| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01315316 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/25/2026 | 08/31/2026 | Design DESIGN REPUBLIC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | INTERIOR RENOVATION WORK ON THE FOURTH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01408137 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 06/29/2026 | 08/28/2026 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | MODIFICATION OF SPRINKLERS ON THE 16TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01398001 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/07/2026 | 08/12/2026 | Design DESIGN REPUBLIC Owner NBCUNIVERSAL Filer DOMANI CONSULTING | GENERAL CONSTRUCTION WORK ON THE CELLAR LEVEL. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01403150 ↗ | 1672 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/30/2026 | Design MEYERS+ ENGINEERS Filer JAM CONSULTANTS, INC. | Interior build-out of office space as per plans herewith. No change to use, egress, or occupancy. |
| M01413119 | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 07/28/2026 | Design TED MOUDIS ASSOCIATES Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | INTERIOR DEMOLITION WORK ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01413125 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 07/28/2026 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | REMOVAL OF HVAC EQUIPMENT, INCLUDING DUCTS AND DIFFUSERS ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 17 | 06/24/2026 |
| VOCON | 15 | 06/24/2026 |
| AMA CONSULTING ENGINEERS, PC | 10 | 04/01/2026 |
| ASDA ARCHITECTURE + DESIGN | 6 | 05/06/2026 |
| CFS ENGINEERING, DPC | 5 | 07/23/2026 |
| ACTIVE DESIGN GROUP ENGINEERING | 4 | 04/29/2024 |
| DESIGN REPUBLIC | 4 | 08/25/2026 |
| GOLDMAN COPELAND ASSOC. | 4 | 01/26/2024 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 4 | 04/01/2026 |
| NICOLAS BARATTO ARCHITECT P.C. | 4 | 10/21/2024 |
| PATTI & ANTHES CONSULTING ENGINEERS | 4 | 06/08/2022 |
| AKF ENGINEERS, LLP | 3 | 08/29/2025 |
| GOLDMAN COPELAND ASSOCIATES | 3 | 05/06/2026 |
| GRUMMAN BUTKUS ASSOCIATES | 3 | 06/19/2024 |
| KAHN ARCHITECTURE & DESIGN PC | 3 | 03/03/2022 |
| LORING CONSULTING ENGINEERS, INC. | 3 | 02/16/2023 |
| TED MOUDIS ASSOCIATES | 3 | 07/23/2026 |
| WARE MALCOMB | 3 | 06/29/2026 |
| BONSIGNORE ARCHITECTS | 2 | 03/17/2022 |
| COOPER ROBERTSON | 2 | 12/08/2022 |
| CORGAN | 2 | 12/10/2024 |
| HIGHLAND ASSOCIATES | 2 | 02/19/2026 |
| MMOSER ASSOCIATES | 2 | 04/21/2026 |
| THE SWITZER GROUP | 2 | 04/24/2023 |
| THORNTON TOMASETTI | 2 | 05/05/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| A&A PLUMBING CORP | 4 | 10/21/2024 |
| ABCO PEERLESS SPRINKLER C | 4 | 06/29/2026 |
| GEOFFREY A. LAGAS & ASSOC | 3 | 06/29/2026 |
| DEPENDABLE MECH CORP | 2 | 06/29/2026 |
| A & S CONTRACTORS OF NY I | 1 | 03/20/2023 |
| BEDROCK PLBG. & HTG., INC | 1 | 06/18/2024 |
| BENCHMARK BUILDERS LLC | 1 | 01/06/2023 |
| DEPENDABLE MECHANICAL COR | 1 | 06/29/2026 |
| PATRIOT FIRE SUPPRESSION, | 1 | 10/30/2019 |
| PSI PARTNERS, LLC | 1 | 06/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| NBCUNIVERSAL | 20 | 08/25/2026 |
| TISHMAN SPEYER | 15 | 10/26/2022 |
| HINES INTEREST LP | 9 | 06/24/2026 |
| TRINITY HUDSON HOLDINGS | 9 | 02/27/2026 |
| BOSTON PROPERTIES | 7 | 04/01/2026 |
| VORNADO REALTY TRUST | 6 | 05/06/2026 |
| NEW YORK UNIVERSITY | 5 | 10/21/2024 |
| CBRE | 4 | 10/23/2023 |
| HINES | 4 | 05/05/2026 |
| THE MUSEUM OF MODERN ART (MOMA) | 4 | 06/19/2024 |
| 340 Madison Owner LLC | 3 | 02/19/2026 |
| Rockefeller Group | 3 | 08/20/2025 |
| NYC ECONOMIC DEVELOPMENT CORP | 2 | 02/06/2020 |
| 300 PARK AVENUE | 1 | 06/08/2022 |
| BXP | 1 | 03/31/2025 |
| COLUMBIA PROPERTY TRUST | 1 | 02/07/2024 |
| COLUMBIA REIT - 229 WEST 43RD STREE | 1 | 10/18/2021 |
| CUSHMAN & WAKEFIELD | 1 | 09/09/2019 |
| EMMES REALTY ASSOCIATES. AGENT | 1 | 06/29/2026 |
| 1 | 12/22/2025 | |
| HUDSON SQUARE REALTY, LLC | 1 | 05/03/2022 |
| RXR SL OWNER LLC | 1 | 10/23/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 20 | 02/19/2026 |
| CORNERSTONE CONSULTING | 17 | 06/24/2026 |
| GILLMAN CONSULTING INC | 12 | 04/01/2026 |
| ARCHETYPE CONSULTANTS, INC. | 10 | 05/06/2026 |
| WALTER T. GORMAN, PE, PC | 10 | 10/26/2022 |
| A1 EXPEDITING SERVICE CORP. | 8 | 12/22/2025 |
| DOMANI CONSULTING | 7 | 08/07/2026 |
| YAO W GUO ARCHITECT, PC | 4 | 10/21/2024 |
| JAM CONSULTANTS, INC. | 3 | 06/29/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 08/17/2021 |
| ROYAL T&E LLC | 1 | 03/20/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01315316 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/25/2026 | 08/31/2026 | Design DESIGN REPUBLIC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | INTERIOR RENOVATION WORK ON THE FOURTH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01408137 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 06/29/2026 | 08/28/2026 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | MODIFICATION OF SPRINKLERS ON THE 16TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01398001 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/07/2026 | 08/12/2026 | Design DESIGN REPUBLIC Owner NBCUNIVERSAL Filer DOMANI CONSULTING | GENERAL CONSTRUCTION WORK ON THE CELLAR LEVEL. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01403150 ↗ | 1672 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/30/2026 | Design MEYERS+ ENGINEERS Filer JAM CONSULTANTS, INC. | Interior build-out of office space as per plans herewith. No change to use, egress, or occupancy. |
| M01413119 | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 07/28/2026 | Design TED MOUDIS ASSOCIATES Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | INTERIOR DEMOLITION WORK ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01413125 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 07/28/2026 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | REMOVAL OF HVAC EQUIPMENT, INCLUDING DUCTS AND DIFFUSERS ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01364755 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 07/15/2026 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | INSTALLATION OF SPRINKLERS ON THE 15TH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| M01410586 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Permit Issued | 06/24/2026 | 07/02/2026 | Design ROBERT DERECTOR ASSOCIATES Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | minor mechanical work as per plans |
| M01410575 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Permit Issued | 06/24/2026 | 06/25/2026 | Design VOCON Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | WHITEBOX MODIFICATIONS TO EXISTIONG OFFICE SPACE AS PER PLANS |
| M01364559 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 06/04/2026 | 06/17/2026 | Design TED MOUDIS ASSOCIATES Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | GENERAL CONSTRUCTION WORK ON THE 15TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01344395 ↗ | 561 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 01/29/2026 | 05/18/2026 | Design THORNTON TOMASETTI Owner HINES Filer CORNERSTONE CONSULTING | BACK OF HOUSE STAIR ALTERATIONS AS PER PLANS |
| M01344123 ↗ | 561 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 01/27/2026 | 04/09/2026 | Design ROBERT DERECTOR ASSOCIATES Owner HINES Filer CORNERSTONE CONSULTING | MINOR MECHANCIAL WORK AS PER PLANS |
| M01366234 ↗ | 510 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/01/2026 | 04/07/2026 | Design AMA CONSULTING ENGINEERS, PC Owner BOSTON PROPERTIES Filer GILLMAN CONSULTING INC | Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy. |
| M01348873 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 04/01/2026 | 04/06/2026 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Mechanical work on the 10th floor (LB Pharma expansion) as indicated on drawings. |
| M01344107 ↗ | 561 GREENWICH STREET MANHATTAN | Alteration | Permit Issued | 01/27/2026 | 04/01/2026 | Design VOCON Owner HINES Filer CORNERSTONE CONSULTING | INTERIOR BASE BUILDING IMPROVEMENTS TO INSTALL NEW CONNECTING CONVENIENCE STAIR IN RETAIL SPACE INCLUDING REMOVAL WORK, CONSTRUCTION OF NEW… |
| M01352938 ↗ | 340 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/18/2026 | 03/23/2026 | Design HIGHLAND ASSOCIATES Owner 340 Madison Owner LLC Filer RIZZO GROUP | Plumbing modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress oroccupancy |
| M01348828 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 03/09/2026 | Design ASDA ARCHITECTURE + DESIGN Owner VORNADO REALTY TRUST | Construction work on the 10th floor (LB Pharma expansion) as indicated on drawings. |
| M01334639 ↗ | 111 8 AVENUE MANHATTAN | Alteration | Signed-off | 12/22/2025 | 01/06/2026 | Design ROBERT DERECTOR ASSOCIATES Owner GOOGLE | Providing new CHWS/R and condensate piping to new walk-in coolers. Relocating existing fan coil unit. No change in use, egress, or occupancy… |
| M01281783 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/08/2025 | 12/15/2025 | Design ASDA ARCHITECTURE + DESIGN Owner VORNADO REALTY TRUST | Construction work on the 53rd floor (restrooms) as indicated on drawings. |
| M01281524 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 11/03/2025 | 12/11/2025 | Design ASDA ARCHITECTURE + DESIGN Owner VORNADO REALTY TRUST | Construction work on the 53rd floor (corridor) as indicated on drawings. |
| M01281545 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/09/2025 | 12/11/2025 | Design GOLDMAN COPELAND ASSOCIATES Owner VORNADO REALTY TRUST | Mechanical work on the 53rd floor (corridor) as indicated on drawings. |
| M01281790 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 12/09/2025 | 12/11/2025 | Design GOLDMAN COPELAND ASSOCIATES | Mechanical work on the 53rd floor (restrooms) as indicated on drawings. |
| M01278594 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/24/2025 | 12/01/2025 | Design MMOSER ASSOCIATES Owner NBCUNIVERSAL Filer DOMANI CONSULTING | INTERIOR RENOVATION WORK ON THE SECOND FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01315296 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/24/2025 | 11/28/2025 | Design MMOSER ASSOCIATES Owner NBCUNIVERSAL Filer DOMANI CONSULTING | INTERIOR DEMOLITION WORK ON THE FOURTH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01278637 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/21/2025 | 11/25/2025 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer MASS CONTRACTING CORP | HVAC INSTALLATION AND MODIFICATION WORK ON THE SECOND AND THIRD FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01278416 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 11/24/2025 | — | Mechanical work on the 53rd floor (Orion) as indicated on drawings. |
| M01315697 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/21/2025 | 11/24/2025 | Design CFS ENGINEERING, DPC Owner NBCUNIVERSAL Filer DOMANI CONSULTING | REMOVAL OF HVAC EQUIPMENT, INCLUDING DUCTS AND DIFFUSERS ON THE FOURTH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01278344 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 11/13/2025 | 11/14/2025 | Design VOCON Owner VORNADO REALTY TRUST | Construction work on the 53rd floor (Orion) as indicated on drawings. |
| M01306482 ↗ | 340 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 11/04/2025 | 11/12/2025 | Design WARE MALCOMB Owner 340 Madison Owner LLC Filer RIZZO GROUP | General construction modifications taking place on the 9, 19, 20th floors as per plans filed herewith. No change in use, egress or occupancy |
| M01306486 ↗ | 340 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2025 | 11/12/2025 | Design HIGHLAND ASSOCIATES Owner 340 Madison Owner LLC Filer RIZZO GROUP | Mechanical modifications taking place on the 9,19,20th floors as per plans filed herewith. No change in use, egress or occupancy |
| M01291721 ↗ | 155 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 10/14/2025 | 10/17/2025 | Design ROBERT DERECTOR ASSOCIATES Owner TRINITY HUDSON HOLDINGS Filer CORNERSTONE CONSULTING | MECHANICAL WORK AND INSTALLATION OF 3 AC UNITS AS PER PLANS |
| M01291708 ↗ | 155 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 10/14/2025 | 10/16/2025 | Design VOCON | INTERIOR BUILD OUT OF NON LOAD BEARING PARTITIONS AS PER PLANS. |
| M01254341 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/20/2025 | 08/27/2025 | Design MDEAS ARCHITECTS Owner ROCKEFELLER GROUP, INC. Filer RIZZO GROUP | Minor demo of interior finishes. Build new wall to split existing retail space into two and white box space, replacement of existing retail … |
| M01254361 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/15/2025 | 08/20/2025 | Design AMA CONSULTING ENGINEERS, PC Owner ROCKEFELLER GROUP, INC. Filer RIZZO GROUP | Modifications to the existing HVAC System: Remove existing HVAC system components and creation of provisions for connections by future retai… |
| M01256042 ↗ | 1221 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 08/18/2025 | 08/20/2025 | Design GILSANZ MURRAY STEFICEK LLP Owner ROCKEFELLER GROUP, INC. Filer RIZZO GROUP | Structural Modifications: Slab infill, curb and CMU lintel details in the ground floor as per plans (South Retail Entrances.) No change to u… |
| M00886555 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 07/08/2025 | 07/11/2025 | — | Construction work on the 25th floor (restrooms ) as indicated on drawings |
| M00886707 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 07/07/2025 | 07/08/2025 | — | Mechanical work on the 25th floor (restrooms) as indicated on drawings |
| M01207568 ↗ | 205 HUDSON STREET MANHATTAN | Alteration | Signed-off | 04/25/2025 | 04/30/2025 | Design VOCON Owner HINES INTEREST LP Filer RIZZO GROUP | Relocate office walls and finishes on the 10th Floor as per plans (CRM NKSFB.) No change to use, egress or occupancy. |
| M01207644 ↗ | 205 HUDSON STREET MANHATTAN | Alteration | Signed-off | 04/25/2025 | 04/29/2025 | Design ROBERT DERECTOR ASSOCIATES Owner HINES INTEREST LP Filer RIZZO GROUP | Modifications to the existing HVAC System: Redistribution of ductwork to accommodate new layout on the 10th Floor as per plans (CRM NKSFB.) … |
| M01147118 ↗ | 160 VARICK STREET MANHATTAN | Alteration | Signed-off | 01/03/2025 | 01/06/2025 | Design VOCON | MINOR INTERIOR RENVATION TO OFFICE SPACE WORK AS PER PLANS |
| M01147142 ↗ | 160 VARICK STREET MANHATTAN | Alteration | Signed-off | 01/03/2025 | 01/03/2025 | Design ROBERT DERECTOR ASSOCIATES Owner TRINITY HUDSON HOLDINGS Filer CORNERSTONE CONSULTING | MINOR MECHANICAL WORK & INSTALLATION OF AC UNIT AS PER PLANS. |
| M01149755 ↗ | 250 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 12/05/2024 | 12/10/2024 | Design AMA CONSULTING ENGINEERS, PC Owner BOSTON PROPERTIES Filer GILLMAN CONSULTING INC | Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy. |
| M01149706 ↗ | 250 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 12/05/2024 | 12/09/2024 | Owner BOSTON PROPERTIES Filer GILLMAN CONSULTING INC | Interior fit out, partitions, ceilings, doors and finishes as shown on plans filed herewith. No change in use, egress or occupancy. |
| M01111332 ↗ | 601 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 10/23/2024 | 10/29/2024 | General construction on floors 1 and 2 as per plans filed herewith. No changes in use, egress or occupancy. | |
| M01112769 ↗ | 601 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 10/23/2024 | 10/25/2024 | Owner RXR SL Owner, LLC Filer RIZZO GROUP | Mechanical modifications on floors 1 and 2 as per plans filed herewith. No changes in use, egress or occupancy. |
| M01063114 ↗ | 1459 BROADWAY MANHATTAN | Alteration | Signed-off | 06/18/2024 | 09/24/2024 | Design AKF ENGINEERS, LLP Owner BOSTON PROPERTIES Filer GILLMAN CONSULTING INC | Removal and whitebox with new core toilet upgrade as shown on drawings. No change in use, egress or occupancy. |
| M01014689 ↗ | 21 WEST 53 STREET MANHATTAN | Alteration | Signed-off | 06/19/2024 | 07/25/2024 | Design GRUMMAN BUTKUS ASSOCIATES Filer GILLMAN CONSULTING INC | REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 7TH FLOOR AS PER PLANS FILED HEREWITH. … |
| M00994747 ↗ | 160 VARICK STREET MANHATTAN | Alteration | Signed-off | 02/29/2024 | 03/07/2024 | Design VOCON | MINOR INTERIOR OFFICE SPACE WORK AS PER PLANS |
| M00994765 ↗ | 160 VARICK STREET MANHATTAN | Alteration | Signed-off | 03/05/2024 | 03/07/2024 | Design ROBERT DERECTOR ASSOCIATES | MINOR MECHANICAL WORK TO ASSOCIATED DUCTS AS PER PLANS. |
| M00980226 ↗ | 200 HUDSON STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/26/2024 | Design SEVERUD ASSOCIATES Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | STRUCTURAL SLAB INFILL WORK AS PER PLANS |
| M00928044 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Permit Issued | 12/19/2023 | 02/17/2024 | Design ASDA ARCHITECTURE + DESIGN | CSG - Construction work on the 23rd floor as indicated on drawings. EN drawings for lighting are submitted under M00931065-I1 |
| M00980190 ↗ | 200 HUDSON STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/16/2024 | Design ROBERT DERECTOR ASSOCIATES Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | MINOR MECHANICAL WORK AS PER PLANS |
| M00980176 ↗ | 200 HUDSON STREET MANHATTAN | Alteration | Signed-off | 02/12/2024 | 02/14/2024 | Design VOCON Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | INTERIOR REMOVAL OF NON LOAD BEARING WALLS AND INFILL OF OPENINGS IN THE SLAB AS PER PLANS. |
| M00964702 ↗ | 1459 BROADWAY MANHATTAN | Alteration | Signed-off | 01/23/2024 | 02/12/2024 | Owner BOSTON PROPERTIES Filer GILLMAN CONSULTING INC | Demising of single tenant floor to become a multi tenant floor. Upgrade corridor and elevator lobby as shown on drawings. No change in use… |
| M00964707 ↗ | 1459 BROADWAY MANHATTAN | Alteration | Signed-off | 01/30/2024 | 02/12/2024 | Design AKF ENGINEERS, LLP Owner BOSTON PROPERTIES Filer GILLMAN CONSULTING INC | Modification to HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy. |
| M00873853 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 10/19/2023 | 02/08/2024 | Design ASDA ARCHITECTURE + DESIGN Owner CBRE | Next Model - Construction work on the 6th floor as indicated on drawings. EN drawings for lighting are submitted under M00873868-I1 |
| M00931065 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Permit Issued | 01/26/2024 | 01/31/2024 | Design GOLDMAN COPELAND ASSOC. | CSG - Mechanical work on the 23rd floor as indicated on drawings. |
| M00932764 ↗ | 14 WASHINGTON PLACE MANHATTAN | Alteration | Signed-off | 10/06/2023 | 12/29/2023 | Owner NEW YORK UNIVERSITY Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING TO MODIFY PLUMBING FIXTURES IN EXISTING APARTMENT # 2FG, 8A, 9M, AND 11A AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE… |
| M00841576 ↗ | 225 VARICK STREET MANHATTAN | Alteration | Signed-off | 04/17/2023 | 12/28/2023 | Design WSP Owner TRINITY HUDSON HOLDINGS Filer RIZZO GROUP | Structural modifications: Concrete infill of slab opening at removed stair on the 2nd Floor as per plans (NYSC Space - Demo & White box.) No… |
| M00864094 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/09/2023 | 12/28/2023 | Owner NBCUNIVERSAL Filer DOMANI CONSULTING | STRUCTURAL WORK ON THE 10TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00930736 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Permit Issued | 10/24/2023 | 12/28/2023 | Design GOLDMAN COPELAND ASSOC. | Restrooms - Mechanical work on the 6th floor as indicated on drawings. |
| M00959703 ↗ | 761 5 AVENUE MANHATTAN | Alteration | Permit Issued | 11/20/2023 | 12/28/2023 | Design AMA CONSULTING ENGINEERS, PC Owner BXP Filer GILLMAN CONSULTING INC | Removal of sprinkler heads and related piping. Temporary Core Sprinkler Protection as shown on drawings. No change in use, egress or occup… |
| M08041138 ↗ | 21 WEST 53 STREET MANHATTAN | Alteration | Signed-off | 12/08/2022 | 12/28/2023 | Design COOPER ROBERTSON Filer GILLMAN CONSULTING INC | REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 14 FLOOR (NORTH OFFICE) AS PER PLANS FI… |
| M00825633 ↗ | 601 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/24/2023 | 12/27/2023 | Design CORGAN Owner BOSTON PROPERTIES | Scheduled proposed FFE layout and new partitions, new fire alarm strobes. No change in use, occupancy or egress. |
| M00873868 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 10/23/2023 | 12/27/2023 | Design GOLDMAN COPELAND ASSOC. Owner CBRE | Next Model- Mechanical work on the 6th floor as indicated on drawings |
| M00928035 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Permit Issued | 10/19/2023 | 12/27/2023 | Design ASDA ARCHITECTURE + DESIGN | Restrooms - Construction work on the 6th floor as indicated on drawings. EN drawings for lighting submitted under M00930736-I1 |
| M00932453 ↗ | 1 WASHINGTON SQ VLLGE MANHATTAN | Alteration | Signed-off | 10/09/2023 | 12/27/2023 | Owner NEW YORK UNIVERSITY Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING TO MODIFY PLUMBING FIXTURES ON EXISTING APARTMENT # 3J, 4O, 9O, 13A, AND PHD AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO… |
| M00932701 ↗ | 100 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 10/09/2023 | 12/27/2023 | Owner NEW YORK UNIVERSITY Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING TO MODIFY PLUMBING FIXTURES ON EXISTING APARTMENT # 6F AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPA… |
| M00932822 ↗ | 14 WASHINGTON PLACE MANHATTAN | Alteration | Signed-off | 10/06/2023 | 12/27/2023 | Owner NEW YORK UNIVERSITY Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING TO MODIFY PLUMBING FIXTURES IN EXISTING APARTMENT # 8F AND PHCD AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS … |
| M00913584 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 08/17/2023 | 08/23/2023 | Owner CBRE | Construction work on the 16th floor (gard work) as indicated on drawings |
| M00913608 ↗ | 40 FULTON STREET MANHATTAN | Alteration | Signed-off | 08/18/2023 | 08/23/2023 | Design GOLDMAN COPELAND ASSOC. Owner CBRE | Mechanical work on the 16th floor (gard work) as indicated on drawings. |
| M00841699 ↗ | 225 VARICK STREET MANHATTAN | Alteration | Signed-off | 04/14/2023 | 04/19/2023 | Design ROBERT DERECTOR ASSOCIATES Owner TRINITY HUDSON HOLDINGS Filer RIZZO GROUP | Modifications to the existing HVAC System: removal of existing AC Unit, associated ductwork, piping and controls on the 1st and 2nd Floor as… |
| M00841526 ↗ | 225 VARICK STREET MANHATTAN | Alteration | Signed-off | 04/14/2023 | 04/18/2023 | Design VOCON Owner TRINITY HUDSON HOLDINGS Filer RIZZO GROUP | Minor interior demolition: Removal of interior partitions and internal stairs. Patch perimeter to white box finish condition on the 1-2nd Fl… |
| M00853551 ↗ | 435 HUDSON STREET MANHATTAN | Alteration | Signed-off | 04/12/2023 | 04/18/2023 | Design ROBERT DERECTOR ASSOCIATES | Modifications to the existing HVAC System; Removal of ductwork, piping, HVAC equipment, controls, exhaust fans, air outlets, etc. and protec… |
| M00853537 ↗ | 435 HUDSON STREET MANHATTAN | Alteration | Signed-off | 04/12/2023 | 04/14/2023 | Design VOCON Owner HINES Filer RIZZO GROUP | Minor interior demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 3rd Floor as per plans (H… |
| M08044166 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Signed-off | 02/16/2023 | 03/06/2023 | Design HUNTSMAN ARCHITECTURAL GROUP Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | CONSTRUCTION OF NEW CORE RESTROOM, JANITORS CLOSET AD NEW DEMISING WALL AS PER PLANS. |
| M08050185 ↗ | 431 CANAL STREET MANHATTAN | Alteration | Signed-off | 02/16/2023 | 03/06/2023 | Owner HINES INTEREST LP Filer CORNERSTONE CONSULTING | minor mechanical work as per plans |
| M00705782 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/09/2022 | 02/16/2023 | Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Demolition work and construction work as per plans. No change to use, egress or occupancy. |
| M00705841 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/06/2022 | 02/16/2023 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Alterations to existing piping, ductwork as per plans. No change to use, egress or occupancy. |
| M00722524 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 05/04/2022 | 02/16/2023 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Removal and rerouting of existing chilled and steam piping to accommodate new elevator pit on 39th floor (tenant) / 38th floor (CO). No chan… |
| M00814389 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 01/19/2023 | 01/24/2023 | Owner NBCUNIVERSAL | Part Framing Plan at 46th floor. No change in egress, use, or occupancy. |
| M00496474 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/14/2021 | 01/18/2023 | Design DESIGN REPUBLIC Owner NBCUNIVERSAL | 2nd floor is tenant. Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or oc… |
| M08007055 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/26/2022 | 12/23/2022 | Design ADVANTAGE ARCHITECTURE PLLC Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Demolition work and general construction including installation of partitions, ceilings, flooring as per plans filed herewith. No change to … |
| M00674170 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/08/2022 | 12/22/2022 | Stair removal slab over work between Floors 37 and 38 as per plans. No change to use, egress or occupancy. | |
| M08007099 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 10/26/2022 | 12/22/2022 | Design ROBERT DERECTOR ASSOCIATES | Installation of ductwork as per plans. No change to use, egress or occupancy. |
| M00626884 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/17/2022 | 12/14/2022 | Design BONSIGNORE ARCHITECTS | PART 27TH FLOOR DEMOLITION TO INCLUDE THE REMOVAL OF INTERIOR NON LOADBEARING PARTITIONS, DOORS, AND FINISHES AS PER PLANS FILED HEREWITH. N… |
| M00626940 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/21/2022 | 12/14/2022 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Modifications to mechanical system as per plans. No change to use, egress or occupancy. |
| M08041157 ↗ | 21 WEST 53 STREET MANHATTAN | Alteration | Signed-off | 12/08/2022 | 12/14/2022 | Design GRUMMAN BUTKUS ASSOCIATES | Modification to existing HVAC ductwork for the 14th floor (North Office) as per plans filed herewith. No change in use, egress or occupancy … |
| M08046603 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/08/2022 | 12/14/2022 | Owner NBCUNIVERSAL Filer DOMANI CONSULTING | STRUCTURAL WORK ON THE 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00685113 ↗ | 70-32 70TH STREET QUEENS | Alteration CO | Permit Issued | 05/04/2022 | 12/09/2022 | Design PIROOZ ENGINEERING, P.C. Filer ROYAL T&E LLC | Installation of temporary construction fence |
| M00621001 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 12/23/2021 | 11/17/2022 | Design AMA CONSULTING ENGINEERS, PC Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | Mechanical demolition as per plans. No change to use, egress or occupancy. |
| M08005372 ↗ | 21 WEST 53 STREET MANHATTAN | Alteration | Signed-off | 09/27/2022 | 10/05/2022 | Design COOPER ROBERTSON Filer GILLMAN CONSULTING INC | REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, DOORS, CEILING AND RELATED FINISHES FOR THE 14 FLOOR (SOUTH OFFICE) AS PER PLANS FI… |
| M08005393 ↗ | 21 WEST 53 STREET MANHATTAN | Alteration | Signed-off | 09/27/2022 | 10/05/2022 | Design GRUMMAN BUTKUS ASSOCIATES Filer GILLMAN CONSULTING INC | Modification to existing HVAC ductwork as per plans filed herewith. No change in use, egress or occupancy under this application. |
| M00620960 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 12/14/2021 | 09/27/2022 | Design BONSIGNORE ARCHITECTS Owner TISHMAN SPEYER Filer WALTER T. GORMAN, PE, PC | 6th, 37th, 38th and 39th floor demolition to include the removal of interior non load bearing partitions, doors and finishes as per plans. N… |
| M00717340 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/01/2022 | 09/27/2022 | Design THE SWITZER GROUP Owner NBCUNIVERSAL | Space upgrade - Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use,egress or occupanc… |
| M00733776 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/08/2022 | 09/27/2022 | Installation on interior non-load bearing partitions, doors, ceilings, and related finishes as shown on plans filed herewith. No change in … | |
| M00733823 ↗ | 300 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/08/2022 | 09/27/2022 | Owner 300 PARK AVENUE Filer GILLMAN CONSULTING INC | Modify mechanical ductwork and associated piping as shown on drawings filed herewith. No change in use, egress or occupancy. |
| M00761535 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/01/2022 | 09/27/2022 | Design BUILDING STUDIO ARCHITECTS Owner TISHMAN SPEYER Filer RIZZO GROUP | General construction modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy |
| M00761542 ↗ | 1260 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/02/2022 | 09/27/2022 | Design AKF ENGINEERS, LLP Owner TISHMAN SPEYER Filer RIZZO GROUP | Mechanical modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy |
| M00789200 ↗ | 1250 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/29/2022 | 09/11/2022 | Design THE SWITZER GROUP | Cosmetic renovation of finishes, plumbing fixtures and stall metal partitions |