ECB08/25/2026At the time of inspection, it was observed that the contractor was performing work in violation of a stop work order (swo) issued on 08/12/2026. Exterior facade work at the building was observed to be completed$10K due
ECB08/06/2026Atoi observed work in progress at exterior of property exp 2. 4 men working on suspended scaffold doing eifs / facade work. Property has a swo issued for suspended scaffold under summon # - 39557125P. Pswo issu$10K due
ECB07/27/2026At time of inspection, observed a suspended scaffold installed without the required permit and site-specific design drawings, contrary to ac 28-105.1 and bc 3314.2. Upon request, no permit or required design dr$1K due
ECB07/27/2026At time of inspection, observed workers performing work at unprotected leading edges and platforms exceeding 6 feet above a lower level without the required guardrail system, contrary to bc 3315.1.5. The condit$5K due
ECB07/02/2026Work does not conform to plans. At time of inspection, approved DOB energy and architectual drawing calls out for window type W1 to have a penetrian of .25 upon inspection, window u-valve that contracter instal$620 due
HPD02/28/2014§ 27-2005 admin. Code: remove the illegal fastening -- double cylinder key operated lock installed on metal door street entrance to building
HPD09/28/2011§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD04/06/2011§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2026 ADMIN. CODE: RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL BUZZER IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY
HPD04/06/2011§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR FRAME IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY
HPD04/04/2011§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING, IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST
HPD04/04/2011§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING, IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT EAST
HPD05/01/2002§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYCLINDER KEY OPERATED LOCK, ON IRON GATE, ENTRANCE TO BUILDING. , 1st STORY