← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
38 WEST 26TH STREET
MANHATTAN · BIN 1015631
💬 Discuss this project
1909Year Built
12Stories
D0Building Class
M1-8A/R11Zoning
65,150 sfGross Floor Area
18Units
LL97 CoveredRent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator co-op, conversion from loft/warehouse · Owner of record: 12 Lofts Realty · 5,925 sf lot · 11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofChiller ReplacementUnder Construction16p · 6 filings · 20 docs
Floor 12Unit PH12Under Construction14p · 3 filings · 20 docs
Floor 11Unit 11B49p · 1 filing · 20 docs
Floor 10Unit 10B1p · 1 filing · 6 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Unit 5A, Unit 5B11p · 3 filings · 19 docs
Floor 4
Floor 3
Floor 2Plumbing installation and demolition, 2nd floor33p · 3 filings · 20 docs
Floor 1Mechanical system modifications27p · 4 filings · 20 docs
CellarMechanical system modifications31p · 4 filings · 20 docs
Site & exteriorMasonry facade repairsUnder Construction9p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
12 Lofts Realty8103/22/2026
Bhasin Properties2007/08/2026
Pentagram Design1407/08/2026
Gerard J Picaso803/21/2026
Brown, Harris, Stevens110/04/2026
DK103/22/2026
APT103/21/2026
CCS Architecture NY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Anzalone Architecture1403/21/2026
Agouti Construction Consulting503/21/2026
Building Brothers203/21/2026
Saro Gumusyan Architecture1103/21/2026
Municipal Building Consultants403/21/2026
KM Associates of New York803/21/2026
Kma Designs203/21/2026
AE Design Solution203/21/2026
PS Engineers203/21/2026
K & M Associates803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SC Contracting ManagementGeneral Contractor807/08/2026
K.J. Remodeling of NY Co*General Contractor607/08/2026
Everest ScaffoldingScaffold607/08/2026
Z-Dar ContractingGeneral Contractor407/08/2026
Boris Prime RenovationGeneral Contractor407/08/2026
Apollo Electric USAElectrical303/21/2026
GJ PlumbingPlumbing307/08/2026
Four Streets Cool AirGeneral Contractor303/21/2026
Five Star P & H CoFire Protection207/08/2026
Five Star P and H CoPlumbing207/08/2026
Scientific Electric CoElectrical203/21/2026
Gary ElectricElectrical203/21/2026
TVS MechanicalFire Protection207/08/2026
Orbit SprinklerFire Protection207/08/2026
R & S Plumbing & HeatingPlumbing207/08/2026
Tribute Restorationspecialty_contractor104/09/2026
Inner City Electrical ContractorsElectrical103/21/2026
R & L SystemsElectrical103/21/2026
Y.S. ElectricElectrical103/21/2026
Pawlowski EnterprisesGeneral Contractor107/08/2026
Thermal Kinetic SolutionsGeneral Contractor109/22/2026
Apollo Electric USAElectrical103/22/2026
Kings Group NYScaffold104/09/2026
Accurate MechanicalPlumbing107/08/2026
Brook Plumbing & HeatingPlumbing107/08/2026
Raptor MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE+CONSTRUCTION1326809/09/2026
Konoski Engineering9111309/09/2026
MG New York Architects, P3444108/14/2026
Piro Studio7503108/14/2026
Steve E. Blatz Architect3634211/21/2025
Integrity Consulting Service666511/21/2025
Sag Engineering & Consulting608110/15/2025
Seth P Roye Architect8554110/15/2025
Jack Green Associates422205/21/2025
Robert Papazian Architect3491103/20/2024
Murdock Solon Architects3342106/09/2023
Saro Gumusyan Architect64371103/08/2023
Cthree Architecture + Des1124208/10/2022
Startech Engineering1041102/15/2022
Architectural Engineering6111206/30/2021
Building Lifecycle
All (246)Filed (44)Permit Issued (41)Signed Off (16)Facade (FISP) (14)Violation (60)Inspection (17)Objection (24)Special Inspection (30)
10/19/2026
Signed off — Alteration
Installation of (2) new air cooled chiller units on the 12th floor roof.
M01429248-I1
09/21/2026
Permit issued — Mechanical Systems
M01429248-I1-MS
09/09/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT PH12 ON THE 12TH FLOOR. MODIFY EXISTING SPRINKLER SYSTEM FOR NEW APARTMENT LAYOUT. INSTALL SPRINKLER HEADS AND PIPING. INSTALL SPRINKLER HEADS AT STAIR BULKHEAD.
M01202180-P3
09/03/2026
Special inspection requirement — Sprinkler Systems
christopher konoski
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
08/14/2026
Filed — Alteration
Installation of (2) new air cooled chiller units on the 12th floor roof.
M01429248-I1
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
08/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joshua Pulver
08/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joshua Pulver
08/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joshua Pulver
08/06/2026
Special inspection requirement — Maintenance information
Joshua Pulver
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
08/03/2026
Filed — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT PH12 ON THE 12TH FLOOR. MODIFY EXISTING SPRINKLER SYSTEM FOR NEW APARTMENT LAYOUT. INSTALL SPRINKLER HEADS AND PIPING. INSTALL SPRINKLER HEADS AT STAIR BULKHEAD.
M01202180-P2
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
07/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
07/10/2026
Special inspection requirement — Final
PIETRO ROSATO
07/10/2026
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
07/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
06/18/2026
Signed off — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT PH12 ON THE 12TH FLOOR. MODIFY EXISTING SPRINKLER SYSTEM FOR NEW APARTMENT LAYOUT. INSTALL SPRINKLER HEADS AND PIPING. INSTALL SPRINKLER HEADS AT STAIR BULKHEAD.
M01202180-S1
06/16/2026
Signed off — Alteration
SPRINKLER WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT PH12 ON THE 12TH FLOOR. MODIFY EXISTING SPRINKLER SYSTEM FOR NEW APARTMENT LAYOUT. INSTALL SPRINKLER HEADS AND PIPING. INSTALL SPRINKLER HEADS AT STAIR BULKHEAD.
M01202180-I1
04/06/2026
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01237944-P1
04/02/2026
Permit issued — Mechanical Systems
M01202180-S1-MS
04/02/2026
Permit issued — Plumbing
M01202180-S2-PL
04/02/2026
Permit issued — Sprinklers
M01202180-S3-EW-SP
04/02/2026
Permit issued — General Construction
M01202180-I1-GC
02/27/2026
Violation issued (ECB, open)
Construction
02/18/2026
Signed off — Alteration
MODIFICATIONS TO MECHANICAL SYSTEM OF EXISTING EATING AND DRINKING ESTABLISHMENT AT 1ST FLOOR AND CELLAR
M00645078-I1
02/17/2026
Signed off — Alteration
REMOVAL, ALTERATION, AND INSTALLATION OF NEW PLUMBING FIXTURES AT EXISTING EATING AND DRINKING ESTABLISHMENT AT 1ST FLOOR AND CELLAR
M00672787-I1
02/11/2026
Signed off — Alteration
plumbing and sprinkler work file in conjunction with apartment 11B renovation as per plans filed herewith.
M01064926-I1
02/09/2026
Signed off — Alteration
plumbing and sprinkler work file in conjunction with apartment 11B renovation as per plans filed herewith.
M01064926-S2
02/09/2026
Signed off — Alteration
plumbing and sprinkler work file in conjunction with apartment 11B renovation as per plans filed herewith.
M01064926-S1
01/07/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Special inspection requirement — Lighting in dwelling units
Stephen Blatz
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
Stephen Blatz
11/25/2025
Special inspection requirement — Final
Stephen Blatz
11/25/2025
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
11/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Blatz
11/21/2025
Filed — Alteration
plumbing and sprinkler work file in conjunction with apartment 11B renovation as per plans filed herewith.
M01064926-P1
11/17/2025
Violation issued (HPD, closed)
I
10/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2025
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
10/30/2025
Permit issued — General Construction
M01155048-I1-GC
10/29/2025
Objection resolved — Addressed
10/23/2025
Permit issued — Sidewalk Shed
M01305122-I1-SH
10/22/2025
Filed — Alteration
plumbing and sprinkler work file in conjunction with apartment 11B renovation as per plans filed herewith.
M01064926-P2
10/21/2025
Objection resolved — Addressed
10/20/2025
Filed — Alteration
M01305122-I1
10/17/2025
Permit issued — Plumbing
M01064926-S1-PL
10/15/2025
Filed — Alteration
Masonry facade repairs, as per drawings. No change to use, occupancy, or egress.
M01155048-I1
10/14/2025
Permit issued — General Construction
M01064926-I1-GC
10/14/2025
Permit issued — Mechanical Systems
M01064926-S2-MS
10/02/2025
Permit issued — Suspended Scaffold
M01237944-I1-SC
09/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2025
Permit issued — Plumbing
M01064926-S1-EW-SP
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offThermal Kinetic Solutions09/21/2026
DOB NOWMechanical SystemsSigned-offZ-Dar Contracting04/02/2026
DOB NOWPlumbingPermit IssuedFive Star P and H Co04/02/2026
DOB NOWSprinklersPermit IssuedFive Star P & H Co04/02/2026
DOB NOWGeneral ConstructionSigned-offZ-Dar Contracting04/02/2026
DOB NOWGeneral ConstructionPermit IssuedTribute Restoration10/30/2025
DOB NOWSidewalk ShedPermit IssuedKings Group NY10/23/2025
DOB NOWPlumbingSigned-offR & S Plumbing & Heating10/17/2025
DOB NOWGeneral ConstructionSigned-offK.J. Remodeling of NY Co*10/14/2025
DOB NOWMechanical SystemsSigned-offK.J. Remodeling of NY Co*10/14/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration10/02/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler09/18/2025
DOB NOWSuspended ScaffoldPermit IssuedTribute Restoration06/13/2025
DOB NOWPlumbingPermit IssuedFive Star P and H Co05/02/2025
DOB NOWSprinklersPermit IssuedFive Star P & H Co05/02/2025
DOB NOWMechanical SystemsSigned-offZ-Dar Contracting04/29/2025
DOB NOWGeneral ConstructionSigned-offZ-Dar Contracting04/29/2025
DOB NOWSprinklersSigned-offOrbit Sprinkler10/16/2024
DOB NOWPlumbingSigned-offR & S Plumbing & Heating10/15/2024
DOB NOWGeneral ConstructionSigned-offK.J. Remodeling of NY Co*10/15/2024
DOB NOWMechanical SystemsSigned-offK.J. Remodeling of NY Co*10/11/2024
DOB NOWGeneral ConstructionSigned-offPawlowski Enterprises04/05/2024
DOB NOWPlumbingSigned-offBrook Plumbing & Heating01/08/2024
DOB NOWMechanical SystemsSigned-offBoris Prime Renovation12/20/2023
DOB NOWGeneral ConstructionSigned-offBoris Prime Renovation12/13/2023
DOB NOWMechanical SystemsSigned-offSC Contracting Management11/10/2022
DOB NOWPlumbingSigned-offAnthony Disabato10/14/2022
DOB NOWPlumbingSigned-offTVS Mechanical09/30/2022
DOB NOWGeneral ConstructionSigned-offSC Contracting Management06/29/2022
DOB NOWGeneral ConstructionSigned-offSC Contracting Management06/24/2022
DOB NOWPlumbingSigned-offRaptor Mechanical02/10/2022
DOB NOWGeneral ConstructionSigned-offSC Contracting Management12/20/2021
DOB NOWPlumbingSigned-offTVS Mechanical05/05/2021
DOB NOWSprinklersSigned-offTVS Mechanical05/04/2021
DOB NOWMechanical SystemsSigned-offFour Streets Cool Air03/30/2021
DOB NOWSprinklersSigned-offTVS Mechanical10/28/2020
DOB NOWPlumbingSigned-offTVS Mechanical10/02/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/26/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding07/25/2018
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/29/2018
+ 51 more permits on file
3 projects · most recent 09/09/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2026Signed-offZ-Dar ContractingAir Conditioning Systems, Ventilation Systems
Cooling
Trane 5HPL5060A1000A 60,000 BTU · Condensing Unit ×2
5HPL5060A100A 60,000 BTU · Condensing Unit ×1
Ventilation
Panasonic FV-05-11VK1 80 CFM · Exhaust Fan ×4
08/14/2026Signed-offThermal Kinetic SolutionsHeating and Air Conditioning Systems
Heat / Cool
Multiaqua MAC-060-HE-0132L 1,990 CFM · Chiller ×2
05/21/2025Signed-offBoris Prime RenovationHeating and Air Conditioning Systems
Heat / Cool
Samsung AM036ANHDCH 36,000 BTU · Vrf Indoor ×2
AM036TNZDCH 36,000 BTU · Vrf Indoor ×2
AM060MXMDCH 60,000 BTU · Vrf Indoor ×2
1 project · most recent 09/09/2026
Sprinkler System
FiledStatusContractorScope
09/09/2026Permit IssuedFive Star P & H CoSprinkler System
1 project · most recent 09/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/09/2026Permit IssuedFive Star P and H CoGas, Water/Sanitary
12 projects · most recent 11/21/2025
General Wiring
FiledStatusContractorScope
11/21/2025CompleteApollo Electric USAGeneral Wiring
10/23/2025Permit IssuedHigh Quality Electric of NYC—
05/01/2025Permit IssuedEis Electric Corp DbaGeneral Wiring
10/08/2024CompleteApollo Electric USA—
09/13/2024CompleteStan ElectricGeneral Wiring
08/19/2024CompleteI&E ElectricGeneral Wiring
02/09/2022Permit IssuedRobert Chimenti21 meters, 1 new_meters
02/08/2022Permit IssuedProton Electric & Sec SystemsGeneral Wiring
03/31/2021CompleteAV Group ElectricalGeneral Wiring
09/28/2020CancelledEvs ElectricGeneral Wiring
04/27/2018CompleteApollo Electric—
02/07/2018CompleteBorowide Elect'l Contractors—
1 project · most recent 08/06/2025
Steel
FiledStatusContractorScope
08/06/2025——Steel
1 project · most recent 04/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/06/2026Permit IssuedTribute RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
01/07/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/03/2026Sprinkler Systemschristopher konoskispecial
09/03/2026Fire-Resistant Penetrations and JointsJoshua Pulverspecial
08/06/2026Maintenance informationJoshua Pulverenergy_progress
08/06/2026HVAC-R and service water heating equipmentJoshua Pulverenergy_progress
08/06/2026HVAC-R and service water piping design and insulationJoshua Pulverenergy_progress
08/06/2026Energy Code Compliance InspectionsJoshua Pulverprogress
08/06/2026HVAC-R and service water heating system controlsJoshua Pulverenergy_progress
08/06/2026Fire-Resistant Penetrations and JointsJoshua Pulverspecial
07/20/2026Tenant Protection Plan Compliance—special
07/10/2026HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
07/10/2026HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
07/10/2026FinalPIETRO ROSATOprogress
07/10/2026Energy Code Compliance InspectionsPIETRO ROSATOprogress
07/10/2026Mechanical SystemsPIETRO ROSATOspecial
07/10/2026HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
11/25/2025Lighting in dwelling unitsStephen Blatzenergy_progress
11/25/2025Energy Code Compliance InspectionsStephen Blatzprogress
11/25/2025FinalStephen Blatzprogress
11/25/2025Post-installed AnchorsALEKSANDR LEVINspecial
11/25/2025Fire-Resistant Penetrations and JointsStephen Blatzspecial
10/31/2025Sprinkler SystemsALEKSANDR LEVINspecial
08/18/2025Sprinkler Systemschristopher konoskispecial
08/18/2025Fire-Resistant Penetrations and JointsJoshua Pulverspecial
08/04/2025Structural Steel - High Strength Bolting—special
08/04/2025Structural Steel - Details—special
Latest 25 of 150.
▾Documents — 751 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch28
09/06/2026M00017232-I1Request digital key ↗
09/03/2026M00625116-I1Request digital key ↗
09/03/2026M00625116-P1Request digital key ↗
Showing 3 of 28 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/01/2026M00395076-I1Request digital key ↗
09/01/2026M00395076-P4Request digital key ↗
09/01/2026M00395076-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00395502-I1Request digital key ↗
09/04/2026M00395502-P2Request digital key ↗
09/04/2026M00395502-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/01/2026M00791154-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/03/2026M00395499-P1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits113
▸BISPLAN / WORK APPROVAL APPLICATION56
10/12/2022140920154Open ↗
10/26/2021123875887Open ↗
08/31/2021123875887Open ↗
Showing 3 of 56 on file for this type
▸BISWORK PERMIT APPLICATION49
10/27/2021123875887Open ↗
04/07/2021140920154Open ↗
03/16/2021123875896Open ↗
Showing 3 of 49 on file for this type
▸BISPLACE OF ASSEMBLY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/09/2015120860443Open ↗
12/09/2015120860443Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/24/2013121329669Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications256
▸DOB NOWProgress Inspector Seal & Signature79
09/28/2026M00395076-P5Open ↗
09/28/2026M00395076-P5Open ↗
09/02/2026M01202180-S2Open ↗
Showing 3 of 79 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
03/23/2020123875896Open ↗
03/23/2020123875887Open ↗
12/26/2019123166484Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
10/04/2026M01202180-P3Open ↗
09/06/2026M00017232-I1Open ↗
09/04/2026M00395502-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
10/04/2026M01202180-P3Open ↗
10/04/2026M01202180-P3Open ↗
09/28/2026M00395076-P5Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
03/23/2020123875896Open ↗
03/23/2020123875887Open ↗
02/24/2016120860443Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/23/2020123875896Open ↗
03/23/2020123875887Open ↗
▸BISApplicant / Owner Signature2
03/13/2014140166308Open ↗
07/13/2020140920154Open ↗
▸Trade Schedules & Equipment61
▸BISSCHEDULE B - PLUMBING30
03/07/2017140166308Open ↗
03/01/2017140166308Open ↗
02/23/2017140166308Open ↗
Showing 3 of 30 on file for this type
▸BISSELF-CERT PLUMBING NOTICE26
03/23/2015110252057Open ↗
03/23/2015110252057Open ↗
09/04/2014140166308Open ↗
Showing 3 of 26 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
03/23/2015110252057Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
08/29/2013121511024Open ↗
06/24/2013121329669Open ↗
▸Safety & Tenant Protection21
▸DOB NOWTenant Protection Plan11
09/04/2026M00395502-P2Open ↗
09/04/2026M00395502-I1Open ↗
09/04/2026M00395502-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTenant Protection Plan and Notes4
07/13/2020140920154Open ↗
03/23/2020123875896Open ↗
03/23/2020123875887Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDS1-Demolition Submittal Certification Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
10/04/2026M01202180-P3Open ↗
09/04/2026M00395502-P2Open ↗
09/04/2026M00395502-I1Open ↗
Showing 3 of 34 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
07/13/2020140920154Open ↗
03/23/2020123875896Open ↗
12/26/2019123166484Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/19/2021123875887Open ↗
09/17/2018123166484Open ↗
Showing 2 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
03/13/2014140166308Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/23/2020123875896Open ↗
03/23/2020123875887Open ↗
12/26/2019123166484Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
12/12/2022140920154Open ↗
04/15/2022123875896Open ↗
12/26/2019123166484Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections3
04/29/2014140166308Open ↗
07/30/2013121329669Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/12/2022140920154Open ↗
04/15/2022123875896Open ↗
07/13/2020140920154Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
09/02/2026M00645078-I1Open ↗
09/03/2026M00625116-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/12/2022140920154Open ↗
11/15/2022140920154Open ↗
10/26/2022140920154Open ↗
Showing 3 of 10 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/15/2019121329669Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/15/2022123875896Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
01/09/2023140920154Open ↗
04/25/2022123875896Open ↗
08/18/2020121329669Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/24/2016120860443Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE2
07/02/2013121329669Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
04/15/2022123875896Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT39
12/12/2022140920154Open ↗
04/15/2022123875896Open ↗
07/13/2020140920154Open ↗
Showing 3 of 39 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
02/24/2016120860443Open ↗
Showing 1 of 3 on file for this type
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION19
11/28/2022140920154Open ↗
10/26/2021123875887Open ↗
12/22/2016140166308Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET17
03/23/2020123875896Open ↗
03/23/2020123875887Open ↗
12/26/2017123166484Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM7
02/21/2020121329669Open ↗
12/26/2019123166484Open ↗
12/23/2019123166484Open ↗
Showing 3 of 7 on file for this type
▸BISeFiling Job Application Cover Sheet7
07/13/2020140920154Open ↗
03/13/2014140166308Open ↗
Showing 2 of 7 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/08/2013121329669Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWManufacturer's Specifications3
08/23/2026M01237944-P1Open ↗
08/23/2026M01237944-I1Open ↗
Showing 2 of 3 on file for this type
▸BISLOFT BOARD CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
08/23/2026M01237944-P1Open ↗
Showing 1 of 2 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLoft Board Certificate1
09/06/2026M00017232-I1Open ↗