← Back
Two family frame
37-84 101 STREET
QUEENS · BIN 4044101
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R5Zoning
2,192 sfGross Floor Area
2Units
Rent Stabilized4 Open Violations ▸
Two family frame · 3,748 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2021$1.2M—— → —$570/sf building
03/09/2015$100K—Private party → Private party$46/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAM ENGINEER PC609/30/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CTI CONSTRUCTION INCGeneral Contractor107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM ENGINEER PC1180609/30/2021
Building Lifecycle
All (81)Filed (6)Permit Issued (2)Signed Off (2)Violation (35)Inspection (6)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
10/07/2021
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00547631. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547637-I1
10/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
10/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
10/01/2021
Special inspection requirement — Maintenance information
YUK LAM
10/01/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
10/01/2021
Special inspection requirement — Permanent certificate
YUK LAM
10/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
10/01/2021
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
09/30/2021
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME DWELLING. GENERAL CONSTRUCTION WORK AT CEL, 1ST, & 2ND. FL. REMOVE AND INSTALL PARTITIONS, SHEETROCK, WINDOWS, AND HARDWOOD FLOOR. INSTALL DUCTLESS SPLIT UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547631-I1
09/30/2021
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00547631. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547637-P3
09/29/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/29/2021
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
09/29/2021
Special inspection requirement — Maintenance information
YUK LAM
09/29/2021
Special inspection requirement — Permanent certificate
YUK LAM
09/29/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
09/29/2021
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
09/29/2021
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
09/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
09/21/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME DWELLING. GENERAL CONSTRUCTION WORK AT CEL, 1ST, & 2ND. FL. REMOVE AND INSTALL PARTITIONS, SHEETROCK, WINDOWS, AND HARDWOOD FLOOR. INSTALL DUCTLESS SPLIT UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547631-P1
09/21/2021
Special inspection requirement — Maintenance information
YUK LAM
09/21/2021
Special inspection requirement — Air barrier - visual inspection
YUK LAM
09/21/2021
Special inspection requirement — Fenestration air leakage
YUK LAM
09/21/2021
Special inspection requirement — Fire-Resistance Rated Construction
YUK LAM
09/21/2021
Special inspection requirement — Final
YUK LAM
09/21/2021
Special inspection requirement — Energy Code Compliance Inspections
YUK LAM
09/21/2021
Special inspection requirement — Mechanical Systems
YUK LAM
09/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
09/21/2021
Special inspection requirement — Fenestration areas
YUK LAM
09/21/2021
Special inspection requirement — Permanent certificate
YUK LAM
09/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
YUK LAM
09/21/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
YUK LAM
09/21/2021
Special inspection requirement — HVAC-R and service water heating system controls
YUK LAM
09/21/2021
Special inspection requirement — HVAC-R and service water heating equipment
YUK LAM
09/20/2021
Special inspection requirement — Maintenance information
YUK LAM
09/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUK LAM
09/17/2021
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00547631. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547637-P2
09/16/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2021
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00547631. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547637-P1
08/13/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/13/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2021
Permit issued — General Construction
Q00547631-I1-GC-CX
07/02/2021
Permit issued — Plumbing
Q00547637-I1-PL
06/30/2021
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00547631. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547637-I1
06/30/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME DWELLING. GENERAL CONSTRUCTION WORK AT CEL, 1ST, & 2ND. FL. REMOVE AND INSTALL PARTITIONS, SHEETROCK, WINDOWS, AND HARDWOOD FLOOR. INSTALL DUCTLESS SPLIT UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00547631-I1
04/21/2021
Violation issued (HPD, closed)
I
08/02/2019
Violation issued (ECB, closed)
Construction
08/31/2018
Violation issued (ECB, closed)
Construction
05/03/2018
Violation issued (HPD, closed)
B
05/03/2018
Violation issued (HPD, closed)
B
05/03/2018
Violation issued (HPD, closed)
B
05/03/2018
Violation issued (HPD, closed)
B
05/01/2018
Violation issued (HPD, closed)
B
05/01/2018
Violation issued (HPD, closed)
B
05/01/2018
Violation issued (HPD, closed)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCTI CONSTRUCTION INC07/02/2021
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC07/02/2021
BISPLISSUEDTHE PLUMBING COMPANY INC01/18/2007
BISOTISSUEDN/A01/18/2007
1 project · most recent 08/24/2021
General Wiring
FiledStatusContractorScope
08/24/2021CompleteAERO ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/29/2021Pass-Final General Construction Non-Directive 14PassView ↗
09/16/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/13/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
10/01/2021Fire-Resistant Penetrations and JointsYUK LAMspecial
10/01/2021HVAC-R and service water heating equipmentYUK LAMenergy_progress
10/01/2021Maintenance informationYUK LAMenergy_progress
10/01/2021HVAC-R and service water piping design and insulationYUK LAMenergy_progress
10/01/2021Permanent certificateYUK LAMenergy_progress
10/01/2021HVAC-R and service water heating system controlsYUK LAMenergy_progress
10/01/2021Energy Code Compliance InspectionsYUK LAMprogress
09/29/2021Energy Code Compliance InspectionsYUK LAMprogress
09/29/2021Maintenance informationYUK LAMenergy_progress
09/29/2021Permanent certificateYUK LAMenergy_progress
09/29/2021HVAC-R and service water piping design and insulationYUK LAMenergy_progress
09/29/2021HVAC-R and service water heating equipmentYUK LAMenergy_progress
09/29/2021HVAC-R and service water heating system controlsYUK LAMenergy_progress
09/29/2021Fire-Resistant Penetrations and JointsYUK LAMspecial
09/21/2021Maintenance informationYUK LAMenergy_progress
09/21/2021Air barrier - visual inspectionYUK LAMenergy_progress
09/21/2021Fenestration air leakageYUK LAMenergy_progress
09/21/2021Fire-Resistance Rated ConstructionYUK LAMprogress
09/21/2021FinalYUK LAMprogress
09/21/2021Energy Code Compliance InspectionsYUK LAMprogress
09/21/2021Mechanical SystemsYUK LAMspecial
09/21/2021Fire-Resistant Penetrations and JointsYUK LAMspecial
09/21/2021Fenestration areasYUK LAMenergy_progress
09/21/2021Permanent certificateYUK LAMenergy_progress
09/21/2021HVAC-R and service water piping design and insulationYUK LAMenergy_progress
Latest 25 of 56.
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00547637-P3Request digital key ↗
08/27/2026Q00547637-P2Request digital key ↗
08/27/2026Q00547637-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature12
09/19/2026Q00547631-P1Open ↗
09/19/2026Q00547631-P1Open ↗
09/01/2026Q00547631-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00547637-P3Open ↗
08/27/2026Q00547637-P2Open ↗
08/27/2026Q00547637-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/19/2026Q00547631-P1Open ↗
09/01/2026Q00547631-I1Open ↗
08/30/2026Q00547637-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00547637-P3Open ↗
08/27/2026Q00547637-P2Open ↗
08/27/2026Q00547637-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00547631-I1Open ↗
08/13/2026Q00547637-I1Open ↗