← Back
Church, synagogue, chapel
3702 GLENWOOD ROAD
BROOKLYN · East Flatbush-Farragut · BIN 3206195
💬 Discuss this project
1932Year Built
3Stories
M1Building Class
R4Zoning
37,760 sfGross Floor Area
2Units
LL97 Covered2 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · 21,520 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof5p · 3 filings · 16 docs
Floor 32p · 2 filings · 8 docs
Floor 2
Floor 11p · 1 filing · 4 docs
Mezzanine1p · 1 filing · 4 docs
CellarUnder Construction3p · 3 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET503/21/2026
ST VINCENT FERRER CHURCH103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC211/18/2025
GRANT ENGINEERING CONSULTANTS, LLC103/15/2021
NB&C209/09/2020
NELSON AND POPE205/04/2020
SYED ENGINEERING, P.C.209/17/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES303/21/2026
METROPOLIS GROUP INC403/21/2026
CONSOLIDATED SCAFFOLD BRIDGE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCPHEE&SON PL-HT-CL CORPPlumbing307/08/2026
WATERMARK PLUMBING CORPPlumbing303/22/2026
OVERLAND CONTRACTING INCGeneral Contractor307/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing207/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor207/08/2026
PARISH PROPERTY MANAGEMENTGeneral Contractor107/08/2026
JAY HELFGOTTElectrical103/21/2026
FALCO, CHRISTOPHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913111/18/2025
BURTNER ENGINEERING SERVI5910209/09/2020
C.M. TESTING LABORATORY,1352105/04/2020
Building Lifecycle
All (83)Filed (9)Permit Issued (11)Signed Off (5)Violation (22)Inspection (8)Objection (22)Special Inspection (6)
02/25/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/21/2026
Permit issued — Boiler Equipment
B01316482-I1-BE
01/09/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/09/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/18/2025
Filed — Alteration
Replacing existing gas fired boiler in the cellar with new as per plans filed herewith. NOTE: This filing supersedes filing B00822455-I1.
B01316482-I1
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
11/17/2025
Special inspection requirement — Maintenance information
Ronald Merhige
11/10/2025
Special inspection requirement — Heating Systems
Ronald Merhige
11/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Merhige
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Merhige
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
09/22/2025
Permit issued — Boiler Equipment
B00822455-I1-BE
12/16/2024
Violation issued (FDNY_ORDER, closed)
10/21/2024
Permit issued — Boiler Equipment
B00822455-I1-BE
04/25/2024
Permit issued — Boiler Equipment
B00822455-I1-BE
12/08/2023
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/21/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
11/17/2023
Violation issued (FDNY_NOV, closed)
08/01/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
05/25/2023
Violation issued (FDNY_NOV, closed)
05/24/2023
Permit issued — Boiler Equipment
B00822455-I1-BE
02/24/2023
Filed — Alteration
B00822455-I1
02/15/2023
Violation issued (FDNY_NOV, closed)
11/03/2022
Violation issued (FDNY_NOV, closed)
10/23/2022
Violation issued (FDNY_NOV, closed)
04/08/2022
Violation issued (FDNY_NOV, closed)
11/10/2021
Signed off — Alteration
B00344856-I1
11/10/2021
Signed off — Alteration
B00344858-I1
09/30/2021
Violation issued (FDNY_NOV, closed)
08/19/2021
Signed off — Alteration
Modification of existing AT&T site. Replace 6 antennas on the roof. Replace (3) RRH units on the roof. Install 3 RRH units on the roof. Retrofit rack in basement equipment room. . All in conformance with TPPN#5/98.No change is use, egress or occupancy.
B00480681-I1
06/03/2021
Signed off — Alteration
B00220638-I1
03/31/2021
Permit issued — Antenna
B00480681-I1-AN
03/17/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — 2014-AN AC 28-104.11-Building
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — 2014-AN AC 28-104.11-Building
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
03/17/2021
Objection resolved — Addressed
03/17/2021
Objection raised — 2014-AN AC 28-104.7-Building C
03/17/2021
Objection resolved — Addressed
03/15/2021
Filed — Alteration
Modification of existing AT&T site. Replace 6 antennas on the roof. Replace (3) RRH units on the roof. Install 3 RRH units on the roof. Retrofit rack in basement equipment room. . All in conformance with TPPN#5/98.No change is use, egress or occupancy.
B00480681-I1
02/24/2021
Violation issued (FDNY_ORDER, closed)
02/24/2021
Violation issued (FDNY_ORDER, closed)
01/12/2021
Permit issued — Mechanical Systems
B00344856-I1-MS
10/02/2020
Signed off — Alteration
B00225201-I1
09/24/2020
Objection resolved — Addressed
09/10/2020
Objection raised — 2014-AN AC 28-104.7.1-Administ
09/09/2020
Filed — Alteration
Requesting to amend previously approved application as per drawings filed within.
B00052747-P1
06/16/2020
Permit issued — Antenna
B00052747-I1-AN
05/04/2020
Filed — Alteration
B00344856-I1
05/04/2020
Filed — Alteration
B00344858-I1
01/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2019
Filed — Alteration
B00225201-I1
09/17/2019
Permit issued — Supported Scaffold
B00225201-I1-SF
09/05/2019
Filed — Alteration
B00220638-I1
09/05/2019
Permit issued — Sidewalk Shed
B00220638-I1-SH
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offBRATERLYN ENTERPRISES DBA01/21/2026
DOB NOWBoiler EquipmentPermit IssuedJ&M PLUMBING OF WESTCHEST09/22/2025
DOB NOWBoiler EquipmentPermit IssuedBRATERLYN ENTERPRISES DBA10/21/2024
DOB NOWBoiler EquipmentPermit IssuedLLOYD G DRUMMOND PLBG&GEN04/25/2024
DOB NOWBoiler EquipmentPermit IssuedLLOYD G DRUMMOND PLBG&GEN05/24/2023
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC03/31/2021
DOB NOWMechanical SystemsSigned-offPARISH PROPERTY MANAGEMEN01/12/2021
DOB NOWAntennaPermit IssuedOVERLAND CONTRACTING INC06/16/2020
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING09/17/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING09/05/2019
DOB NOWAntennaPermit IssuedOVERLAND CONTRACTING INC08/21/2018
BISOTISSUEDPARISH PROPERTY MANAGEMENT04/28/2020
BISOTISSUEDPARISH PROPERTY MANAGEMENT02/25/2020
BISOTISSUEDBECHTEL INFRASTRUCTURE AN07/01/2015
BISFBISSUEDBEORGE BASSOLINO10/03/2000
BISBLISSUEDGEORGE BASSOLINO INC09/12/2000
BISPLISSUEDBAY RIDGE MECHANICAL CORP.07/20/1992
BIS—ISSUEDMARINER INDUSTRIES07/20/1992
BISOTISSUEDMARINER INDUSTRIES05/05/1992
4 projects · most recent 01/26/2021
General Wiring
FiledStatusContractorScope
01/26/2021Permit IssuedC.FALCO ELETL CONT CORP2 meters, 2 new_meters
06/08/2020CompleteC.FALCO ELETL CONT CORPGeneral Wiring
09/29/2019CompleteBERGER QUALITY ELEC'L CON—
08/29/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/25/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/09/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/09/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/08/2023Fail-Final Boiler Equipment InspectionFailView ↗
11/21/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
08/01/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/17/2025Fire-Resistant Penetrations and JointsRonald Merhigespecial
11/17/2025Maintenance informationRonald Merhigeenergy_progress
11/10/2025Heating SystemsRonald Merhigespecial
11/10/2025HVAC-R and service water piping design and insulationRonald Merhigeenergy_progress
11/10/2025HVAC-R and service water heating system controlsRonald Merhigeenergy_progress
11/10/2025HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch4
08/27/2026B00822455-I1Request digital key ↗
08/19/2026B01316482-I1Request digital key ↗
08/15/2026B00052747-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Antenna2
08/15/2026B00052747-P1Request digital key ↗
08/15/2026B00052747-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00344858-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00220638-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00225201-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00344856-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
04/25/2020322016581Open ↗
02/28/2020321997327Open ↗
11/01/2019321997327Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
04/23/2020322016581Open ↗
10/09/2019321997327Open ↗
06/26/2015321128882Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00052747-I1Open ↗
09/02/2026B00052747-P1Open ↗
08/27/2026B00822455-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/23/2020322016581Open ↗
04/23/2020322016581Open ↗
10/31/2019321997327Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/23/2020322016581Open ↗
10/09/2019321997327Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/23/2020322016581Open ↗
10/09/2019321997327Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B01316482-I1Open ↗
08/28/2026B01316482-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01316482-I1Open ↗
08/28/2026B01316482-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026B00822455-I1Open ↗
08/19/2026B01316482-I1Open ↗
08/15/2026B00052747-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/26/2015321128882Open ↗
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS3
05/06/2021321997327Open ↗
12/22/2020322016581Open ↗
10/05/2015321128882Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/23/2020322016581Open ↗
10/05/2015321128882Open ↗
06/26/2015321128882Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/06/2021321997327Open ↗
12/22/2020322016581Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/18/2021321997327Open ↗
12/22/2020322016581Open ↗
10/05/2015321128882Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B01316482-I1Open ↗
08/13/2026B00344856-I1Open ↗
08/13/2026B00344858-I1Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
05/06/2021321997327Open ↗
12/22/2020322016581Open ↗
04/23/2020322016581Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
04/23/2020322016581Open ↗
10/09/2019321997327Open ↗
06/26/2015321128882Open ↗
▸BISBOROUGH INTAKE FORM1
04/25/2020322016581Open ↗