💬 Discuss this project
2025Year Built
18Stories
D6Building Class
R9XZoning
208,168 sfGross Floor Area
138Units
1 Active Violation 16 old, status unconfirmed ▸
Elevator apt, fireproof with stores · Owner of record: 26 East 35th Street · 17,373 sf lot · 11.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsContinuum CompanyUnder Construction4 filings
RoofTemporary roof and window protectionUnder Construction6p · 2 filings
Floor 2Temporary construction office and shantiesUnder Construction2p · 1 filing
Floor 1Temporary construction office and shantiesUnder Construction3p · 3 filings
CellarTemporary construction office and shantiesUnder Construction3p · 1 filing
Site & exteriorProposed pipe scaffoldUnder Construction11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Community Church1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Scaffolding GroupScaffold2008/16/2026
CM and Associates ConstructionGeneral Contractor809/03/2026
TT MechanicalPlumbing407/08/2026
Russo Development EnterprisesScaffold407/08/2026
A & M Electrical ServiceElectrical303/22/2026
MC SuperstructureScaffold307/08/2026
Doria ScaffoldingScaffold307/08/2026
CM and Associates ConstructionScaffold204/09/2026
Andamio ScaffoldingScaffold108/20/2026
JNR FlooringScaffold107/08/2026
Russo Development EnterprisesGeneral Contractor107/08/2026
King Hoist & Scaffoldingspecialty_contractor107/08/2026
Apollo Electric NYGElectrical103/21/2026
Northeast Electrical ContractorsElectrical103/22/2026
TTM GroupFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Rigging7880810/15/2026
Butterfield & O'Connor4189209/03/2026
Shahrish Shuvo Engineering85241307/23/2026
Socotec Engineering4983407/23/2026
Mueser Rutledge Consulting977508/18/2025
Chen Engineering Services1826202/11/2025
Age Engineering6695402/04/2025
Building Lifecycle
All (237)Filed (67)Permit Issued (38)Signed Off (6)Violation (56)Inspection (10)Objection (30)Special Inspection (30)
10/15/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY BETAMAX HOIST AND MINI CRANE FOR HOISTING AND INSTALLATION OF GLASS PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01355058-P5
10/15/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
10/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY BETAMAX HOIST AND MINI CRANE FOR HOISTING AND INSTALLATION OF GLASS PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01355058-P4
10/07/2026
Special inspection requirement — Post-installed Anchors
ZELJKO STEVANOVIC
09/17/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210503-P5
09/03/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01435891-P1
09/02/2026
Permit issued — General Construction
M01062289-I1-GC
08/31/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
BRIAN T. O'CONNOR
08/31/2026
Special inspection requirement — Post-installed Anchors
BRIAN T. O'CONNOR
08/18/2026
Permit issued — Supported Scaffold
M01435891-I1-SF
08/14/2026
Permit issued — Sidewalk Shed
M01210503-I1-SH
08/13/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
08/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
08/10/2026
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
08/10/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
ALEXIS SCHLESSINGERMAN
08/10/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
08/10/2026
Special inspection requirement — Vestibules
Shahrish Shuvo
08/10/2026
Special inspection requirement — Luminous Exit Path Markings
Shahrish Shuvo
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
08/10/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
08/10/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
08/10/2026
Special inspection requirement — Air barrier continuity plan testing
Shahrish Shuvo
08/10/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
08/05/2026
Objection resolved — Resolved
08/05/2026
Objection resolved — Resolved
08/05/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
BRIAN T. O'CONNOR
08/05/2026
Special inspection requirement — Post-installed Anchors
BRIAN T. O'CONNOR
07/31/2026
Objection raised — Other
07/31/2026
Objection raised — Other
07/27/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01435891-I1
07/23/2026
Filed — New Building
HEREWITH FILING PLUMBING WORK AS PER PLANS
M01062289-P9
07/22/2026
Filed — New Building
HEREWITH FILING PLUMBING WORK AS PER PLANS
M01062289-P8
07/22/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
ALEXIS SCHLESSINGERMAN
07/22/2026
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
07/22/2026
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
07/22/2026
Special inspection requirement — Vestibules
Shahrish Shuvo
07/22/2026
Special inspection requirement — Fenestration areas
Shahrish Shuvo
07/22/2026
Special inspection requirement — Air barrier continuity plan testing
Shahrish Shuvo
07/22/2026
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
07/22/2026
Special inspection requirement — Luminous Exit Path Markings
Shahrish Shuvo
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
07/22/2026
Special inspection requirement — Protection of exposed foundation insulation
Shahrish Shuvo
07/06/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY BETAMAX HOIST AND MINI CRANE FOR HOISTING AND INSTALLATION OF GLASS PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01355058-P3
07/01/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/19/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR A TEMPORARY CONSTRUCTION OFFICE & SHANTIES ON THE CELLAR, GROUND FLOOR, AND SECOND FLOOR. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDERTHIS APPLICATION.
M01335037-P1
06/16/2026
Filed — New Building
HEREWITH FILING PLUMBING WORK AS PER PLANS
M01062289-P7
06/11/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210503-P4
06/11/2026
Filed — Alteration
Installation of a temporary roof, overhead, and window protection, per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. , roof protect.
M01210523-P4
05/26/2026
Permit issued — Protection and Mechanical Methods
M01263953-I1-PMM
05/26/2026
Permit issued — Protection and Mechanical Methods
M01210523-I1-PMM
05/26/2026
Permit issued — Protection and Mechanical Methods
M01344416-I1-PMM
05/26/2026
Permit issued — Supported Scaffold
M01341781-I1-SF
05/26/2026
Permit issued — Construction Fence
M01210517-I1-FN
05/11/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/07/2026
Signed off — New Building
HEREWITH FILING PLUMBING WORK AS PER PLANS
M01062289-Z1
05/07/2026
Permit issued — Mechanical Systems
M01062289-S3-MS
Latest 60 of 237 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCM and Associates Construction09/02/2026
DOB NOWSupported ScaffoldPermit IssuedAndamio Scaffolding08/18/2026
DOB NOWSidewalk ShedPermit IssuedSkyline Scaffolding Group08/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group05/26/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group05/26/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group05/26/2026
DOB NOWSupported ScaffoldPermit IssuedSkyline Scaffolding Group05/26/2026
DOB NOWConstruction FencePermit IssuedSkyline Scaffolding Group05/26/2026
DOB NOWMechanical SystemsPermit IssuedCM and Associates Construction05/07/2026
DOB NOWSprinklersPermit IssuedTTM Group05/05/2026
DOB NOWStandpipePermit IssuedTT Mechanical05/05/2026
DOB NOWGeneral ConstructionPermit IssuedCM and Associates Construction04/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDoria Scaffolding04/09/2026
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding03/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedChristopher B. Mesbah02/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedDoria Scaffolding02/04/2026
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah01/27/2026
DOB NOWSupported ScaffoldPermit IssuedSkyline Scaffolding Group01/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group01/20/2026
DOB NOWPlumbingPermit IssuedTT Mechanical11/24/2025
DOB NOWStandpipePermit IssuedTT Mechanical11/13/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedJNR Flooring11/07/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah09/09/2025
DOB NOWConstruction FencePermit IssuedSkyline Scaffolding Group09/08/2025
DOB NOWSidewalk ShedPermit IssuedSkyline Scaffolding Group08/27/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group08/07/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSkyline Scaffolding Group08/01/2025
DOB NOWPlumbingSigned-offTT Mechanical07/02/2025
DOB NOWStructuralPermit IssuedChristopher B. Mesbah05/29/2025
DOB NOWFoundationPermit IssuedChristopher B. Mesbah05/29/2025
DOB NOWConstruction FencePermit IssuedChristopher B. Mesbah05/14/2025
DOB NOWSupport of ExcavationPermit IssuedChristopher B. Mesbah05/09/2025
DOB NOWStructuralSigned-offKing Hoist & Scaffolding02/12/2025
DOB NOWSupported ScaffoldSigned-offMC Superstructure10/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offRusso Development Enterprises08/07/2024
DOB NOWSidewalk ShedSigned-offMC Superstructure07/31/2024
DOB NOWFull DemolitionSigned-offRusso Development Enterprises07/17/2024
DOB NOWConstruction FenceSigned-offRusso Development Enterprises06/28/2024
BISMHISSUEDDynamic Air Conditioning07/27/2015
BISPLISSUEDNew York Heating02/21/2007
+ 9 more permits on file
1 project · most recent 07/23/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/23/2026Permit IssuedTT MechanicalStorm, Water/Sanitary
6 projects · most recent 12/15/2025
General Wiring
FiledStatusContractorScope
12/15/2025Permit IssuedA & M Electrical ServiceGeneral Wiring
12/11/2025Permit IssuedKnight Electrical ServiceGeneral Wiring
09/03/2025Permit IssuedTop Shelf Electric—
07/10/2025Permit IssuedA & M Electrical ServiceGeneral Wiring
10/30/2024CompleteNortheast Electrical Contractors—
07/31/2024CompleteNash Electric Services—
5 projects · most recent 09/17/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
09/17/2026Permit IssuedSkyline Scaffolding GroupSidewalk Shed
09/03/2026Permit IssuedAndamio ScaffoldingScaffold
02/23/2026Permit IssuedSkyline Scaffolding GroupScaffold
09/05/2025Permit IssuedSkyline Scaffolding GroupFence
07/22/2025Permit IssuedCM and Associates ConstructionFence
1 project · most recent 10/15/2026
Suspended Scaffold
FiledStatusContractorScope
10/15/2026Permit IssuedDoria ScaffoldingSuspended Scaffold
1 project · most recent 10/15/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
10/15/2026Permit IssuedDoria ScaffoldingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/01/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/17/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/24/2025Pass-Final PL - UndergroundPassView ↗
09/10/2025Pass-Final PL - UndergroundPassView ↗
07/23/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
10/15/2026Post-installed AnchorsZELJKO STEVANOVICspecial
10/07/2026Post-installed AnchorsZELJKO STEVANOVICspecial
08/31/2026Post-installed AnchorsBRIAN T. O'CONNORspecial
08/31/2026Alternative Materials - OTCR Buildings Bulletin NumberBRIAN T. O'CONNORspecial
08/10/2026Wall Panels, Curtain Walls, and VeneersALEXIS SCHLESSINGERMANspecial
08/10/2026Luminous Exit Path MarkingsShahrish Shuvospecial
08/10/2026Fenestration areasShahrish Shuvoenergy_progress
08/10/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
08/10/2026Protection of exposed foundation insulationShahrish Shuvoenergy_progress
08/10/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
08/10/2026Air barrier continuity plan testingShahrish Shuvoenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/10/2026Fenestration air leakageShahrish Shuvoenergy_progress
08/10/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
08/10/2026VestibulesShahrish Shuvoenergy_progress
08/10/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
08/05/2026Alternative Materials - OTCR Buildings Bulletin NumberBRIAN T. O'CONNORspecial
08/05/2026Post-installed AnchorsBRIAN T. O'CONNORspecial
07/22/2026Air barrier - visual inspectionShahrish Shuvoenergy_progress
07/22/2026Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
07/22/2026Air barrier continuity plan testingShahrish Shuvoenergy_progress
07/22/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
07/22/2026Fenestration areasShahrish Shuvoenergy_progress
07/22/2026VestibulesShahrish Shuvoenergy_progress
07/22/2026Insulation placement and R valuesShahrish Shuvoenergy_progress
Latest 25 of 119.
▾Documents — 295 on file (BIS + DOB NOW)
▸Plans & Drawings64
▸DOB NOWPlans/Sketch64
08/27/2026M00985671-I1Request digital key ↗
08/26/2026M00985380-S1Request digital key ↗
08/26/2026M00985380-P1Request digital key ↗
Showing 3 of 64 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
12/10/2024141026253Open ↗
08/20/2024141026253Open ↗
07/23/2015140380139Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/20/2024141026253Open ↗
▸BISWORK PERMIT APPLICATION1
07/23/2015140380139Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram7
08/22/2026M01062289-A1Open ↗
08/19/2026M01062289-P9Open ↗
08/19/2026M01062289-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/22/2026M01062289-A1Open ↗
08/19/2026M01062289-P9Open ↗
08/19/2026M01062289-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications138
▸DOB NOWDPL-1: Design Professional Seal & Signature67
10/17/2026M01355058-P5Open ↗
10/14/2026M01210503-P5Open ↗
10/14/2026M01435891-P2Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature46
10/17/2026M01355058-P5Open ↗
10/14/2026M01435891-P2Open ↗
10/14/2026M01435891-P1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M01062289-P3Open ↗
08/31/2026M01062289-S2Open ↗
08/31/2026M01062289-P6Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/20/2024141026253Open ↗
07/23/2015140380139Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
08/20/2024141026253Open ↗
08/20/2024141026253Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/23/2015140380139Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/23/2015140380139Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWElectric Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/22/2026M01062289-A1Open ↗
08/19/2026M01062289-P9Open ↗
08/19/2026M01062289-P7Open ↗
Showing 3 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/20/2024141026253Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026M00985380-I1Open ↗
08/26/2026M00985380-P3Open ↗
08/26/2026M00985380-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/23/2015140380139Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/23/2015140380139Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/23/2015140380139Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/27/2026M00985671-I1Open ↗
08/26/2026M00985380-S1Open ↗
08/19/2026M01210523-P4Open ↗
Showing 3 of 12 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/23/2015140380139Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
08/20/2024141026253Open ↗
07/23/2015140380139Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents31
▸DOB NOWProperty Ownership Certification9
08/22/2026M01062289-A1Open ↗
08/19/2026M01062289-P7Open ↗
08/19/2026M01062289-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/22/2026M01062289-A1Open ↗
08/19/2026M01062289-P9Open ↗
08/19/2026M01062289-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/22/2026M01062289-A1Open ↗
08/19/2026M01062289-P9Open ↗
08/19/2026M01062289-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStructure Photographs4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWCalculations2
10/17/2026M01355058-P5Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
10/17/2026M01355058-P5Open ↗
Showing 1 of 2 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/20/2024141026253Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type