← Back
Over six families without stores
373 SOUTH 5 STREET
BROOKLYN · Williamsburg · BIN 3063501
💬 Discuss this project
1912Year Built
6Stories
C1Building Class
R6Zoning
24,543 sfGross Floor Area
30Units
Rent Stabilized59 Open Violations 53 unresolved · 6 paperwork only ▸FDNY Report ↗
Over six families without stores · 4,764 sf lot · 5.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 18p · 1 filing · 6 docs
Cellar14p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO LLC1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC408/15/2025
JIMENEZ BUILDING CONSULTING LLC202/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor707/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376408/15/2025
SD TESTING & INSPECTION S7010202/29/2024
Building Lifecycle
All (109)Filed (6)Permit Issued (5)Signed Off (5)Violation (60)Inspection (10)Objection (14)Special Inspection (9)
06/26/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, closed)
A
03/13/2026
Violation issued (HPD, closed)
B
03/13/2026
Violation issued (HPD, closed)
B
03/09/2026
Violation issued (HPD, closed)
B
03/06/2026
Violation issued (HPD, closed)
C
03/06/2026
Violation issued (HPD, closed)
B
03/06/2026
Violation issued (HPD, open)
C
11/24/2025
Violation issued (HPD, closed)
C
11/24/2025
Violation issued (HPD, closed)
C
11/24/2025
Violation issued (HPD, closed)
C
09/23/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR & 1ST FLOOR. (APARTMENT #1D) .CEILING, FLOORING, PARTITION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
B01219582-I1
09/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/19/2025
Violation issued (HPD, closed)
C
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
A
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
C
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
B
09/19/2025
Violation issued (HPD, closed)
B
09/18/2025
Violation issued (HPD, closed)
C
09/18/2025
Violation issued (HPD, closed)
B
09/18/2025
Violation issued (HPD, closed)
C
09/05/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
08/15/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR & 1ST FLOOR. (APARTMENT #1D) .CEILING, FLOORING, PARTITION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
B01219582-P1
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
06/30/2025
Signed off — Alteration
CAP & REMOVE PLUMBING AND GAS FIXTURES AND PIPING ON CELLAR TO RESOLVE DOB VIOLATION:39104601P & 39104600N & VACATE ORDER #: 3945359. GENERAL CONSTRUCTION WORK IN CONJUNCTION WITH JOB #: B01142665-I1NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY..
B01142665-S1
06/30/2025
Signed off — Alteration
CAP & REMOVE PLUMBING AND GAS FIXTURES AND PIPING ON CELLAR TO RESOLVE DOB VIOLATION:39104601P & 39104600N & VACATE ORDER #: 3945359. GENERAL CONSTRUCTION WORK IN CONJUNCTION WITH JOB #: B01142665-I1NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY..
B01142665-I1
06/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Permit issued — General Construction
B01219582-I1-GC
05/22/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Cost
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/06/2025
Objection resolved — Addressed
05/05/2025
Objection raised — Admin
05/05/2025
Objection raised — Admin
05/05/2025
Objection raised — Admin
05/01/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR & 1ST FLOOR. (APARTMENT #1D) .CEILING, FLOORING, PARTITION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
B01219582-I1
04/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/17/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/29/2025
Violation issued (HPD, closed)
C
03/29/2025
Violation issued (HPD, closed)
B
03/29/2025
Violation issued (HPD, closed)
B
03/28/2025
Permit issued — Plumbing
B01142665-S1-PL
03/20/2025
Objection raised — Admin
03/20/2025
Objection resolved — Addressed
03/13/2025
Filed — Alteration
CAP & REMOVE PLUMBING AND GAS FIXTURES AND PIPING ON CELLAR TO RESOLVE DOB VIOLATION:39104601P & 39104600N & VACATE ORDER #: 3945359. GENERAL CONSTRUCTION WORK IN CONJUNCTION WITH JOB #: B01142665-I1NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY..
B01142665-S1
03/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC06/10/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS03/28/2025
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC12/04/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/02/2024
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC04/18/2024
BISBLISSUEDCROSSFIELD PLBG.&HTG10/25/2019
BISOTISSUEDWINWAY DEVELOPMENT LLC12/18/2018
BISPLISSUEDRRP PLUMBING CORP08/11/2017
BISBLISSUEDRRP PLUMBING CORP08/11/2017
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/05/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/17/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/20/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
08/22/2025Fire-Resistant Penetrations and JointsJian Yangspecial
08/22/2025Tenant Protection Plan ComplianceJian Yangspecial
08/14/2025Tenant Protection Plan ComplianceJian Yangspecial
08/14/2025Fire-Resistant Penetrations and JointsJian Yangspecial
03/13/2025Fire-Resistant Penetrations and JointsJian Yangspecial
03/13/2025Tenant Protection Plan ComplianceJian Yangspecial
02/28/2024Tenant Protection Plan ComplianceXIUCHENG LIspecial
02/28/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
02/28/2024Energy Code Compliance InspectionsXIUCHENG LIprogress
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B01006469-S1Request digital key ↗
08/25/2026B01006469-I1Request digital key ↗
08/22/2026B01142665-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits19
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION9
01/03/2020321559470Open ↗
12/02/2019321559470Open ↗
12/02/2019321559470Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
01/21/2020321559470Open ↗
12/06/2019321559470Open ↗
11/15/2019321559470Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
10/25/2019321559470Open ↗
08/02/2019321559470Open ↗
08/11/2017321559470Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B01006469-I1Open ↗
08/25/2026B01006469-S1Open ↗
08/21/2026B01219582-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B01006469-S1Open ↗
08/26/2026B01142665-S1Open ↗
08/23/2026B01219582-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/27/2019322064500Open ↗
02/27/2019322064500Open ↗
08/11/2017321559470Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/19/2018322064500Open ↗
08/11/2017321559470Open ↗
▸BISProfessional and Owner Certification (POC3)1
08/11/2017321559470Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/19/2018322064500Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01006469-S1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
12/06/2019321559470Open ↗
11/15/2019321559470Open ↗
08/11/2017321559470Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/17/2017321559470Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
12/19/2018322064500Open ↗
08/11/2017321559470Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026B01006469-I1Open ↗
08/25/2026B01006469-S1Open ↗
08/13/2026B01142665-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/11/2017321559470Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/27/2019322064500Open ↗
02/27/2019322064500Open ↗
12/19/2018322064500Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
09/17/2020321559470Open ↗
02/27/2019322064500Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/29/2020321559470Open ↗
09/29/2020321559470Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/29/2020321559470Open ↗
09/29/2020321559470Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/28/2019322064500Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/19/2018322064500Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/29/2020321559470Open ↗
06/28/2019322064500Open ↗
02/27/2019322064500Open ↗
▸BISSUPERSEDING LETTER2
08/02/2019321559470Open ↗
08/02/2019321559470Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
09/17/2020321559470Open ↗
02/27/2019322064500Open ↗
02/27/2019322064500Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
01/17/2020321559470Open ↗
12/06/2019321559470Open ↗
11/15/2019321559470Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
06/28/2019322064500Open ↗
02/27/2019322064500Open ↗
▸BISEFILING COVER SHEET2
12/19/2018322064500Open ↗
08/11/2017321559470Open ↗