| Owner | Filings | Most Recent |
|---|---|---|
| HINES | 213 | 09/13/2026 |
| NEW REMAINDERMAN 375 HUDSON LLC | 6 | 03/22/2026 |
| REMAINDERMAN 375 HUDSON L | 2 | 03/22/2026 |
| 375 HUD PARKING LLC | 1 | 03/22/2026 |
| 375 HUDSON LLC | 2 | 03/22/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| TST 375 HUDSON | 325 | 03/22/2026 |
| TISHMAN SPEYER PROPERTIES L P | 105 | 03/21/2026 |
| SASSOUNI REALTY | 1 | 03/21/2026 |
| TISHMAN SPEYER PROPERTY MANAGEME | 12 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| COSENTINI ASSOCIATES | 7 | 08/05/2026 |
| GENSLER | 6 | 07/13/2026 |
| CRUICKSHANKS ENGINEERING & CONSULTI | 1 | 06/01/2026 |
| ROBERT DERECTOR ASSOCIATES | 85 | 05/05/2026 |
| RAND ENGINEERING & ARCHITECTURE, DP | 1 | 05/01/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 04/30/2026 |
| RANDALL P. COLLINS ARCHITECT, PC | 6 | 04/10/2026 |
| TPG ARCHITECTURE, LLP | 12 | 03/25/2026 |
| MANCINI DUFFY ARCHITECTURE | 2 | 01/13/2026 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 4 | 05/14/2025 |
| INCA ARCHITECTURE PLLC | 1 | 11/20/2024 |
| BR DESIGN ASSOCIATES LLC | 1 | 10/16/2024 |
| VOCON | 1 | 07/15/2024 |
| GOLDMAN COPELAND ASSOCIATES | 3 | 06/27/2024 |
| AKF ENGINEERS, LLP | 11 | 04/29/2024 |
| ARCHITECTURE PLUS INFORMATION | 1 | 07/24/2023 |
| WSP | 2 | 07/20/2023 |
| ALTAGRACIA ESTHER MARTINEZ, R.A. | 1 | 06/24/2021 |
| THORNTON TOMASETTI | 2 | 04/26/2021 |
| JAROS BAUM & BOLLES | 2 | 02/12/2021 |
| FOGARTY FINGER ARCHITECTURE PLLC | 1 | 02/12/2021 |
| PATTI & ANTHES CONSULTING ENGINEERS | 1 | 02/12/2021 |
| NEWTEC ENGINEERING | 1 | 01/14/2021 |
| WALTER T. GORMAN, P.E., P.C. | 1 | 01/09/2020 |
| IKRA CONSULTING LLC | 1 | 09/05/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 117 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 10 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 4 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| SMEP DESIGN & CONSULTATION LLC | 2 | 03/21/2026 |
| WALTER T. GORMAN, PE, PC | 1 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| AK CONSULTING SERVICES | 2 | 03/21/2026 |
| WALTER T GORMAN P E P C | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT MAGEN & COMPANY INC | General Contractor | 42 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 13 | 07/08/2026 |
| ASHLAND PLUMBING CORP | Plumbing | 12 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 11 | 08/16/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 9 | 07/08/2026 |
| MASDAC LLC | General Contractor | 9 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 7 | 07/08/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 6 | 07/08/2026 |
| SOHO CONTRACTING CORP | General Contractor | 5 | 07/08/2026 |
| M & S BUILDINGS SERVICES | Fire Protection | 5 | 07/08/2026 |
| BP MECHANICAL CORP | General Contractor | 4 | 03/21/2026 |
| W & M SPRINKLER - NYC LLC | Fire Protection | 4 | 07/08/2026 |
| CAMPBELL & DAWES LTD ELEC | Electrical | 4 | 03/22/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 4 | 07/08/2026 |
| DIAMOND TSAI | Electrical | 3 | 03/21/2026 |
| DNP BUILDERS LLC | General Contractor | 3 | 07/08/2026 |
| ROBERT B. SAMUELS, INC. | Electrical | 3 | 03/22/2026 |
| RENNON CONSTRUCTION CORP | General Contractor | 2 | 03/21/2026 |
| CARLITOS CONTRACTING CORP | General Contractor | 2 | 08/26/2026 |
| MASS CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 2 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| PLUMBING WORKS CORP | Fire Protection | 2 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 2 | 03/21/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SAG ENGINEERING & CONSULT | 608 | 19 | 08/05/2026 |
| CODEGREEN | 510 | 50 | 05/05/2026 |
| CROSSCHECK INSPECTION SER | 544 | 8 | 10/07/2025 |
| SPECIAL INSPECTION SERVIC | 1200 | 23 | 06/08/2022 |
| MILROSE CONSULTANTS LLC | 2003 | 7 | 05/16/2022 |
| CONSULTING AND TESTING SE | 6152 | 10 | 11/04/2021 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 1 | 02/12/2021 |
| GOLDMAN COPELAND ASSOCIAT | 2826 | 2 | 02/08/2021 |
| OBAID MIAN | 849 | 1 | 01/14/2021 |
| WALTER T. GORMAN, P.E., P | 268 | 2 | 01/09/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/14/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/14/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/14/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CARLITOS CONTRACTING CORP | 07/30/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | STRUCTUAL PRESV SYSTEM | 06/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | DENKO MECHANICAL INC | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION CORP | 06/17/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CENTRAL CONSTRUCTION MGMT | 06/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/28/2026 |
| DOB NOW | General Construction | Permit Issued | YATES EXTERIOR RESTORATION | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 05/12/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CARLITOS CONTRACTING CORP | 04/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI PARTNERS, LLC | 04/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ICON INTERIORS INC | 04/16/2026 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 04/16/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 04/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | BLUEWATER P&H, INC | 04/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | M & S BUILDINGS SERVICES | 03/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CENTRAL CONSTRUCTION MGMT | 02/27/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 01/29/2026 |
| DOB NOW | Plumbing | Permit Issued | BLUEWATER PLBG& HTG INC | 01/14/2026 |
| DOB NOW | Mechanical Systems | Signed-off | PRESTIGIOUS MAINTENANCE I | 01/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 12/30/2025 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 12/30/2025 |
| DOB NOW | Sprinklers | Permit Issued | BLUEWATER PLBG& HTG INC | 12/24/2025 |
| DOB NOW | Sprinklers | Permit Issued | BLUEWATER P&H, INC | 12/23/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BORO ASSOCIATES INC | 09/05/2025 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/26/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/26/2025 |
| DOB NOW | Structural | Signed-off | DNP BUILDERS LLC | 08/21/2025 |
| DOB NOW | Plumbing | Permit Issued | CITY/SUBURBAN PLBG CORP | 06/09/2025 |
| DOB NOW | Plumbing | Permit Issued | CITY/SUBURBAN PLBG CORP | 06/09/2025 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/29/2025 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 05/27/2025 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION COR | 05/20/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TRI-STAR CONSTRUCTION COR | 05/20/2025 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION COR | 05/20/2025 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION COR | 05/20/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/05/2026 | Permit Issued | CLUNE CONSTRUCTION CO LP | Air Conditioning Systems | Cooling Bosch CL036-3HZC-LRSAUA-XFGMXXXXB1MXXX1XXXXSBA 1,200 CFM · Wshp ×2 CL060-3HZC-ARSAUA-XFGLMXXXB1MXEX1XXXXSBA 1,900 CFM · Wshp ×2 |
| 05/05/2026 | — | — | Air Conditioning Systems | Cooling Vertiv VS070KD 249,000 BTU · Crac Unit ×1 |
| 08/25/2025 | Permit Issued | CLUNE CONSTRUCTION CO LP | Air Conditioning Systems | Cooling |
| 05/14/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Air Conditioning Systems | Cooling Above Air MCW-012S 55,500 BTU · Wshp ×1 |
| 05/14/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Air Conditioning Systems | Cooling Mitsubishi Electric TQHYP0724AL41AN 72,000 BTU · Wshp ×1 TQHYP1204AL41AN 120,000 BTU · Wshp ×1 TQHYP1444AL41AN 144,000 BTU · Vrf Outdoor ×1 Florida Heat Pump QV036 36,800 BTU · Wshp ×1 |
| 04/29/2024 | Signed-off | P.J. MECHANICAL CORP | Air Conditioning Systems | Cooling Trane Modular Self Contained (MSC)-Custom 874,000 BTU ×1 |
| 11/10/2023 | Permit Issued | ICON INTERIORS INC | Air Conditioning Systems | Cooling Florida Heat Pump QV036 38,400 BTU · Wshp ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/02/2026 | — | — | 9 heads |
| 04/09/2026 | Permit Issued | PSI PARTNERS, LLC | — |
| 05/14/2025 | Permit Issued | FULL CAPACITY FIRE CORP | 463 heads |
| 06/27/2024 | Permit Issued | DENKO MECHANICAL INC | 73 heads |
| 07/20/2023 | Signed-off | SIRINA FIRE PROT CORP | — |
| 08/16/2022 | — | — | 7 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/05/2026 | Permit Issued | BLUEWATER PLBG& HTG INC | Water/Sanitary |
| 05/02/2026 | — | — | Water/Sanitary |
| 04/09/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 05/14/2025 | Permit Issued | CITY/SUBURBAN PLBG CORP | Water/Sanitary |
| 05/14/2025 | Permit Issued | CITY/SUBURBAN PLBG CORP | Water/Sanitary |
| 08/16/2022 | — | — | Water/Sanitary |
| 08/10/2022 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/18/2026 | Complete | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 08/31/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | 1 meters |
| 03/24/2026 | Permit Issued | SPICE ELECTRIC COMPANY | — |
| 12/09/2025 | Permit Issued | ALLSTATE ELEC'L CONT INC | General Wiring |
| 10/24/2025 | Complete | METHOD ELECTRIC LLC | General Wiring |
| 10/21/2025 | Cancelled | METHOD ELECTRIC LLC | General Wiring |
| 10/08/2025 | Complete | SNB ELECTRICAL CONTNG COR | General Wiring |
| 09/08/2025 | Complete | ATLAS-ACON ELEC. SERVICE | 1 meters |
| 05/27/2025 | Permit Issued | MATROS AUTOMATED ELEC'L C | General Wiring |
| 04/23/2025 | Complete | M.C. ELECTRICAL NY INC | General Wiring |
| 01/27/2025 | Complete | ASCUATECH ELECTRICAL CORP | General Wiring |
| 11/13/2024 | Complete | MER ELECTRIC, INC | General Wiring |
| 07/30/2024 | Cancelled | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 01/31/2024 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 08/29/2023 | Complete | ROBERT B. SAMUELS, INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/14/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Steel |
| 05/14/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Steel, Masonry |
| 07/20/2023 | Signed-off | JT MAGEN & COMPANY INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | CARLITOS CONTRACTING CORP | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | Permit Issued | CENTRAL CONSTRUCTION MGMT | Suspended Scaffold (SC) |
| 02/25/2026 | Permit Issued | CENTRAL CONSTRUCTION MGMT | — |
| 03/26/2025 | Signed-off | STRUCTUAL PRESV SYSTEM | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/04/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 08/06/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/03/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 05/18/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/26/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 03/26/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/19/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/17/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/19/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/18/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/11/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/08/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/18/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 04/17/2025 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 02/10/2025 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 01/14/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/12/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/06/2026 | Duct leakage testing, insulation and design | Chester Kowalski | energy_progress |
| 08/06/2026 | HVAC-R and service water heating equipment | Chester Kowalski | energy_progress |
| 08/06/2026 | Mechanical Systems | Chester Kowalski | special |
| 08/06/2026 | Interior lighting power | Chester Kowalski | energy_progress |
| 08/06/2026 | Energy Code Compliance Inspections | Chester Kowalski | progress |
| 08/06/2026 | Maintenance information | Chester Kowalski | energy_progress |
| 08/06/2026 | HVAC-R and service water piping design and insulation | Chester Kowalski | energy_progress |
| 08/06/2026 | HVAC-R and service water heating system controls | Chester Kowalski | energy_progress |
| 08/06/2026 | Final | Chester Kowalski | progress |
| 08/06/2026 | Lighting controls | Chester Kowalski | energy_progress |
| 06/22/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 06/22/2026 | Sprayed fire-resistant materials | Chester Kowalski | special |
| 06/22/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Chester Kowalski | special |
| 06/22/2026 | Final | Karen Solomon | progress |
| 06/01/2026 | Alternative Materials - OTCR Buildings Bulletin Number | JONATHAN CRUICKSHANKS | special |
| 05/01/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 05/01/2026 | Energy Code Compliance Inspections | James Sullivan Jr | progress |
| 05/01/2026 | Maintenance information | James Sullivan Jr | energy_progress |
| 05/01/2026 | HVAC-R and service water heating equipment | James Sullivan Jr | energy_progress |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 05/01/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 05/01/2026 | Duct leakage testing, insulation and design | James Sullivan Jr | energy_progress |
| 05/01/2026 | HVAC-R and service water heating system controls | James Sullivan Jr | energy_progress |
| 04/09/2026 | Lighting controls | James Sullivan Jr | energy_progress |
| 04/09/2026 | HVAC-R and service water piping design and insulation | James Sullivan Jr | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Publicis Groupe | Office | Floors 2, 3, 5, 10, 15, 16 | Project M01253901 Project M01345171 Project M01333277 Project M01256019 Project M01256171 Project M01256236 Project M01253801 Project M01253855 Project M01253877 Project M00881430 Project M00761806 Project M00244824 |