PLAZA7303/22/2026
THE PRINCE CONDOMINIUM,FO103/22/2026
PRINCE PLAZA LLC FOUR SEA103/22/2026
METAL STONE CONSTRUCTION1903/22/2026
GEORGE HSU METAL STONE CO103/22/2026
JTA SCAFFOLDING INC103/22/2026
METAL STOVE CONST INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
PROJECT ENTRY103/21/2026
JAY'S BUILDING CONSULTING INC.203/21/2026
LAM & LAM DESIGNS DPC203/21/2026
YOUN DESIGN CORP203/21/2026
SUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN FITZGERALD PLBG &HTGPlumbing507/08/2026
3T GC LLCGeneral Contractor407/08/2026
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
LCNY CONSTRUCTION INCGeneral Contractor303/21/2026
LLL CONSTRUCTION LLCGeneral Contractor303/21/2026
ZAQ CONSTRUCTION INCGeneral Contractor107/08/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
XH RC PLBG HTGPlumbing103/22/2026
KJK ELECTRIC INCElectrical103/22/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
ROBIN, ARTHURElectrical103/21/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
ABCAT ASSOCIATES INCGeneral Contractor104/09/2026
DONG HAE CONSTRUCTIONGeneral Contractor103/22/2026
SUPER POWER CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM&LAM DESIGNS DPC3563412/02/2025
BASSIRI8394302/05/2025
ZHENG & ASSOCIATES LLC7330201/07/2025
FANG ARCHITECT5513201/31/2023
LI ARCHITECT ASSOCIATE, P1104109/02/2021
DY SPECIAL INSPECTION LLC7210105/28/2021
Building Lifecycle
All (156)Filed (22)Permit Issued (14)Signed Off (8)Violation (60)Inspection (16)Objection (6)Special Inspection (30)
06/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
02/18/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/13/2026
Permit issued — Sprinklers
Q01307734-S2-EW-SP
12/22/2025
Permit issued — General Construction
Q01307734-I1-GC
12/02/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER HEADS FOR UNIT 2A
Q01307734-S2
11/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
Benjamin Lam
11/25/2025
Special inspection requirement — Sprinkler Systems
Benjamin Lam
10/29/2025
Violation issued (ECB, open)
Construction
10/28/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER HEADS FOR UNIT 2A
Q01307734-I1
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Lam
10/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
Benjamin Lam
08/26/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Violation issued (ECB, open)
Local Law
02/18/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN THE FIRST FLOOR UNIT #1A ONLY:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.REPLACE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01128879-I1
02/13/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN THE FIRST FLOOR UNIT #1A ONLY:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.REPLACE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01128878-I1
02/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
02/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
02/05/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN THE FIRST FLOOR UNIT #1A ONLY:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.REPLACE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01128878-P1
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/30/2025
Violation issued (ECB, open)
Construction
01/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
01/08/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
01/08/2025
Special inspection requirement — Final
Jinfar Liu
01/08/2025
Special inspection requirement — Lighting controls
Jinfar Liu
01/08/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
01/07/2025
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING OFFICE @ PARTIAL 3RD. FLOOR UNIT 3A & 3B. MECHANICAL WORK INVLOVED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01104249-P1
01/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/03/2025
Special inspection requirement — Final
Jinfar Liu
01/03/2025
Special inspection requirement — Interior lighting power
Jinfar Liu
01/03/2025
Special inspection requirement — Mechanical Systems
Jinfar Liu
01/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jinfar Liu
01/03/2025
Special inspection requirement — Lighting controls
Jinfar Liu
12/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2024
Permit issued — Plumbing
Q01128879-I1-PL
11/15/2024
Permit issued — General Construction
Q01128878-I1-GC
10/22/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN THE FIRST FLOOR UNIT #1A ONLY:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.REPLACE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01128879-I1
10/22/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN THE FIRST FLOOR UNIT #1A ONLY:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES.REPLACE ADA RESTROOM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01128878-I1
10/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
09/27/2024
Permit issued — General Construction
Q01104249-I1-GC-CX
08/30/2024
Filed — Alteration
INTERIOR RENOVATION FOR EXISTING OFFICE @ PARTIAL 3RD. FLOOR UNIT 3A & 3B. MECHANICAL WORK INVLOVED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q01104249-I1
05/07/2024
Signed off — Alteration
ONE ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00951843-I1
04/17/2024
Violation issued (HPD, closed)
A
03/13/2024
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
03/04/2024
Permit issued — Sign
Q00951843-I1-SG
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/05/2024
Signed off — Alteration
RESOLVE ECB VIOLATION #039092662N: RENOVATION OF EXISTING APARTMENT #10FWITH GENERAL CONSTRUCTION AND PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00921071-I1
02/05/2024
Signed off — Alteration
Q00921069-I1
12/17/2023
Objection resolved — Addressed
12/12/2023
Objection raised — Zoning
11/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/24/2023
Violation issued (HPD, closed)
I
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC02/13/2026
DOB NOWGeneral ConstructionSigned-offABCAT ASSOCIATES INC12/22/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG12/13/2024
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/15/2024
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC09/27/2024
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC03/04/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG08/31/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC08/30/2023
DOB NOWGeneral ConstructionPermit Issued3T GC LLC01/25/2023
DOB NOWGeneral ConstructionPermit Issued3T GC LLC01/26/2022
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN10/04/2021
DOB NOWGeneral ConstructionSigned-offLLL CONSTRUCTION LLC10/01/2021
DOB NOWGeneral ConstructionSigned-offSUPER POWER CONSTRUCTION07/12/2021
DOB NOWGeneral ConstructionPermit IssuedLCNY CONSTRUCTION INC07/06/2021
BISPLISSUEDC.R.U. MECHAN & HEAT INC07/23/2019
BISMHISSUEDDECO BUILDING GROUP CORP07/23/2019
BISSPISSUEDRRP PLUMBING CORP02/21/2018
BIS—ISSUEDKLC CONSTRUCTION LLC02/07/2018
BISOTISSUEDKING'S USA GROUP INC04/20/2017
BISPLISSUEDRRP PLUMBING CORP03/31/2016
BISSPISSUEDRRP PLUMBING CORP03/31/2016
BISOTISSUEDKLC CONSTRUCTION LLC03/24/2016
BISPLISSUEDTOP DOG PLBG & HTG CORP02/23/2016
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC02/17/2016
BISSPISSUEDRRP PLUMBING CORP11/30/2015
BISSPISSUEDRRP PLUMBING CORP09/02/2015
BISMHISSUEDH INTERIOR DESIGN CONSTRUCTION08/26/2015
BISOTISSUEDAC LEGEND CONSTRUCTION CO07/17/2015
BISPLISSUEDSO PLUMBING & HEATING INC07/10/2015
BISOTISSUEDAC LEGEND CONSTRUCTION CO07/08/2015
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC05/01/2015
BISPLISSUEDBARMOR REHAB INC04/30/2015
BISOTISSUEDFU JIAN INC04/30/2015
BISMHISSUEDFU JIAN INC04/07/2015
BISPLISSUEDCATMAN PLUMBING INC03/24/2015
BISSPISSUEDCASE PLUMBING LLC03/20/2015
BISPLISSUEDPLUMBING & HTG DOCTOR INC01/26/2015
BIS—ISSUEDDONG HAE CONSTRUCTION INC01/13/2015
BISOTISSUEDFENG WEI CONSTRUCTION INC07/21/2014
BISOTISSUEDJ J A M CONSTRUCTION INC03/04/2014
+ 24 more permits on file
2 projects · most recent 01/07/2025
Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/07/2025Permit IssuedZAQ CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C24NAHZ2 24,000 BTU · Heat Pump Outdoor ×1
MXZ-3C24NAHZ4 24,000 BTU · Heat Pump Outdoor ×1
Gree MULTI36HP230V1EO 36,000 BTU · Pump ×1
Ventilation
Greenheck SQ-160-BX-QD 1,200 CFM · Exhaust Fan ×1
01/31/2023Permit Issued3T GC LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Ventilation
1 project · most recent 12/02/2025
Sprinkler System
FiledStatusContractorScope
12/02/2025Signed-offXH&RC PLBG AND HTG INCSprinkler System
2 projects · most recent 12/02/2025
Water/Sanitary
FiledStatusContractorScope
12/02/2025———
05/03/2021——Water/Sanitary
5 projects · most recent 12/05/2023
General Wiring Lighting
FiledStatusContractorScope
12/05/2023CompleteJONG HYUN KIM—
08/22/2023CompleteKJK ELECTRIC INCGeneral Wiring
10/04/2022CompleteGOODALL ELECTRIC CORPGeneral Wiring
04/28/2022Permit IssuedEMP ELECTRIC CORPGeneral Wiring, Lighting
04/25/2018CompleteHV ELECTRIC CORPGeneral Wiring
1 project · most recent 12/02/2025
FiledStatusContractorScope
12/02/2025Signed-offXH&RC PLBG AND HTG INC1 scope_items
1 project · most recent 12/02/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/02/2025Signed-offXH&RC PLBG AND HTG INCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
06/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/18/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2024Pass-Final Sign Permit InspectionPassView ↗
11/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/23/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/26/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/27/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
11/25/2025Tenant Protection Plan ComplianceBenjamin Lamspecial
11/25/2025Sprinkler SystemsBenjamin Lamspecial
10/23/2025Fire-Resistant Penetrations and JointsBenjamin Lamspecial
10/23/2025Tenant Protection Plan ComplianceBenjamin Lamspecial
02/07/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
02/07/2025Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
02/07/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/07/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/05/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/05/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/05/2025Tenant Protection Plan Compliance—special
02/05/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
01/08/2025Tenant Protection Plan ComplianceJinfar Liuspecial
01/08/2025Mechanical SystemsJinfar Liuspecial
01/08/2025FinalJinfar Liuprogress
01/08/2025Lighting controlsJinfar Liuenergy_progress
01/08/2025Interior lighting powerJinfar Liuenergy_progress
01/03/2025FinalJinfar Liuprogress
01/03/2025Interior lighting powerJinfar Liuenergy_progress
01/03/2025Mechanical SystemsJinfar Liuspecial
01/03/2025Tenant Protection Plan ComplianceJinfar Liuspecial
01/03/2025Lighting controlsJinfar Liuenergy_progress
10/22/2024Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
06/09/2023Tenant Protection Plan Compliance—special
05/26/2023FinalALLEN SHINFELDprogress
Latest 25 of 43.
▾Documents — 836 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/27/2026Q00513109-I1Request digital key ↗
08/27/2026Q00513098-I1Request digital key ↗
08/27/2026Q00525376-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits192
▸BISPLAN / WORK APPROVAL APPLICATION100
09/08/2023421059721Open ↗
09/06/2023421059721Open ↗
10/05/2021421059721Open ↗
Showing 3 of 100 on file for this type
▸BISWORK PERMIT APPLICATION80
07/30/2019421629713Open ↗
07/30/2019421629713Open ↗
07/30/2019421629713Open ↗
Showing 3 of 80 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications7
05/01/2018420914167Open ↗
Showing 1 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISIntent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications182
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
07/18/2019421629713Open ↗
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
Showing 3 of 71 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST26
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
12/11/2017421581728Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/27/2026Q00525376-I1Open ↗
08/25/2026Q00800193-S1Open ↗
08/25/2026Q00800193-S2Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
12/11/2017421581728Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026Q01307734-S2Open ↗
09/23/2026Q01307734-S2Open ↗
09/01/2026Q01104249-P1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q01104249-P1Open ↗
09/01/2026Q01104249-P1Open ↗
09/01/2026Q01104249-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
03/14/2016440296350Open ↗
11/13/2015440267435Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
03/14/2016440296350Open ↗
11/13/2015440267435Open ↗
Showing 2 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment114
▸BISSELF-CERT PLUMBING NOTICE38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING20
03/14/2016440296350Open ↗
11/13/2015440267435Open ↗
Showing 2 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
06/25/2019421629713Open ↗
06/10/2019421629713Open ↗
01/23/2019421629713Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT12
11/18/2021421517585Open ↗
11/18/2021421517585Open ↗
11/18/2021421517585Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS7
06/29/2016421087344Open ↗
Showing 1 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
09/23/2016421202086Open ↗
11/30/2015421058795Open ↗
Showing 2 of 5 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWATER METER PERMIT : DEP-METER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/08/2017421059721Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
02/08/2018421581728Open ↗
Showing 1 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
06/06/2017421487402Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00751246-I1Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00881346-I1Open ↗
▸Energy Compliance58
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
07/18/2019421629713Open ↗
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
Showing 3 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/01/2018420914167Open ↗
05/02/2016421087344Open ↗
01/29/2016421087344Open ↗
Showing 3 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/25/2016440296350Open ↗
03/14/2016440296350Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
03/14/2016440296350Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00525376-I1Open ↗
08/13/2026Q00585454-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/25/2016440296350Open ↗
03/14/2016440296350Open ↗
11/30/2015440267435Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRO FLOW TEST LETTER1
01/23/2019421629713Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs110
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST41
11/16/2021440267435Open ↗
07/26/2021421543351Open ↗
03/04/2020421059721Open ↗
Showing 3 of 41 on file for this type
▸BISADMINISTRATIVE OBJECTIONS34
06/06/2017421487402Open ↗
04/21/2016421314955Open ↗
01/07/2016421235176Open ↗
Showing 3 of 34 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
10/27/2018421059721Open ↗
08/03/2018421059721Open ↗
08/29/2016421058795Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
09/06/2023421059721Open ↗
08/25/2021420598062Open ↗
08/19/2021420598062Open ↗
Showing 3 of 13 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT52
01/23/2019421629713Open ↗
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
Showing 3 of 52 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/12/2021440267435Open ↗
07/26/2021421543351Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
11/30/2015440267435Open ↗
▸Filing & Intake Forms59
▸BISEFILING COVER SHEET40
01/23/2019421629713Open ↗
01/23/2019421629713Open ↗
01/23/2019421517585Open ↗
Showing 3 of 40 on file for this type
▸BISADDITIONAL INFORMATION11
10/05/2021421059721Open ↗
03/03/2021421517585Open ↗
12/12/2017420914167Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM5
02/05/2019421059721Open ↗
10/27/2018421059721Open ↗
08/03/2018421059721Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/14/2016440296350Open ↗
11/13/2015440267435Open ↗
Showing 2 of 3 on file for this type
▸Other Documents8
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/01/2021421517585Open ↗
▸BISDRY PIPE VALVE TEST : FP-101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00751246-I1Open ↗