← Back
Elevator apt, semi-fireproof with stores
39 AVENUE
QUEENS · BIN 4537917
💬 Discuss this project
2023Year Built
9Stories
D7Building Class
M1-3/R7XZoning
61,258 sfGross Floor Area
65Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 39TH AVE HOLDINGS 2 LLC · 8,800 sf lot · 6.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof67p · 3 filings · 20 docs
Floor 758p · 1 filing · 20 docs
Floor 658p · 1 filing · 20 docs
Floor 558p · 1 filing · 20 docs
Floor 459p · 1 filing · 20 docs
Floor 357p · 1 filing · 20 docs
Floor 258p · 1 filing · 20 docs
Floor 164p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEVELOPING NY STATE7407/08/2026
METRO CONTRACTING NY903/22/2026
39TH AVE HOLDINGS 2 LLC103/22/2026
DEVELOPING NYS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2022$9.5M—AHRC NYC NEW PROJECTS, INC. → 39TH AVE HOLDINGS 2 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING803/21/2026
AE DESIGN SOLUTION603/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
ADVANCED BUILDERS SERVICES5003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEVELOPING NY STATE LLCGeneral Contractor3007/08/2026
METRO CONTRACTING NY, INC.General Contractor403/21/2026
SAFETY FIRE SPRINKLER CORPFire Protection407/08/2026
BAYPORT CONSTRUCTION CORP.General Contractor403/21/2026
COLGATE ENTERPRISE CORPGeneral Contractor307/08/2026
RRP PLUMBING CORPPlumbing207/08/2026
DVE CONSTRUCTION INCGeneral Contractor204/09/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
WEN BIN CENElectrical103/21/2026
RRP PLUMBING CORPFire Protection107/08/2026
DYNAMIC ELEC'L CONTRS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC9405408/29/2025
BIG APPLE GROUP NY A RMA91682203/27/2025
TOHFAZ UDDIN P.E.2001306/29/2023
FNA ENGINEERING SERVICES7846506/23/2023
Building Lifecycle
All (227)Filed (40)Permit Issued (30)Signed Off (12)Violation (14)Inspection (21)Objection (80)Special Inspection (30)
03/11/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
B
02/06/2026
Violation issued (HPD, closed)
C
01/17/2026
Filed — Alteration
INSTALLATION OF A BUSINESS ACCESSORY NON-ILLUMINATED WALL SIGN, DOUBLE FACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01340204-I1
01/17/2026
Filed — Alteration
INSTALLATION OF A BUSINESS ACCESSORY NON-ILLUMINATED WALL SIGN, DOUBLE FACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01340205-I1
01/01/2026
Violation issued (HPD, closed)
C
01/01/2026
Violation issued (HPD, closed)
B
01/01/2026
Violation issued (HPD, closed)
C
01/01/2026
Violation issued (HPD, closed)
C
10/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/09/2025
Permit issued — Sprinklers
Q01277609-I1-EW-SP
09/09/2025
Permit issued — Plumbing
Q01277594-I1-PL
09/05/2025
Permit issued — General Construction
Q01277544-I1-GC
09/04/2025
Permit issued — Mechanical Systems
Q01277582-I1-MS
08/29/2025
Filed — Alteration
NEW MECHANICAL SYSTEM FOR EXISTING TENANT SPACE: NEW OUTDOOR CONDENSER UNITS ON ROOFTOP, NEW AIR HANDLER UNITS WITHIN TENANT SPACE, NEW DUCTWORK AND DIFFUSERS PER NEW DENTAL OFFICE LAYOUT, NEW EXHAUST FAN AND DUCTWORK, NEW FRESH AIR INTAKE SYSTEM.
Q01277582-I1
08/29/2025
Filed — Alteration
Q01277544-I1
08/29/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES PER DENTAL OFFICE LAYOUT AND REQUIREMENT. INSTALL NEW DENTAL PLUMBING PER DENTAL CONSULTANT'S DIRECTIONS. NEW PLUMBING FIXTURE CALCULATION PER PLUMBING CODE. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01277594-I1
08/28/2025
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM PER DENTAL OFFICE LAYOUT. NO CHANGE TO OCCUPANCY, GROUP AND USE.
Q01277609-I1
08/26/2025
Special inspection requirement — Maintenance information
XIU CHEN
08/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
08/26/2025
Special inspection requirement — Lighting controls
XIU CHEN
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
08/26/2025
Special inspection requirement — Shutoff dampers
XIU CHEN
08/26/2025
Special inspection requirement — Duct leakage testing, insulation and design
XIU CHEN
08/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
08/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
08/26/2025
Special inspection requirement — Interior lighting power
XIU CHEN
08/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
08/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
08/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
08/26/2025
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
08/26/2025
Special inspection requirement — Mechanical Systems
XIU CHEN
08/26/2025
Special inspection requirement — Maintenance information
XIU CHEN
08/26/2025
Special inspection requirement — Heating Systems
XIU CHEN
08/26/2025
Special inspection requirement — Final
XIU CHEN
06/11/2025
Special inspection requirement — Preliminary
Soorjbally Harilall
06/11/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
06/11/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
06/11/2025
Special inspection requirement — Metering
Soorjbally Harilall
06/11/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
06/11/2025
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
06/11/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
06/11/2025
Special inspection requirement — Lighting controls
Soorjbally Harilall
06/11/2025
Special inspection requirement — Air barrier — testing
Soorjbally Harilall
06/11/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
05/29/2025
Objection resolved — Addressed
05/19/2025
Signed off — New Building
Construction fence plans filed in conjunction with Alt1 application #Q00683048-I1
Q00683048-S8
05/14/2025
Signed off — New Building
Construction fence plans filed in conjunction with Alt1 application #Q00683048-I1
Q00683048-S7
04/09/2025
Objection raised — Other
03/27/2025
Filed — New Building
Construction fence plans filed in conjunction with Alt1 application #Q00683048-I1
Q00683048-A9
02/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00835457-I1
01/15/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
Latest 60 of 227 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.09/09/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP09/09/2025
DOB NOWGeneral ConstructionSigned-offDVE CONSTRUCTION INC09/05/2025
DOB NOWMechanical SystemsPermit IssuedDVE CONSTRUCTION INC09/04/2025
DOB NOWStructuralSigned-offDEVELOPING NY STATE LLC06/02/2024
DOB NOWMechanical SystemsSigned-offDEVELOPING NY STATE LLC05/02/2024
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN04/05/2024
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.03/13/2024
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC03/04/2024
DOB NOWGeneral ConstructionPermit IssuedDEVELOPING NY STATE LLC01/10/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP11/30/2023
DOB NOWCurb CutSigned-offDEVELOPING NY STATE LLC09/05/2023
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP07/28/2023
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP07/25/2023
DOB NOWPlumbingSigned-offSAFETY FIRE SPRINKLER CORP07/25/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP07/25/2023
DOB NOWSupported ScaffoldSigned-offBAYPORT CONSTRUCTION CORP06/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP06/21/2023
DOB NOWMechanical SystemsSigned-offDEVELOPING NY STATE LLC05/08/2023
DOB NOWStructuralSigned-offDEVELOPING NY STATE LLC05/08/2023
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC03/22/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/22/2023
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.03/16/2023
DOB NOWGeneral ConstructionPermit IssuedDEVELOPING NY STATE LLC01/26/2023
DOB NOWEarth WorkSigned-offDEVELOPING NY STATE LLC01/03/2023
DOB NOWSupport of ExcavationSigned-offDEVELOPING NY STATE LLC12/14/2022
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP12/01/2022
DOB NOWEarth WorkSigned-offDEVELOPING NY STATE LLC05/09/2022
DOB NOWSupport of ExcavationSigned-offDEVELOPING NY STATE LLC04/15/2022
DOB NOWConstruction FenceSigned-offDEVELOPING NY STATE LLC04/06/2022
2 projects · most recent 08/29/2025
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/29/2025Permit IssuedDVE CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×2
PUMY-P48NKMU1 48,000 BTU · Vrf Outdoor ×2
03/27/2025Signed-offDEVELOPING NY STATE LLCAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin FTK12BXVJU 10,900 BTU · Fan Coil Indoor ×2
RK12BXVJU 10,900 BTU · Condensing Unit ×2
Heat / Cool
Daikin FXAQ07PVJU 7,500 BTU · Vrf Indoor ×116
FXAQ18PVJU 18,000 BTU · Vrf Indoor ×104
RXTQ36TBVJUA 36,000 BTU · Vrf Outdoor ×80
FXAQ12PVJU 12,000 BTU · Vrf Indoor ×40
FXAQ09PVJU 9,500 BTU · Vrf Indoor ×36
FXAQ24PVJU 24,000 BTU · Vrf Indoor ×4
RXTQ48TBVJUA 48,000 BTU · Vrf Outdoor ×4
RXB12AXVJU 11,000 BTU · Condensing Unit ×2
FXMQ48PBVJU 48,000 BTU · Vrf Indoor ×2
Heating
Berko SRA 1012DS 3,412 BTU · Electric Heater ×160
N/A 10,200 BTU · Electric Heater ×4
Qmark CSH-07A 3,840 BTU · Baseboard ×48
Neptronic N/A 3 kW · Ductwork ×8
Ventilation
Greenheck G-100-VG 840 CFM · Exhaust Fan ×14
G-095-VG 480 CFM · Exhaust Fan ×12
QEID-18-65 3,285 CFM · Exhaust Fan ×2
SQ-60-VG 40 CFM · Exhaust Fan ×2
SQ-70-VG 100 CFM · Exhaust Fan ×2
SQ-90-VG 275 CFM · Exhaust Fan ×2
Panasonic FV-30VQ3 290 CFM · Exhaust Fan ×18
N/A N/A 255 CFM ×2
Oxygen8 Nova ERV-A18 690 CFM · Erv ×2
Tjernlund RT1500 1,200 CFM · Exhaust Fan ×2
1 project · most recent 03/27/2025
Sprinkler System
FiledStatusContractorScope
03/27/2025Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
2 projects · most recent 08/29/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/29/2025Signed-offRRP PLUMBING CORPWater/Sanitary
03/27/2025Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
8 projects · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
07/29/2025CompleteDYNAMIC ELEC'L CONTRS INC—
07/09/2025CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
03/19/2024CompleteDYNAMIC ELEC'L CONTRS INCGeneral Wiring
07/28/2023CompleteDYNAMIC ELEC'L CONTRS INC1 meters, 1 new_meters
06/20/2023CompleteNASH ELECTRIC SERVICES IN—
03/16/2023CompleteRICHARD NEU—
01/25/2023CancelledDYNAMIC ELEC'L CONTRS INC1 meters, 1 new_meters
1 project · most recent 03/27/2025
Steel Concrete
FiledStatusContractorScope
03/27/2025Signed-offDEVELOPING NY STATE LLCSteel, Concrete
1 project · most recent 03/27/2025
Fence
FiledStatusContractorScope
03/27/2025Signed-offDEVELOPING NY STATE LLCFence
2 projects · most recent 08/29/2025
Tenant Protection Plan 72 Hour Dewatering Earthwork
FiledStatusContractorScope
08/29/2025Permit IssuedDVE CONSTRUCTION INCTenant Protection Plan 72 Hour
03/27/2025Signed-offDEVELOPING NY STATE LLCDewatering, Earthwork
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
03/11/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/15/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/15/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/13/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/13/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/25/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/14/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/14/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
04/21/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/26/2025Duct leakage testing, insulation and designXIU CHENenergy_progress
08/26/2025Maintenance informationXIU CHENenergy_progress
08/26/2025Shutoff dampersXIU CHENenergy_progress
08/26/2025HVAC-R and service water heating system controlsXIU CHENenergy_progress
08/26/2025HVAC-R and service water piping design and insulationXIU CHENenergy_progress
08/26/2025HVAC-R and service water heating equipmentXIU CHENenergy_progress
08/26/2025Energy Code Compliance InspectionsXIU CHENprogress
08/26/2025FinalXIU CHENprogress
08/26/2025Tenant Protection Plan ComplianceXIU CHENspecial
08/26/2025Heating SystemsXIU CHENspecial
08/26/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
08/26/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
08/26/2025Mechanical SystemsXIU CHENspecial
08/26/2025Lighting controlsXIU CHENenergy_progress
08/26/2025Interior lighting powerXIU CHENenergy_progress
08/26/2025Maintenance informationXIU CHENenergy_progress
08/26/2025Energy Code Compliance InspectionsXIU CHENprogress
08/26/2025Tenant Protection Plan ComplianceXIU CHENspecial
08/26/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
08/26/2025Tenant Protection Plan ComplianceXIU CHENspecial
06/11/2025Exterior lighting powerSoorjbally Harilallenergy_progress
06/11/2025Maintenance informationSoorjbally Harilallenergy_progress
06/11/2025Electrical motors and elevatorsSoorjbally Harilallenergy_progress
06/11/2025Fenestration areasSoorjbally Harilallenergy_progress
06/11/2025Fenestration air leakageSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 282 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
08/25/2026Q00683048-S3Request digital key ↗
08/25/2026Q00683048-S4Request digital key ↗
08/25/2026Q00683048-A5Request digital key ↗
Showing 3 of 40 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
11/21/2024420139987Open ↗
06/07/2024440712999Open ↗
09/14/2023440712999Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
11/26/2024440712999Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/26/2024440712999Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/22/2023440712999Open ↗
▸BISDOT 410 PERMITS1
11/26/2024440712999Open ↗
▸Zoning, Tax Lot & Property Records27
▸DOB NOWRestrictive Declaration/Easement 114
08/25/2026Q00683048-I1Open ↗
08/25/2026Q00683048-A2Open ↗
08/25/2026Q00683048-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/25/2026Q00683048-I1Open ↗
08/25/2026Q00683048-A2Open ↗
08/13/2026Q00683048-A7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/25/2026Q00683048-I1Open ↗
08/25/2026Q00683048-P1Open ↗
08/25/2026Q00683048-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications112
▸DOB NOWSpecial Inspector Seal & Signature41
09/23/2026Q01277582-I1Open ↗
09/02/2026Q00683048-A8Open ↗
09/01/2026Q00683048-P8Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
08/25/2026Q00683048-S1Open ↗
08/25/2026Q00683048-S2Open ↗
08/25/2026Q00683048-S5Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026Q01277582-I1Open ↗
09/23/2026Q01277582-I1Open ↗
09/02/2026Q00683048-A8Open ↗
Showing 3 of 29 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/22/2023440712999Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/22/2023440712999Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/25/2026Q00683048-P1Open ↗
08/25/2026Q00683048-A5Open ↗
08/25/2026Q00683048-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/25/2026Q00683048-I1—
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/25/2026Q00683048-P1Open ↗
08/25/2026Q00683048-I1Open ↗
08/25/2026Q00683048-A2Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREES SITE PLAN1
11/26/2024440712999Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/20/2023440712999Open ↗
▸BISSTREET TREE CHECKLIST1
09/20/2023440712999Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00683048-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos24
▸DOB NOWOER: Notice to Proceed13
08/25/2026Q00683048-I1Open ↗
08/25/2026Q00683048-A2Open ↗
08/25/2026Q00683048-A5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/25/2026Q00683048-I1Open ↗
Showing 1 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
11/07/2024440712999Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
07/22/2023440712999Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/25/2026Q00683048-P6Open ↗
08/14/2026Q00683048-P3Open ↗
08/14/2026Q00683048-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00683048-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00683048-S2Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/26/2024440712999Open ↗
▸BISCURB CUT (CC) SIGNOFF1
11/26/2024440712999Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
02/16/2010420139987Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/16/2010420139987Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
11/26/2024440712999Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
06/20/2024440712999Open ↗
02/16/2010420139987Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/22/2023440712999Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/22/2023440712999Open ↗
▸BISEFILING COVER SHEET1
02/16/2010420139987Open ↗
▸Other Documents30
▸DOB NOWSite Survey: Initial6
08/25/2026Q00683048-I1Open ↗
08/25/2026Q00683048-A2Open ↗
08/25/2026Q00683048-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/25/2026Q00683048-A7Open ↗
08/25/2026Q00683048-A5Open ↗
08/25/2026Q00683048-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/25/2026Q00683048-P1Open ↗
08/25/2026Q00683048-A2Open ↗
08/25/2026Q00683048-A7Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
07/22/2023440712999Open ↗
07/22/2023440712999Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00683048-S1Open ↗
08/13/2026Q00683048-S2Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
09/20/2023440712999Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
11/26/2024440712999Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
11/26/2024440712999Open ↗
▸BISPLOT DIAGRAM1
02/16/2010420139987Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
11/26/2024440712999Open ↗
▸BISDOT COMPLIANCES AT ADA RAMPS AT CORNERSAND OPPOSITE SITE1
11/26/2024440712999Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00683048-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00683048-I1Open ↗