← Back
BuildNYC
Elevator apt, converted
Mohawk Apartments
379 WASHINGTON AVENUE · Clinton Hill · BIN 3341956
💬 Discuss this project
1905Year Built
7Stories
D5Building Class
R6BZoning
113,924 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized29 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, converted · Owner of record: 5523-Washington Ave & St James Brooklyn · 35,772 sf lot · 3.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPatch and repair defective metal corniceUnder Construction3p · 3 filings · 20 docs
Floor 3Unit 3A, Unit 3B, Unit 3C +513p · 4 filings · 20 docs
Floor 2Unit 2EUnder Construction24p · 1 filing · 7 docs
Floor 1Unit 1F21p · 4 filings · 16 docs
CellarReconnect boilers4p · 4 filings · 20 docs
BasementPatch and repair defective metal corniceUnder Construction1p · 1 filing · 12 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction23p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
5523- Washington Ave St James4407/08/2026
Akelius907/08/2026
Mohawk Housing Associates503/21/2026
MS Realty203/21/2026
Pres103/21/2026
Ocwen Federal Bank FS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/31/2016$56.5M—MOHAWK HOUSING ASSOCIATES, L.P. → 5523-WASHINGTON AVE & ST. JAMES BROOKLYN LLC$496/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JLC Code Consulting303/21/2026
Akelius Real Estate Management1403/21/2026
Codegreen203/21/2026
Hierarch-E203/21/2026
Perotto Group403/21/2026
Code403/21/2026
Haider Engineering, P.E.203/21/2026
W J Professional Expediting Company403/21/2026
Expediting103/21/2026
Haider Engineering P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Casur Management & MaintenanceGeneral Contractor703/21/2026
JJS BuildersScaffold603/21/2026
LCS RestorationScaffold508/30/2026
Galaxy ElectricElectrical503/22/2026
Infiniti Esc PlumbingPlumbing507/08/2026
The Puma Home RepairGeneral Contractor407/08/2026
Yarks NYCScaffold407/08/2026
Euda Construction DesGeneral Contractor403/21/2026
King's Plaza Plumbing & Heating IPlumbing307/08/2026
S.J. Fuel Companyspecialty_contractor303/21/2026
Maspeth Mechanical PlumbingPlumbing203/21/2026
AMC Plumbing & Heating CLNGPlumbing203/21/2026
Kings Plaza P & HPlumbing207/08/2026
CVM ConstructionGeneral Contractor203/21/2026
Casur Management & Maintenancespecialty_contractor203/21/2026
G J Plumbing & HeatingPlumbing103/21/2026
Casur ContractingGeneral Contractor111/20/2026
Odyssia Global Commercialspecialty_contractor107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
LCS Restorationspecialty_contractor104/09/2026
Sahara ContractingGeneral Contractor103/21/2026
Squan Construction ServicesGeneral Contractor103/21/2026
Colgate MaintenanceGeneral Contractor103/21/2026
Arete DevelopmentGeneral Contractor108/29/2011
BMDC ConstructionGeneral Contractor207/13/2017
Cisco Gen ConstructionGeneral Contractor109/07/2006
Colgate RestorationGeneral Contractor208/09/2013
Costrotta Construction MaGeneral Contractor112/04/2012
Davrial EnterprisesGeneral Contractor109/09/2010
Oleni ContractingGeneral Contractor110/26/2021
Rolando MechanicalPlumbing209/25/2018
Somerset ConstructionGeneral Contractor108/10/2017
Telcom Engineering GPGeneral Contractor108/25/2015
Tristate Plumbing ServicesPlumbing107/18/2017
V&E General ConstructionGeneral Contractor112/14/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544102/17/2026
Geiger Engineering689110/14/2025
Gregory V. Perotto, P.E.947202/27/2023
Joseph Martines PE1428503/23/2022
Jeremy K McKeon, P.E.7263110/20/2021
RLM Engineering6913111/04/2019
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
11/19/2026
Permit issued — General Construction
B01298794-I1-GC
11/04/2026
Filed — Alteration CO
PLUMBING WORK IN CONJUNCTION WITH THE SPLIT OF UNIT 2E TO TWO SEPARATE RESIDENTIAL UNITS (2E-1 AND 2E-2) LOCATED ON THE SECOND FLOOR. NO CHANGE IN USE, OR OCCUPANCY. CHANGE TO EGRESS. NEW CO TO BE OBTAINED.
B01298794-S1
11/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
11/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
267 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCasur Contracting11/19/2026
DOB NOWSidewalk ShedPermit IssuedLCS Restoration08/27/2026
DOB NOWSidewalk ShedPermit IssuedLCS Restoration06/02/2026
DOB NOWSupported ScaffoldPermit IssuedLCS Restoration03/11/2026
DOB NOWSidewalk ShedPermit IssuedLCS Restoration03/11/2026
DOB NOWGeneral ConstructionPermit IssuedLCS Restoration03/06/2026
DOB NOWSuspended ScaffoldPermit IssuedPedrol Contracting03/05/2026
DOB NOWSidewalk ShedPermit IssuedLCS Restoration11/14/2025
DOB NOWPlumbingSigned-offKing's Plaza Plumbing & Heating I06/28/2023
DOB NOWMechanical SystemsSigned-offS.J. Fuel Company02/22/2023
DOB NOWSupported ScaffoldPermit IssuedYarks NYC10/31/2022
DOB NOWSidewalk ShedPermit IssuedYarks NYC10/31/2022
DOB NOWPlumbingSigned-offGregg NY Plumbing04/26/2022
DOB NOWGeneral ConstructionSigned-offThe Puma Home Repair03/31/2022
DOB NOWPlumbingSigned-offKing's Plaza Plumbing & Heating I03/15/2022
DOB NOWPlumbingSigned-offKings Plaza P & H12/27/2021
DOB NOWAntennaPermit IssuedOdyssia Global Commercial12/21/2021
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing10/29/2021
DOB NOWGeneral ConstructionSigned-offThe Puma Home Repair10/21/2021
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing09/08/2021
DOB NOWMechanical SystemsSigned-offCasur Management & Maintenance06/24/2021
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing04/27/2021
DOB NOWGeneral ConstructionSigned-offCasur Management & Maintenance04/09/2021
DOB NOWPlumbingSigned-offKings Plaza P & H08/23/2019
DOB NOWSupported ScaffoldSigned-offJJS Builders03/29/2019
DOB NOWSidewalk ShedSigned-offJJS Builders03/28/2019
BISPLISSUEDInfiniti Esc Plumbing04/13/2023
BIS—ISSUEDCasur Management & Maintenance01/28/2022
BISOTISSUEDOleni Contracting10/26/2021
BISOTISSUEDCasur Management & Maintenance10/18/2021
BISMHISSUEDCasur Management & Maintenance10/18/2021
BISPLISSUEDInfiniti Esc Plumbing03/04/2021
BISOTISSUEDCasur Management & Maintenance03/03/2021
BISMHISSUEDCasur Management & Maintenance03/03/2021
BISBLISSUEDKings Plaza P & H10/16/2020
BISPLISSUEDInfiniti Esc Plumbing03/16/2020
BISOTISSUEDCasur Management & Maintenance02/25/2020
BISMHISSUEDCasur Management & Maintenance02/25/2020
BISPLISSUEDAMC Plumbing, Heating & CLNG04/08/2019
BISOTISSUEDEuda Construction03/22/2019
+ 36 more permits on file
1 project · most recent 11/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/04/2026——Gas, Water/Sanitary
25 projects · most recent 04/02/2026
General Wiring Boiler Controls
FiledStatusContractorScope
04/02/2026Permit IssuedHigh Quality Electric of NYC—
03/31/2023CompleteGalaxy ElectricGeneral Wiring
03/31/2023CompleteGalaxy ElectricGeneral Wiring
04/05/2022CompleteLerco ElectricGeneral Wiring
01/27/2022CancelledGalaxy ElectricGeneral Wiring
10/26/2021CompleteLerco ElectricGeneral Wiring
03/31/2021CompleteGalaxy ElectricGeneral Wiring
03/31/2021CompleteGalaxy ElectricGeneral Wiring
03/31/2021CompleteGalaxy ElectricGeneral Wiring
03/31/2021CompleteGalaxy ElectricGeneral Wiring
03/31/2021CompleteGalaxy ElectricGeneral Wiring
03/31/2021CompleteGalaxy ElectricGeneral Wiring
03/29/2021CompleteGalaxy ElectricGeneral Wiring
03/29/2021CompleteGalaxy ElectricGeneral Wiring
03/09/2020Permit IssuedGalaxy Electric—
1 project · most recent 06/02/2026
Scaffold
FiledStatusContractorScope
06/02/2026Permit IssuedLCS RestorationScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/04/2026HVAC-R and service water piping design and insulation—energy_progress
11/03/2026Fire-Resistant Penetrations and Joints—special
10/08/2025FinalFADY HABEELprogress
10/08/2025Tenant Protection Plan ComplianceELISHA GEIGERspecial
10/08/2025Structural Stability – Alterations of existing buildingsFADY HABEELspecial
10/08/2025MasonryFADY HABEELspecial
10/07/2025Fire-Resistance Rated Construction—progress
10/07/2025Fire-Resistant Penetrations and Joints—special
09/23/2025Structural Stability – Alterations of existing buildings—special
09/23/2025Masonry—special
09/23/2025Tenant Protection Plan Compliance—special
09/23/2025Final—progress
03/01/2023Energy Code Compliance InspectionsGregory Perottoprogress
03/01/2023Fire-Resistant Penetrations and JointsGregory Perottospecial
03/01/2023Electrical energy consumptionGregory Perottoenergy_progress
09/28/2021Post-installed AnchorsJOSEPH MARTINESspecial
09/28/2021Mechanical SystemsJOSEPH MARTINESspecial
09/28/2021Heating SystemsJOSEPH MARTINESspecial
09/28/2021Fire-Resistant Penetrations and JointsJOSEPH MARTINESspecial
09/28/2021FinalJOSEPH MARTINESprogress
02/16/2021FinalDANA KOENITZERprogress
673 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account