← Back
Elevator apt, semi-fireproof without stores
37 FEATHERBED LANE
BRONX · BIN 2008431
💬 Discuss this project
1929Year Built
6Stories
D1Building Class
R8AZoning
46,200 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized40 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: H & A MGMT LLC · 9,650 sf lot · 4.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction34p · 1 filing · 20 docs
Floor 6Under Construction47p · 1 filing · 20 docs
Floor 5Under Construction34p · 1 filing · 20 docs
Floor 4Under Construction34p · 1 filing · 20 docs
Floor 3Under Construction43p · 1 filing · 20 docs
Floor 2Under Construction42p · 1 filing · 20 docs
Floor 1Under Construction40p · 3 filings · 20 docs
BasementUnder Construction44p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORENCOGROUP2709/26/2026
SAFE-SHIELD ENTERPRISES604/09/2026
H & A MGMT LLC903/22/2026
IDF MGMT LLC1503/22/2026
ADF MGMT LLC103/22/2026
1DF MGMT LLC203/22/2026
FEATHERBED ASSOC LLC603/22/2026
37-39 FEATHERBED LLC103/22/2026
OWNER OF 35/39 FEATHERBED103/22/2026
KABALA MANAGEMENT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS2306/03/2026
KV LAMBIRIS ARCHITECT111/20/2024
ASHRAF CORP104/24/2024
HAIDER ENGINEERING, P.E.104/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA503/21/2026
FISCHER + MAKOOI ARCHITECTS2603/21/2026
DANICO SERVICES203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL PRO PLBG & HTG INCPlumbing609/26/2026
R&R CONTRACTING MGMT CORPGeneral Contractor606/28/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor404/09/2026
JOSEPH WEINSTEIN ELECTRICElectrical303/22/2026
INTELOGIC ELECTRIC, INC.Electrical103/22/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
JEONG YUNGElectrical103/21/2026
NY LANDMARKS GEN CONSTRUCGeneral Contractor107/08/2026
SAHI CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANAND J. SOLANKI, P.E.36621002/09/2026
SOLANKI ENGINEERING, P.C.84511002/09/2026
ENTHINK ENGINEERS LLC6247111/20/2024
PHILIP TOSCANO, ARCHITECT2474107/14/2021
Building Lifecycle
All (190)Filed (26)Permit Issued (14)Signed Off (5)Facade (FISP) (11)Violation (60)Inspection (18)Objection (26)Special Inspection (30)
09/25/2026
Permit issued — Plumbing
X00525233-S2-PL
09/02/2026
Violation issued (HPD, open)
A
09/02/2026
Violation issued (HPD, open)
C
09/02/2026
Violation issued (HPD, open)
B
09/02/2026
Violation issued (HPD, open)
B
08/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2026
Violation issued (HPD, open)
B
08/08/2026
Violation issued (HPD, open)
B
07/05/2026
Violation issued (HPD, closed)
C
07/05/2026
Violation issued (HPD, closed)
B
07/05/2026
Violation issued (HPD, closed)
C
07/05/2026
Violation issued (HPD, closed)
B
07/02/2026
Objection resolved — Resolved
06/12/2026
Objection raised — Other
06/03/2026
Filed — Alteration CO
PROPOSED APARTMENTS AT BASEMENT, FIRST & SECOND FLOOR. ADDITIONAL SCOPE OF WORK ADDED. AMENDMENT PLANS INCLUDE APARTMENT 1C, 1E, 1B, 2F & 2E TO BE SPLIT INTO STUDIO APARTMENTS. 80 SQ FT REDUCTION FROM APT. 6A.
X00525233-S2
06/02/2026
Filed — Alteration
Application filed for plumbing work at third and sixth floor for apts#3B, #3J, #6J, #6F, #6H & #6C for the following work: cap and removal of (3) gas ranges, relocation of res-sink, (4) new ADA bathrooms and (5) new ADA kitchenettes.
X01410597-I1
04/30/2026
Violation issued (HPD, closed)
A
04/29/2026
Signed off — Alteration
HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
X01040326-I1
04/09/2026
Signed off — Alteration CO
PROPOSED APARTMENTS AT BASEMENT, FIRST & SECOND FLOOR. ADDITIONAL SCOPE OF WORK ADDED. AMENDMENT PLANS INCLUDE APARTMENT 1C, 1E, 1B, 2F & 2E TO BE SPLIT INTO STUDIO APARTMENTS. 80 SQ FT REDUCTION FROM APT. 6A.
X00525233-S1
03/23/2026
Objection resolved — Resolved
03/16/2026
Violation issued (HPD, closed)
B
03/16/2026
Violation issued (HPD, closed)
B
03/16/2026
Violation issued (HPD, closed)
C
03/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Signed off — Alteration
X01136271-I1
02/19/2026
Cycle 9 facade inspection completed
02/18/2026
Violation issued (HPD, closed)
B
02/18/2026
Violation issued (HPD, open)
C
02/18/2026
Violation issued (HPD, closed)
B
02/18/2026
Objection raised — Admin
02/09/2026
Filed — Alteration CO
PROPOSED APARTMENTS AT BASEMENT, FIRST & SECOND FLOOR. ADDITIONAL SCOPE OF WORK ADDED. AMENDMENT PLANS INCLUDE APARTMENT 1C, 1E, 1B, 2F & 2E TO BE SPLIT INTO STUDIO APARTMENTS. 80 SQ FT REDUCTION FROM APT. 6A.
X00525233-A4
12/27/2025
Violation issued (HPD, closed)
A
12/27/2025
Violation issued (HPD, closed)
A
12/27/2025
Violation issued (HPD, closed)
C
12/08/2025
Cycle 9 facade report submitted
11/29/2025
Violation issued (HPD, closed)
B
11/26/2025
Special inspection requirement — Insulation placement and R values
Anand Solanki
11/26/2025
Special inspection requirement — Fenestration areas
Anand Solanki
11/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashray Solanki
11/26/2025
Special inspection requirement — Fenestration air leakage
Anand Solanki
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Anand Solanki
11/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Anand Solanki
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
11/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Anand Solanki
11/26/2025
Special inspection requirement — Interior lighting power
Anand Solanki
11/10/2025
Violation issued (HPD, open)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
C
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
B
10/01/2025
Violation issued (HPD, closed)
A
10/01/2025
Violation issued (HPD, closed)
C
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC09/25/2026
DOB NOWGeneral ConstructionPermit IssuedR&R CONTRACTING MGMT CORP09/10/2025
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN04/28/2025
DOB NOWGeneral ConstructionSigned-offSAHI CONSTRUCTION CORP02/05/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/18/2024
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC08/26/2024
DOB NOWGeneral ConstructionPermit IssuedR&R CONTRACTING MGMT CORP08/21/2024
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN04/25/2024
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC08/24/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/17/2023
DOB NOWGeneral ConstructionPermit IssuedR&R CONTRACTING MGMT CORP06/10/2023
DOB NOWGeneral ConstructionPermit IssuedR&R CONTRACTING MGMT CORP06/06/2022
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP08/16/2021
DOB NOWSidewalk ShedPermit IssuedNY LANDMARKS GEN CONSTRUC04/19/2019
BISOTISSUEDR&R CONTRACTING MGMT CORP04/27/2021
BISOTISSUEDNY LANDMARKS GEN CONSTRUC05/17/2019
BISFBISSUEDA&C COMBUSTION SERVICES CORP06/14/1993
1 project · most recent 05/20/2022
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/20/2022——Associated Ducts and Piping
Ducts & Piping
Brown QTXE110 110 CFM · Ductwork ×3
BQSEN130 250 CFM · Kitchen Exhaust ×2
1 project · most recent 10/14/2022
FiledStatusContractorScope
10/14/2022——15 heads
3 projects · most recent 06/03/2026
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
06/03/2026Permit IssuedALL PRO PLBG & HTG INCGas, Water/Sanitary
06/02/2026——Gas, Water/Sanitary
10/14/2022Signed-offALL PRO PLBG & HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
20 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/24/2026Permit IssuedJOSEPH WEINSTEIN ELECTRIC1 meters
02/11/2026CompleteINTELOGIC ELECTRIC, INC.General Wiring
07/02/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
07/02/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
07/02/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
06/27/2025Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/19/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/18/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/17/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/17/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/12/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/12/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/12/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
01/12/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/04/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
11/26/2025Fire-Resistant Penetrations and JointsAnand Solankispecial
11/26/2025Energy Code Compliance InspectionsAnand Solankiprogress
11/26/2025Fire-Resistance Rated ConstructionAnand Solankiprogress
11/26/2025Insulation placement and R valuesAnand Solankienergy_progress
11/26/2025Fenestration air leakageAnand Solankienergy_progress
11/26/2025Fenestration and door U-factor and product ratingsAnand Solankienergy_progress
11/26/2025Interior lighting powerAnand Solankienergy_progress
11/26/2025Fenestration areasAnand Solankienergy_progress
11/26/2025Structural Stability – Alterations of existing buildingsAshray Solankispecial
09/09/2025Tenant Protection Plan ComplianceAshray Solankispecial
09/09/2025Energy Code Compliance InspectionsAshray Solankiprogress
09/09/2025HVAC-R and service water piping design and insulationAshray Solankienergy_progress
09/09/2025Fire-Resistant Penetrations and JointsAshray Solankispecial
12/26/2024Fenestration and door U-factor and product ratingsAnand Solankienergy_progress
12/26/2024Fenestration air leakageAnand Solankienergy_progress
12/26/2024Fenestration areasAnand Solankienergy_progress
12/26/2024Interior lighting powerAnand Solankienergy_progress
12/26/2024Fire-Resistance Rated ConstructionAnand Solankiprogress
12/26/2024Energy Code Compliance InspectionsAnand Solankiprogress
12/26/2024Structural Stability – Alterations of existing buildingsAshray Solankispecial
12/26/2024Fire-Resistant Penetrations and JointsAnand Solankispecial
12/26/2024Insulation placement and R valuesAnand Solankienergy_progress
11/01/2024Tenant Protection Plan ComplianceSunil Saigalspecial
11/01/2024FinalSunil Saigalprogress
11/01/2024Structural Stability – Alterations of existing buildingsSunil Saigalspecial
Latest 25 of 63.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch24
08/25/2026X00487690-I1Request digital key ↗
08/23/2026X00552765-P1Request digital key ↗
08/23/2026X00552765-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00156076-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
03/08/2021240278338Open ↗
01/13/2021240278338Open ↗
08/21/2020240278338Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
04/27/2021240278338Open ↗
05/16/2019240253685Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026X00525233-I1Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00525233-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/25/2026X00487690-I1Open ↗
08/24/2026X00479654-I1Open ↗
08/23/2026X00552765-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/25/2026X00525233-P6Open ↗
09/25/2026X00525233-P6Open ↗
09/02/2026X00525233-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/25/2026X00525233-P6Open ↗
09/02/2026X00525233-P2Open ↗
09/02/2026X00525233-A4Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/21/2020240278338Open ↗
05/16/2019240253685Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/16/2019240253685Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/21/2020240278338Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/16/2019240253685Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
05/16/2019240253685Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/05/2021240278338Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/25/2026X00487690-I1Open ↗
08/23/2026X00552765-I1Open ↗
08/23/2026X00552765-P1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/21/2020240278338Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/22/2020240278338Open ↗
08/21/2020240278338Open ↗
05/16/2019240253685Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/21/2020240278338Open ↗
05/16/2019240253685Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/01/2023240278338Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/01/2023240278338Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/01/2023240278338Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/01/2023240278338Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/01/2023240278338Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00525233-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/14/2021240278338Open ↗
12/22/2020240278338Open ↗
08/21/2020240278338Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/01/2023240278338Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/01/2023240278338Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/01/2023240278338Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/01/2023240278338Open ↗
▸Approvals, Objections & Sign-offs4
▸BISFINAL3
12/05/2023240278338Open ↗
12/05/2023240278338Open ↗
12/05/2023240278338Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/07/2023240278338Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/22/2020240278338Open ↗
12/07/2020240278338Open ↗
05/16/2019240253685Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/05/2023240278338Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
08/21/2020240278338Open ↗
05/16/2019240253685Open ↗
▸Other Documents2
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00156076-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00525233-I1Open ↗