| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01443914 ↗ | 159 2 AVENUE MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 09/30/2026 | Owner BEACH LANE MANAGEMENT Contractor SJ CONSTR DESIGN INC | Proposed interior renovaton of exist. store at ground floor and modification of storefront. General construction work as per plan submitted.… |
| Q01456171 ↗ | 37-33 100 STREET QUEENS | — | Permit Issued | — | 09/28/2026 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01456334 ↗ | 742 44 STREET BROOKLYN | Alteration | Permit Issued | 09/15/2026 | 09/18/2026 | Owner Changler LLC Contractor RONG MAINTENANCE INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01433231 ↗ | 150-01 61 ROAD QUEENS | — | Signed-off | — | 09/18/2026 | Contractor LXC CONSTRUCTION INC | PROPOSED MECHANICAL SYSTEM WORK FILED IN CONJUNCTION WITH JOB#Q01237863. INSTALL DUCTLESS SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, … |
| B01403901 ↗ | 524 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 06/03/2026 | 09/17/2026 | Contractor NYC BUILDING SOLUTIONS CO | SUBSEQUENT FILING PLUMBING WORK, REMOVE A KITCHEN, AND RENOVATE BATHROOM. INSTALL A NEW FIREPLACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01455348 ↗ | 449 57 STREET BROOKLYN | Alteration | Permit Issued | 09/11/2026 | 09/16/2026 | Contractor CATMAN PLUMBING INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01443914 ↗ | 159 2 AVENUE MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 09/30/2026 | Owner BEACH LANE MANAGEMENT Contractor SJ CONSTR DESIGN INC | Proposed interior renovaton of exist. store at ground floor and modification of storefront. General construction work as per plan submitted.… |
| Q01456171 ↗ | 37-33 100 STREET QUEENS | — | Permit Issued | — | 09/28/2026 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01456334 ↗ | 742 44 STREET BROOKLYN | Alteration | Permit Issued | 09/15/2026 | 09/18/2026 | Owner Changler LLC Contractor RONG MAINTENANCE INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01433231 ↗ | 150-01 61 ROAD QUEENS | — | Signed-off | — | 09/18/2026 | Contractor LXC CONSTRUCTION INC | PROPOSED MECHANICAL SYSTEM WORK FILED IN CONJUNCTION WITH JOB#Q01237863. INSTALL DUCTLESS SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, … |
| B01403901 ↗ | 524 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 06/03/2026 | 09/17/2026 | Contractor NYC BUILDING SOLUTIONS CO | SUBSEQUENT FILING PLUMBING WORK, REMOVE A KITCHEN, AND RENOVATE BATHROOM. INSTALL A NEW FIREPLACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01455348 ↗ | 449 57 STREET BROOKLYN | Alteration | Permit Issued | 09/11/2026 | 09/16/2026 | Contractor CATMAN PLUMBING INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01407839 ↗ | 32-42 45 STREET QUEENS | Alteration CO | Permit Issued | 06/01/2026 | 09/11/2026 | Owner SWIFTOP OF ASTORIA INC | Proposed to convert existing 3 story building from mixed use to 3 dwelling units. General construction and mechanical work as per plan submi… |
| Q01292164 ↗ | 23-10 44 DRIVE QUEENS | Alteration CO | Permit Issued | 10/13/2025 | 09/10/2026 | Contractor EXCELLENT METROPOLITAN | PROPOSED VERTICAL ENLARGEMENT OF EXIST. ONE STORY BRICK BUILDING. PROPOSED TWO EATING AND DRINKING ESTABLISHMENTS AND TWO STORY BRICK COMMER… |
| Q01450108 | 37-35 93 STREET QUEENS | — | Permit Issued | — | 09/08/2026 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01376131 ↗ | 34-33 29 STREET QUEENS | Alteration | Permit Issued | 04/08/2026 | 08/21/2026 | Owner JJL Astoria Inc Contractor S & L PLUMBING INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL BATHROOM, KITCHEN,AND BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01362677 ↗ | 30-40 37 STREET QUEENS | Alteration | Permit Issued | 03/09/2026 | 08/20/2026 | Owner Yan Ming Inc Contractor CATMAN PLUMBING INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL BATHROOM, KITCHEN, AND BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01417469 ↗ | 23-10 44 DRIVE QUEENS | Alteration | Permit Issued | 06/21/2026 | 08/03/2026 | Owner E B H HOLDING INC Contractor EXCELLENT METROPOLITAN | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#Q01292164-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| Q01321292 ↗ | 40-04 97 STREET QUEENS | Alteration | Permit Issued | 11/20/2025 | 07/30/2026 | Contractor GREENPOINT CONSTRUCTION C | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01372655 ↗ | 56-48 EAST HAMPTON BLVD QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/22/2026 | 07/13/2026 | Contractor VILLAGE P & H NY INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01411112 ↗ | 56-48 EAST HAMPTON BLVD QUEENS | Alteration | Permit Issued | 06/04/2026 | 07/02/2026 | Contractor 2022 A N J CONSTRUCTION * | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB# Q01372655. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01175338 ↗ | 151 EAST 90 STREET MANHATTAN | Alteration | Permit Issued | 02/14/2025 | 06/16/2026 | Owner EAST 82ND ST REALTY LLC Contractor KINGFISHER GENERAL CONTR* | SUBSEQUENT FILING PLUMBING WORK. INSTALL PLUMBING FIXTURES AT UNIT 4C AND 5C. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01415002 | 30-07 VERNON BOULEVARD QUEENS | Alteration CO | Filed — no permit on record | 06/15/2026 | — | — | — |
| B01356522 ↗ | 2183 78 STREET BROOKLYN | Alteration CO | Permit Issued | 02/19/2026 | 06/10/2026 | Owner ZXNY21 LLC Contractor ROCK E SMALL PLBG&HTG INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01237863 ↗ | 150-01 61 ROAD QUEENS | Alteration CO | Permit Issued | 06/16/2025 | 06/05/2026 | Contractor WATSON'S PLBG, HTG, & BDG | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHENS AND BATHROOMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01402560 ↗ | 2183 78 STREET BROOKLYN | Alteration | Permit Issued | 05/14/2026 | 06/03/2026 | Owner ZXNY21 LLC Contractor LXC CONSTRUCTION INC | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#B01356522. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01223833 ↗ | 1038 63 STREET BROOKLYN | Alteration | Permit Issued | 05/14/2025 | 06/02/2026 | Contractor LXC CONSTRUCTION INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01408660 ↗ | 195 WEST HOUSTON STREET MANHATTAN | Alteration | Permit Issued | 06/01/2026 | 06/02/2026 | Owner Phase III NYC Contractor HONOR CONSTRUCTION INC | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#M01193169-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| Q01262108 ↗ | 150-01 61 ROAD QUEENS | Alteration | Signed-off | 07/29/2025 | 06/01/2026 | Contractor LXC CONSTRUCTION INC | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB# Q01237863. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01390356 ↗ | 346 58 STREET BROOKLYN | Alteration | Permit Issued | 04/22/2026 | 05/28/2026 | Contractor ROCK E SMALL PLBG&HTG INC | Subsequent filing for plumbing work, install a bathroom and boiler room. No change in use, egress, or occupancy. |
| Q01394820 ↗ | 42-37 79 STREET QUEENS | Alteration | Signed-off | 05/02/2026 | 05/12/2026 | Contractor NY BUILDING ASSOCIATES IN | PROPOSED TO REMOVE THE DETACHED STRUCTURE IN THE REAR YARD DUE TO FIRE DAMAGE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01303045 ↗ | 837 60 STREET BROOKLYN | Alteration | Permit Issued | 10/28/2025 | 05/11/2026 | Owner PXP 60st LLC Contractor LIONHEART CONSTRUCTION CO | PROPOSED TO REPLACE PARAPET WALLS AS PER THE PLAN SUBMITTED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01302730 ↗ | 10-41 48 AVENUE QUEENS | Alteration | Permit Issued | 10/15/2025 | 05/11/2026 | Contractor TLS CONSTRUCTION GROUP I* | APPLICATION FILED TO RESOLVE ECB VIOLATION#39159641H; REMOVE A DOOR AT EXPOSURE#4 & INSTALL NEW WALLS TO CLOSE THE WINDOW AND DOOR OPENINGS.… |
| Q01299479 ↗ | 47-08 11 STREET QUEENS | Alteration | Signed-off | 10/15/2025 | 05/05/2026 | Owner Yun Home LLC Contractor CROWN PLUMBING INC | SUBSEQUENT FILING MECHANICAL SYSTEM WORK. INSTALL DUCTLESS SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01385723 ↗ | 535 51 STREET BROOKLYN | Alteration | Permit Issued | 04/23/2026 | 04/29/2026 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING PLUMBING WORK. INSTALL WATER HEATERS AND A BATHROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01351575 ↗ | 39-13 BELL BOULEVARD QUEENS | Alteration | Permit Issued | 02/03/2026 | 04/27/2026 | Contractor RONG MAINTENANCE INC | SUBSEQUENT FILING PLUMBING WORK. INSTALL PLUMBING FIXTURES & COOKING EQUIPMENTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01205012 ↗ | 33-24 163 STREET QUEENS | Alteration | Signed-off | 04/16/2025 | 04/22/2026 | Contractor HP SERVICES INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL BATHROOM AND BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01373940 ↗ | 1529 67 STREET BROOKLYN | Alteration | Signed-off | 03/30/2026 | 04/06/2026 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING PLUMBING WORK TO INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01199964 ↗ | 179 LUDLOW STREET MANHATTAN | Alteration | Permit Issued | 04/02/2025 | 03/16/2026 | Contractor WJ CONTRACTING CORP | SUBSEUQENT FILING STRUCTURAL WORK FOR THE PROPSED OPENINGS AT 1ST FLOOR. INSTALL STEEL HEADER BEAMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01298071 ↗ | 119-07 14 AVENUE QUEENS | Alteration CO | Permit Issued | 10/10/2025 | 02/25/2026 | Owner W912 Realty Inc. Contractor J&P METRO DEV GROUP INC | SUBSEQUENT FILING FOR PLUMBING WORK INSTALL BOILER ROOM, KITCHEN & BATHROOM, AND INSTALL SPRINKLERS IN BASEMENT. NO CHANGE IN USE, EGRESS, O… |
| B01231257 ↗ | 1038 63 STREET BROOKLYN | Alteration | Signed-off | 06/24/2025 | 01/07/2026 | Contractor LXC CONSTRUCTION INC | PROPOSED SHORING & EXCAVATION WORK IN CONJUNCTION WITH JOB#B01223833. INSTALL WOOD PILES AND LAGGINGS TO SUPPORT EXCAVATION. NO CHANGE IN US… |
| Q01332238 ↗ | 91-09 CORONA AVENUE QUEENS | Alteration | Signed-off | 12/14/2025 | 01/07/2026 | Contractor S & L PLUMBING INC | Subsequent filing to add a residential boiler. No change in use, egress, or occupancy. |
| B01315431 ↗ | 1178 71 STREET BROOKLYN | Alteration | Signed-off | 11/09/2025 | 12/29/2025 | Contractor S & L PLUMBING INC | SUBSEQUENT FILING PLUMBING WORK TO INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01336254 ↗ | 1178 71 STREET BROOKLYN | Alteration | Signed-off | 12/20/2025 | 12/24/2025 | Contractor NY BUILDING ASSOCIATES IN | PROPOSED INTERIOR RENOVATION OF CEL, 1ST AND 2ND FLOOR. REMOVE & INSTALL PARTITIONS, FLOOR, AND WINDOWS. NO CHANGE IN USE, EGRESS, OR OCCUPA… |
| Q01302058 ↗ | 27-31 164 STREET QUEENS | Alteration | Signed-off | 10/17/2025 | 12/08/2025 | Contractor NY BUILDING ASSOCIATES IN | APPLICATION FILED TO RESOLVE ECB VIOLATION#39163363Z. LEGALIZE OVERHANG ROOF WITH WOOD POSTS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. NO CHA… |
| Q01309744 ↗ | 85-27 54 AVENUE QUEENS | Alteration | Permit Issued | 11/16/2025 | 11/26/2025 | Contractor SHUN XING CAPITAL IMPT IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL BATHROOM, KITCHEN,AND BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01297154 ↗ | 854 58 STREET BROOKLYN | Alteration | Signed-off | 10/11/2025 | 10/16/2025 | Contractor NY BUILDING ASSOCIATES IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01149489 ↗ | 1969 20 DRIVE BROOKLYN | Alteration | Permit Issued | 12/15/2024 | 08/28/2025 | Owner Y CONSTRUCTION INC. Contractor LXC CONSTRUCTION INC Filer YE DEVELOPMENT INC. | PROPOSED STRUCTURAL WORK IN CONJUNCTION WITH NB JOB#B00917070. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01199979 ↗ | 205 EAST HOUSTON STREET MANHATTAN | Alteration | Signed-off | 04/04/2025 | 08/27/2025 | Contractor WJ CONTRACTING CORP Filer EVAN CHAN ARCHITECT P.C. | SUBSEUQENT FILING STRUCTURAL WORK FOR THE PROPSED OPENINGS ON 1ST FLOOR. INSTALL STEEL HEADER BEAMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01149484 ↗ | 1969 20 DRIVE BROOKLYN | Alteration | Permit Issued | 12/06/2024 | 08/25/2025 | Owner Ye Development Inc. Contractor LXC CONSTRUCTION INC | Subsequent filing for support of excavation. Install soldier piles and lagging. No change in use, egress, or occupancy. |
| Q00832953 ↗ | 91-09 CORONA AVENUE QUEENS | Alteration | Signed-off | 10/11/2023 | 08/25/2025 | Contractor MPS PLUMBING & HEATING INC | PROPOSED SPRINKLER INSTALLATION IN CONJUNCTION WITH JOB#Q00503475. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01231340 ↗ | 47-20 190 STREET QUEENS | Alteration | Signed-off | 05/25/2025 | 08/08/2025 | Contractor SKY ONE CONSTRUCTION, INC | APPLICATION FILED TO RESOLVE ECB VIOLATION#39031028R. REMOVE ILLEGAL WOODEN STRUCTURES IN REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01231255 ↗ | 1038 63 STREET BROOKLYN | Alteration | Signed-off | 06/22/2025 | 08/07/2025 | Contractor LXC CONSTRUCTION INC | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#B01223833. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00503475 ↗ | 91-09 CORONA AVENUE QUEENS | Alteration CO | Permit Issued | 05/19/2021 | 08/07/2025 | Contractor TLS CONSTRUCTION GROUP I* | PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING 2 1/2 STORY BRICK BUILDING, AND COVERT TO 3 STORY MIXED USE BRICK BUILDING. OBTAIN … |
| B01216690 ↗ | 468 59 STREET BROOKLYN | Alteration | Signed-off | 04/29/2025 | 08/01/2025 | Contractor LXC CONSTRUCTION INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01194243 ↗ | 528 EAST 82 STREET MANHATTAN | Alteration | Signed-off | 03/25/2025 | 07/14/2025 | Owner EAST 82ND ST REALTY LLC Contractor CLEAN TECH MECHANICAL INC | SUBSEQUENT FILING PLUMBING WORK. INSTALL PLUMBING FIXTURES FROM 1ST TO 6TH FLOOR. REMOVE AND CAP GAS RANGE ON ALL FLOORS. NO CHANGE IN USE, … |
| Q01108573 ↗ | 42-37 161 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 09/30/2024 | 07/09/2025 | Contractor GREENPOINT CONSTRUCTION C | SUBSEQUENTLY FILING FOR SUPPORT OF EXCAVATION. INSTALL SOLDIER PILES AND WOOD LAGGING. INSTALL NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01241533 ↗ | 347 65 STREET BROOKLYN | Alteration | Signed-off | 06/18/2025 | 06/27/2025 | Contractor NY BUILDING ASSOCIATES IN | SUBSEQUENT FILING PLUMBING WORK. INSTALL BOILER ROOM, AND LAUNDRY AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01222569 ↗ | 47-39 35 STREET QUEENS | Alteration | Permit Issued | 05/21/2025 | 06/11/2025 | Contractor HONOR CONSTRUCTION INC | PROPOSED TO INSTALL DUCTLESS AC UNITS AND DUNNAGE ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01050094 ↗ | 31-57 103 STREET QUEENS | Alteration | Signed-off | 05/28/2024 | 06/02/2025 | Contractor WASOFF PLBG & UTILITY CO | Subsequent filing for plumbing work. Install bathroom and boiler room in cellar. No change in use, egress, or occupancy. |
| S01207807 ↗ | 185 - 205 BRICKTOWN WAY STATEN ISLAND | Alteration | Signed-off | 04/12/2025 | 06/02/2025 | Contractor RONG MAINTENANCE INC | SUBSEQUENT FILING PLUMBING WORK. INSTALL PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01048542 ↗ | 56-01 39 AVENUE QUEENS | Alteration | Signed-off | 06/05/2024 | 05/14/2025 | Owner BIH Y WU TRUST Contractor LIONHEART CONSTRUCTION CO | PROPOSED EXTERIOR STRUCTURAL WORK, REPLACE STEEL LINTELS, BRICKS, AND PARAPET WALL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01215250 ↗ | 37-85 102 STREET QUEENS | Alteration | Signed-off | 04/30/2025 | 05/12/2025 | Contractor NY BUILDING ASSOCIATES IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01212603 ↗ | 41-22 BENHAM STREET QUEENS | Alteration | Signed-off | 04/18/2025 | 05/06/2025 | Contractor NY BUILDING ASSOCIATES IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01196504 ↗ | 142-33 60 AVENUE QUEENS | Alteration | Signed-off | 03/21/2025 | 04/24/2025 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01200826 ↗ | 42-37 161 STREET QUEENS | Alteration | Signed-off | 03/26/2025 | 04/16/2025 | Contractor GREENPOINT CONSTRUCTION C | PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#Q01108573. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01136504 ↗ | 23-54 27 STREET QUEENS | Alteration | Signed-off | 11/07/2024 | 04/15/2025 | Contractor NY BUILDING ASSOCIATES IN | SUBSEQUENT FILING MECHANICAL SYSTEM WORK. INSTALL DUCTLESS SPLIT HEAT PUMP SYSTEM.NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01183133 ↗ | 132-59 MAPLE AVENUE QUEENS | Alteration | Signed-off | 02/24/2025 | 03/17/2025 | Contractor NY BUILDING ASSOCIATES IN | PROPOSED GENERAL CONSTRUCTION AND STRUCTURAL WORK. INSTALL PORCH AND RAMP IN THE REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00946200 ↗ | 91-09 CORONA AVENUE QUEENS | Alteration | Signed-off | 10/11/2023 | 03/03/2025 | Contractor S & L PLUMBING INC | PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00503475. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01175332 ↗ | 486 EAST 74 STREET MANHATTAN | Alteration | Permit Issued | 02/11/2025 | 02/28/2025 | Owner EAST 82ND ST REALTY LLC Contractor CLEAN TECH MECHANICAL INC | SUBSEQUENT FILING PLUMBING WORK. INSTALL PLUMBING FIXTURES AT UNIT 4D. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01065764 ↗ | 12-11 JACKSON AVENUE QUEENS | Alteration | Signed-off | 08/16/2024 | 02/24/2025 | Owner E B H HOLDING INC Contractor KLE CONSTRUCTION INC | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & UTILITY ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01164329 ↗ | 97-12 37 AVENUE QUEENS | Alteration | Signed-off | 01/22/2025 | 01/29/2025 | Contractor WASOFF PLBG & UTILITY CO | Subsequent filing for plumbing work. Install bathroom and utility room. No change in use, egress, or occupancy. |
| Q01162239 ↗ | 144-55 25 DRIVE QUEENS | Alteration | Signed-off | 01/03/2025 | 01/07/2025 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01143568 ↗ | 37-49 94 STREET QUEENS | Alteration | Signed-off | 12/03/2024 | 12/06/2024 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01146005 ↗ | 144-55 25 DRIVE QUEENS | Alteration | Filed — no permit on record | 11/26/2024 | — | — | — |
| Q01140197 ↗ | 104-15 37 ROAD QUEENS | Alteration | Signed-off | 11/19/2024 | 11/25/2024 | Contractor NY BUILDING ASSOCIATES IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01133274 ↗ | 42-37 161 STREET QUEENS | Alteration | Filed — no permit on record | 11/05/2024 | — | — | — |
| Q01130389 ↗ | 91-09 CORONA AVENUE QUEENS | Alteration | Signed-off | 10/23/2024 | 11/04/2024 | Contractor TLS CONSTRUCTION GROUP I* | FILING FOR CONSTRUCTION FENCE IN CONJUNCTION WITH JOB#Q00503475. PROPOSED TO INSTALL 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE. NO CHANGE… |
| Q01130069 ↗ | BIN 4625333 QUEENS | New Building | Filed — no permit on record | 10/27/2024 | — | — | — |
| Q01053544 ↗ | 31-15 98 STREET QUEENS | Alteration | Signed-off | 06/04/2024 | 10/08/2024 | Contractor SHUN XING CAPITAL IMPT IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B01112895 ↗ | 230 UTICA AVENUE BROOKLYN | Alteration | Signed-off | 09/18/2024 | 09/25/2024 | Owner 230 Utica LLC Contractor RONG MAINTENANCE INC | SUBSEQUENT FILING PLUMBING WORK. INSTALL PLUMBING FIXTURES.NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00713401 ↗ | 323 EAST 93 STREET MANHATTAN | Alteration | Signed-off | 04/07/2022 | 09/23/2024 | Owner EAST 82ND ST REALTY LLC Contractor EAST 82ND ST REALTY LLC | PROPOSED INTERIOR RENOVATION OF CELLAR AND 1ST FLOOR. GENERAL CONSTRUCTION WORK. INSTALL PARTITIONS, REPLACE HARDWOOD FLOOR, AND SHEETROCK. … |
| Q01104976 ↗ | 19-06 150 STREET QUEENS | Alteration | Signed-off | 09/16/2024 | 09/20/2024 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL BOILER ROOM, KITCHEN,AND BATHROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B08050060 ↗ | 7301 10 AVENUE BROOKLYN | Alteration | Signed-off | 12/07/2022 | 09/18/2024 | Contractor L2 CONSTRUCTION INC | PROPOSED INTERIOR RENOVATION OF CELLAR, INSTALL BOILER ROOM AND LAUNDRY AREA. INSTALL STEPS IN YARD . NO CHANGE IN USE, EGRESS, OR OCCUPANCY… |
| Q01070866 ↗ | 37-82 101 STREET QUEENS | Alteration | Signed-off | 07/05/2024 | 09/10/2024 | Owner CTI CONSTRUCTION INC Contractor CTI CONSTRUCTION INC | PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME DWELLING. GENERAL CONSTRUCTION WORK AT CEL, 1ST, & 2ND. FL. REMOVE AND INSTALL PARTITI… |
| Q01076556 ↗ | 32-48 42 STREET QUEENS | Alteration | Signed-off | 07/28/2024 | 09/06/2024 | Owner CHANG SONG INC Contractor L2 CONSTRUCTION INC | PROPOSED MECHANICAL SYSTEM WORK FILED IN CONJUNCTION WITH JOB#Q00888475. INSTALL SPLIT HEAT PUMP SYSTEM.NO CHANGE IN USE, EGRESS, OR OCCUPAN… |
| B00918774 ↗ | 6920 17 AVENUE BROOKLYN | Alteration | Permit Issued | 09/27/2023 | 09/04/2024 | Contractor CS RENOVATION INC | PROPOSED SHORING & EXCAVATION WORK IN CONJUNCTION WITH JOB#B00918770. INSTALL STEEL PILES AND WOOD LAGGINGS TO SUPPORT EXCAVATION. NO CHANGE… |
| B00918770 ↗ | 6920 17 AVENUE BROOKLYN | Alteration | Permit Issued | 09/20/2023 | 08/19/2024 | Contractor CS RENOVATION INC | PROPOSED FOUNDATION WORK IN CONJUNCTION WITH JOB#B00833758. INSTALL SHALLOW CONCRETE FOUNDATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00869960 ↗ | 6920 17 AVENUE BROOKLYN | Alteration | Permit Issued | 05/08/2023 | 08/08/2024 | Contractor CS RENOVATION INC | PROPOSED PARTIAL DEMOLITION AND STRUCTURAL WORK FILED IN CONJUNCTION WITH JOB#B00833758. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01070868 ↗ | 37-82 101 STREET QUEENS | Alteration | Signed-off | 07/05/2024 | 07/09/2024 | Owner CTI CONSTRUCTION INC Contractor QMB PLUMBING & HEATING INC | PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q01070866. INSTALL BOILER ROOM, KITCHEN,AND BATHROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01063024 ↗ | 42-23 78 STREET QUEENS | Alteration | Signed-off | 06/27/2024 | 07/01/2024 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00129411 ↗ | 18-23 124 STREET QUEENS | Alteration | Signed-off | 01/15/2023 | 05/31/2024 | Contractor ALLPRO GENERAL CNTRTING C | PROPOSED TO INSTALL 9' CURB CUT (6'+ 1'-6 SPLAY ON EACH SIDE) LOCATED 200' FROM CORNER OF 18 AVENUE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00485432 ↗ | 228 55 STREET BROOKLYN | Alteration | Signed-off | 03/22/2021 | 05/14/2024 | Owner 228 UNITED REALTY LLC Contractor CATMAN PLUMBING INC | TO FILE PL WORK IN CONJUNCTION WITH NB JOB#321995490.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01037139 ↗ | 440 EAST 75 STREET MANHATTAN | Alteration | Signed-off | 05/06/2024 | 05/13/2024 | Contractor D R INTERIORS | Proposed general construction work at Apt. 5 on 2nd floor; remove and install sheetrock, partitions, and windows. No change in use, egress,… |
| B00938892 ↗ | 747 53 STREET BROOKLYN | Alteration | Permit Issued | 09/29/2023 | 05/02/2024 | Contractor JJK BUILDING CONSULTING | PROPOSED STRUCTURAL WORK IN CONJUNCTION WITH JOB #B08022307. EXTERIOR WORK TO REPAIR FACADE. NO CHANGE IN USE, EGRESS, OR OCUPPANCY. |
| Q00985350 ↗ | 28-23 STEINWAY STREET QUEENS | Alteration CO | Permit Issued | 01/15/2024 | 04/15/2024 | Owner STONEEL LLC Contractor L2 CONSTRUCTION INC | SUBSEQUENT FILING MECHANICAL WORK. INSTALL DUCTLESS SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01010634 ↗ | 321 EAST 85 STREET MANHATTAN | Alteration | Signed-off | 03/10/2024 | 04/04/2024 | Contractor NEW MH CONTRACTING INC | PROPOSED TO REPLACE EXTERIOR STAIR IN THE FRONT . NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00973070 ↗ | 10-57 50 AVENUE QUEENS | Alteration | Signed-off | 12/19/2023 | 04/02/2024 | Contractor CITYWIDE PLBG HTG & SPKLS | Subsequently filing for plumbing work. Install kitchen and bathroom. No change in use, egress, or occupancy. |
| Q01020212 ↗ | 28-23 STEINWAY STREET QUEENS | Alteration | Signed-off | 03/24/2024 | 03/27/2024 | Owner STONEEL LLC Contractor WASOFF PLBG & UTILITY CO | PROPOSED PLUMBING WORK IN CONJUNCTION WITH JOB#Q00985350. INSTALL KITCHEN AND BATHROOM. NO CHANGE IN USE, EGRESS,OR OCCUPANCY. |
| Q00903499 ↗ | 35-44 92 STREET QUEENS | Alteration | Signed-off | 08/06/2023 | 03/25/2024 | Contractor SHUN XING CAPITAL IMPT IN | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL BATHROOM, KITCHEN,AND BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00963078 ↗ | 31-45 DOWNING STREET QUEENS | Alteration | Signed-off | 11/21/2023 | 03/11/2024 | Owner JAPANESE FOOD DEPOT LLC Contractor LIN AND SONS CORP | Proposed to install shipping container canopy. No change in use, egress, or occupancy. |
| Q00888475 ↗ | 32-48 42 STREET QUEENS | Alteration CO | Permit Issued | 06/11/2023 | 02/28/2024 | Owner SWIFTOP OF ASTORIA INC Contractor CATMAN PLUMBING INC | SUBSEQUENT FILING PLUMBING WORK. INSTALL BOILER ROOM, KITCHEN, AND BATHROOM.NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q01003873 ↗ | 37-26 94 STREET QUEENS | Alteration | Signed-off | 02/25/2024 | 02/27/2024 | Contractor WASOFF PLBG & UTILITY CO | SUBSEQUENT FILING FOR PLUMBING WORK. INSTALL KITCHEN, BATHROOM, & BOILER ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00961542 ↗ | 32-48 42 STREET QUEENS | Alteration | Signed-off | 11/14/2023 | 02/22/2024 | Owner CHANG SONG INC Contractor S & L PLUMBING INC | PROPOSED SPRINKLER WORK FILED IN CONJUNCTION WITH JOB#Q00888475. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00985310 ↗ | 63 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 01/07/2024 | 02/21/2024 | Contractor HAPPY HOUSE CONSTRUCTION | Subsequently filing for plumbing work. No change in use, egress, or occupancy. |
| M00991832 ↗ | 217 WEST 79 STREET MANHATTAN | Alteration | Signed-off | 02/06/2024 | 02/20/2024 | Owner ABC REALTY Contractor WASOFF PLBG & UTILITY CO | Subsequently filing for plumbing work for the store on 1st floor. No change in use, egress, or occupancy. |
| Person | Filings | Most recent |
|---|---|---|
| YUK LAM | 567 | 09/23/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| EVAN CHAN ARCHITECT, PC | 2 | 06/20/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 09/10/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| L2 CONSTRUCTION INC | 62 | 10/24/2024 |
| WASOFF PLBG & UTILITY CO | 41 | 08/26/2026 |
| NY BUILDING ASSOCIATES IN | 20 | 08/26/2026 |
| CATMAN PLUMBING INC | 19 | 09/15/2026 |
| S & L PLUMBING INC | 18 | 06/30/2026 |
| CLEAN TECH MECHANICAL INC | 15 | 08/26/2026 |
| ROCK E SMALL PLBG&HTG INC | 15 | 07/21/2026 |
| EAST 82ND ST REALTY LLC | 14 | 02/11/2025 |
| LXC CONSTRUCTION INC | 14 | 08/08/2026 |
| SHUN XING CAPITAL IMPT IN | 9 | 07/03/2026 |
| AMC PLBG, HTG & CLNG, INC | 8 | 05/24/2023 |
| CROSSFIELD P & H CORP | 8 | 09/11/2023 |
| NEW TEAM GROUP INC | 8 | 09/18/2023 |
| SO PLUMBING & HEATING INC | 7 | 09/21/2022 |
| TLS CONSTRUCTION GROUP I* | 7 | 05/29/2026 |
| HONOR CONSTRUCTION INC | 6 | 06/01/2026 |
| LIN AND SONS CORP | 6 | 03/29/2024 |
| RONG MAINTENANCE INC | 6 | 09/15/2026 |
| SKY ONE CONSTRUCTION, INC | 5 | 05/25/2025 |
| ST SAFETY CONS. INC | 5 | 05/01/2022 |
| D & R INTERIORS CORP | 4 | 09/17/2024 |
| EXCELLENT METROPOLITAN | 4 | 09/10/2026 |
| JC BROTHERS DEVELOPMENT | 4 | 10/16/2024 |
| SENID PL & HTG CORP | 4 | 10/23/2022 |
| TRI STATE PLBG & HTG INC | 4 | 05/23/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| EAST 82ND ST REALTY LLC | 22 | 08/26/2026 |
| GOOD RICH REALTY | 5 | 07/22/2023 |
| SKY ONE CONSTRUCTION INC | 5 | 07/05/2022 |
| Y CONSTRUCTION INC. | 5 | 12/15/2024 |
| CTI CONSTRUCTION INC | 4 | 09/17/2024 |
| YANG ZAU PROPERTY CORP. | 4 | 05/11/2022 |
| CHANG SONG INC | 3 | 08/15/2024 |
| DC ASTORIA INC | 3 | 07/02/2024 |
| E B H HOLDING INC | 3 | 09/10/2026 |
| SWIFTOP OF ASTORIA INC | 3 | 07/13/2026 |
| Yan Ming Inc | 3 | 03/09/2026 |
| 102-26 NICOLLS | 2 | 06/08/2022 |
| 228 UNITED REALTY LLC | 2 | 04/17/2024 |
| 500 W 148 LLC | 2 | 08/04/2021 |
| CHILL OUT! ICE CREAM AND CEREAL BAR | 2 | 10/30/2023 |
| CITY SKYLINE REALTY | 2 | 11/17/2020 |
| DC 7115 LLC | 2 | 09/21/2022 |
| DE CHENG 1 CONSTRUCTION I | 2 | 09/18/2023 |
| KAYAFAS CONTRACTING CO., INC. | 2 | 07/17/2023 |
| KL1005 LLC | 2 | 10/28/2020 |
| L2 Construction Inc | 2 | 06/02/2021 |
| MIRACLE CURTAINS 1 INC | 2 | 11/07/2023 |
| STONEEL LLC | 2 | 06/05/2024 |
| ZXNY21 LLC | 2 | 05/15/2026 |
| 1407 SECOND LLC | 1 | 12/19/2020 |
| Name | Jobs together | Most recent |
|---|---|---|
| CITY BUILDING NY ARCHITECT P.C. | 3 | 10/17/2024 |
| YE DEVELOPMENT INC. | 3 | 12/15/2024 |
| BMB BUILDING CONSULTING INC. | 1 | 06/20/2025 |
| EVAN CHAN ARCHITECT P.C. | 1 | 06/20/2025 |
| LIQUID DESIGN STUDIO & ASSOCIATES | 1 | 10/28/2025 |
| Rigid Structural Design, LLC | 1 | 09/10/2026 |