| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01041163 ↗ | 9 EAST 81 STREET MANHATTAN | Alteration | Permit Issued | 08/23/2024 | 09/29/2026 | Design SARO GUMUSYAN ARCHITECTURE Contractor THINK CONSTRUCTION LLC | STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH ALTERATION OF EXISTING 1-FAMILY DWELLING |
| M01441307 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/17/2026 | 09/17/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor A&A PLUMBING CORP Filer GARO GUMUSYAN | AT 27TH FLOOR NORTH TENANT SPACE, INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPA… |
| M01409338 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR, INSTALLATION OF 2-HOUR RATED DEMISING PARTITIONS FOR TENANT SPACES AND ELEVATOR CORRIDOR AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01430493 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/30/2026 | 09/16/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 27TH FLOOR SOUTH TENANT SPACE AND SHARED CORRIDOR, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO … |
| M01430495 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 09/16/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor A&A PLUMBING CORP Filer GARO GUMUSYAN | AT 27TH FLOOR SOUTH TENANT SPACE AND SHARED CORRIDOR, INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO C… |
| M01441305 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/16/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 27TH FLOOR NORTH TENANT SPACE, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUP… |
| Name | Projects together | Most recent |
|---|---|---|
| GARO GUMUSYAN | 137 | 08/12/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 112 | 12/01/2025 |
| SARO GUMUSYAN ARCHITECTURE | 50 | 08/05/2026 |
| M.A. RUBIANO, P.E., P.C. | 36 | 08/14/2026 |
| MG ENGINEERING D.P.C. | 25 | 02/18/2026 |
| AMA CONSULTING ENGINEERS, PC | 18 | 08/20/2026 |
| VOCON | 5 | 10/07/2025 |
| RYAN SOAMES ENGINEERING | 3 | 03/08/2023 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 2 | 08/02/2021 |
| TPG ARCHITECTURE, LLP | 2 | 10/08/2025 |
| AZ PROFESSIONAL ENGINEERING PC | 1 | 07/08/2025 |
| BADALY ENGINEERING PLLC | 1 | 03/25/2026 |
| COLOMBO ARCHITECTURAL STUDIO PC | 1 | 04/12/2021 |
| CONCORD CONSULTING ENGINEERING PC | 1 | 02/09/2026 |
| DIAZ ARCHITECTS INC.,PA | 1 | 05/18/2023 |
| Guth DeConzo Consulting Engineers | 1 | 08/14/2023 |
| HOK | 1 | 10/09/2025 |
| JANKO RASIC ARCHITECTS, PLLC | 1 | 07/30/2024 |
| METHOD ARCHITECTS PLLC | 1 | 04/21/2021 |
| MONTROY DEMARCO ARCHITECTURE, LLP | 1 | 08/31/2022 |
| OTJ ARCHITECTS | 1 | 09/09/2021 |
| RIP CONSTRUCTION CONSULTANTS | 1 | 02/22/2023 |
| SOYU ARCHITECTURE, INC. | 1 | 07/24/2025 |
| TIMOTHY J. MIRON ARCHITECT PLLC | 1 | 12/10/2025 |
| WAVIC ENGINEERING PLLC | 1 | 06/27/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| PRIME CONSTRUCTION MGMT | 62 | 07/13/2026 |
| TRI-STAR CONSTRUCTION COR | 34 | 08/12/2026 |
| SEAN COAKLEY P & H INC | 28 | 11/12/2025 |
| TULLA CONTRACTING CORP | 15 | 06/24/2025 |
| JRM CONSTRUCTION MGMT LLC | 12 | 05/11/2026 |
| INNER GAZE FURNITURE | 9 | 03/30/2026 |
| INTERSTATE INTERIORS INC | 9 | 05/24/2022 |
| UNIVERSAL CONTRACTING OF | 9 | 10/09/2024 |
| AZM HOME IMPROVEMENTS INC | 8 | 02/09/2026 |
| F1 MECHANICAL INC | 8 | 07/28/2022 |
| A&A PLUMBING CORP | 7 | 08/17/2026 |
| LOTUS METROPOLITAN CONSTR | 7 | 11/11/2025 |
| STRUCTURE TONE, LLC | 7 | 08/20/2026 |
| CELTIC CRAFTS CONSTRUCTIO | 6 | 11/01/2024 |
| MACREDDIN PLBG & HTG INC | 6 | 07/28/2025 |
| RJB CONTRACTING CARTING C | 6 | 09/07/2023 |
| SIGNAL USA LLC | 6 | 01/14/2025 |
| THE PLUMBER'S SHOP & ASSO | 6 | 09/08/2022 |
| ACCURATE MECHANICAL INC | 5 | 11/04/2024 |
| ARCH PLUMBING & HTNG CORP | 5 | 02/20/2025 |
| FRANKIE PLBG & HTG L.L.C | 5 | 06/24/2025 |
| GREGG NY PLUMBING, INC | 5 | 01/31/2024 |
| A PLUS PLUMBING CORP | 4 | 05/15/2026 |
| HAMILTON AIR COMPANY, INC | 4 | 08/16/2023 |
| HARLAND MECHANICAL INC | 4 | 05/24/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| 99 PARK AVENUE ASSOCIATES LP | 93 | 08/12/2026 |
| 1250 BROADWAY ASSOCIATES LLC | 51 | 08/20/2026 |
| 875 3RD AVENUE LLC | 32 | 02/18/2026 |
| 410 PARK AVENUE ASSOCIATES LLP | 28 | 12/18/2023 |
| 545 8TH AVENUE ASSOCIATES, LLC | 14 | 10/28/2025 |
| 1250 BROADWAY ASSOCIATES LLPC | 6 | 04/10/2026 |
| ASTOR TERRACE CONDOMINIUM | 4 | 10/08/2024 |
| AKAM ASSOCIATES, INC. | 3 | 07/21/2026 |
| GLOBAL HOLDINGS | 3 | 10/14/2025 |
| SL GREEN REALTY CORP | 3 | 08/05/2026 |
| 120 PARK AVENUE ASSOCIATES LLC | 2 | 02/12/2025 |
| 9 BARROW OWNERS CORP. | 2 | 07/11/2022 |
| 300 CPW APARTMENTS CORP. | 1 | 08/04/2021 |
| 466 TENANTS CORP. | 1 | 04/10/2024 |
| CHARLES H. GREENTHAL MANAGEMENT\ | 1 | 01/17/2024 |
| EAST 117 STREET ASSOCIATES LTD | 1 | 08/14/2023 |
| EXCELSIOR 57 CORP | 1 | 04/22/2025 |
| FIRST SERVICE RESIDENTIAL | 1 | 12/05/2023 |
| PH20 WEST 53RD LLC | 1 | 03/30/2026 |
| PLAZA 400 OWNERS CORP. | 1 | 12/13/2022 |
| RUDD REALTY MGMT CORP. | 1 | 04/05/2021 |
| SSY Tea LLC | 1 | 04/20/2026 |
| STEWART TENANTS CORP | 1 | 07/22/2022 |
| TRUMP WORLD TOWER | 1 | 09/09/2025 |
| TULIP REAL PROPERTIES LLC | 1 | 03/15/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| GARO GUMUSYAN | 160 | 08/20/2026 |
| LMS-ACE SERVICES | 77 | 01/06/2026 |
| SARO GUMUSYAN ARCHITECTURE | 25 | 08/12/2026 |
| RIP CC INC | 3 | 07/08/2025 |
| RIZZO GROUP | 3 | 08/05/2026 |
| ARCHITECTAM | 1 | 04/20/2026 |
| NYC DESIGN FILE | 1 | 06/27/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01041163 ↗ | 9 EAST 81 STREET MANHATTAN | Alteration | Permit Issued | 08/23/2024 | 09/29/2026 | Design SARO GUMUSYAN ARCHITECTURE Contractor THINK CONSTRUCTION LLC | STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH ALTERATION OF EXISTING 1-FAMILY DWELLING |
| M01441307 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/17/2026 | 09/17/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor A&A PLUMBING CORP Filer GARO GUMUSYAN | AT 27TH FLOOR NORTH TENANT SPACE, INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPA… |
| M01409338 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR, INSTALLATION OF 2-HOUR RATED DEMISING PARTITIONS FOR TENANT SPACES AND ELEVATOR CORRIDOR AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01430493 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/30/2026 | 09/16/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 27TH FLOOR SOUTH TENANT SPACE AND SHARED CORRIDOR, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO … |
| M01430495 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/29/2026 | 09/16/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor A&A PLUMBING CORP Filer GARO GUMUSYAN | AT 27TH FLOOR SOUTH TENANT SPACE AND SHARED CORRIDOR, INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO C… |
| M01441305 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/20/2026 | 09/16/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 27TH FLOOR NORTH TENANT SPACE, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUP… |
| Q01379107 ↗ | 37-11 UNION STREET QUEENS | Alteration | Signed-off | 04/20/2026 | 09/15/2026 | Design SARO GUMUSYAN ARCHITECTURE Owner SSY TEA LLC Contractor HAPPY HOME CONSTRUCTION C Filer ARCHITECTAM | AT 1ST FLOOR -INTERIOR RENOVATION, REMOVAL OF NON-BEARING PARTITIONS &RELATED ELECTRICAL WORK. No Change in use, egress or occupancy |
| M01441805 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/17/2026 | 09/14/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor A&A PLUMBING CORP Filer GARO GUMUSYAN | AT 35TH FLOOR TENANT SPACE, INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR… |
| M01193832 ↗ | 15 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 05/05/2026 | 09/11/2026 | Design GARO GUMUSYAN Owner AKAM ASSOCIATES, INC. Contractor EDR CONST & MGMT INC | At apartment 12U/12V, removal and installation of interior partitions and finishes as per plans filed here with. No change to use, egress, o… |
| M01411501 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/25/2026 | 07/17/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor JDP MECHANICAL INC Filer GARO GUMUSYAN | AT CELLAR, 1ST, AND 2ND FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF DUCTWORK, PIPING, AND HVAC UNITS AS PER PLANS FILED HEREWITH. NO CHA… |
| M01370496 | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/13/2026 | 07/16/2026 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 23RD FLOOR TERRACE, INSTALLATION OF A PASSIVE RECREATION SPACE IN COMPLIANCE WITH DOB BULLETIN #BB2018-002 AS PER PLANS FILED HEREWITH. N… |
| M01396990 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/15/2026 | 07/13/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor A PLUS PLUMBING CORP Filer GARO GUMUSYAN | AT 1ST FLOOR TENANT SPACE, REMOVAL OF THE EXISTING RESTROOM, PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN … |
| M01368538 ↗ | 20 WEST 53 STREET MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 06/23/2026 | Design SARO GUMUSYAN ARCHITECTURE Owner PH20 WEST 53RD LLC Contractor INNER GAZE FURNITURE | AT PENTHOUSE FLOORS 44 & 45- INTERIOR RENOVATION, INSTALLATION OF NEW DOORS & CABINETS, REPLACEMENT OF INTERIOR STAIR, MODIFICATIONS TO EXTE… |
| M01396985 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/11/2026 | 06/18/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor JRM CONSTRUCTION MGMT LLC Filer GARO GUMUSYAN | AT 1ST FLOOR TENANT SPACE, REMOVAL OF HVAC DUCTWORK, PIPING, CONTROLS, AND AC UNITS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY… |
| M01396973 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/07/2026 | 06/16/2026 | Design GARO GUMUSYAN Contractor JRM CONSTRUCTION MGMT LLC | AT 1ST FLOOR TENANT SPACE, REMOVAL OF EXISTING PARTITIONS, CEILINGS, LIGHTING, AND FINISHES AS PER PLANS FILED HEREWITH. |
| M01355402 ↗ | 340 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 02/18/2026 | 06/03/2026 | Design SARO GUMUSYAN ARCHITECTURE Contractor LAILE INC | AT 9TH FLOOR APT 9E- MODIFICATION OF PLUMBING FIXTURES. |
| M01193837 ↗ | 15 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 05/05/2026 | 05/26/2026 | Design M.A. RUBIANO, P.E., P.C. Owner AKAM ASSOCIATES, INC. Contractor MASTER 2 PLBG & HTG INC Filer GARO GUMUSYAN | At apartment 12U/12V, removal, replacement, and installation of plumbing fixtures and related piping as per plans filed here with. No change… |
| M00984133 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 02/22/2024 | 05/15/2026 | Design GARO GUMUSYAN Contractor BORIS PRIME RENOVATION Filer LMS-ACE SERVICES | AT APARTMENT 20Q, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OC… |
| M00984137 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 02/07/2024 | 05/15/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor BORIS PRIME RENOVATION Filer GARO GUMUSYAN | AT APARTMENT 20Q, INSTALLATION OF CONDENCING UNITS AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01379378 ↗ | 641 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 05/01/2026 | Design SARO GUMUSYAN ARCHITECTURE Contractor CROWN PLUMBING INC | AT 42ND FLOOR APT 42A- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND CEILINGS, WITH RELATED ELECTRICA… |
| M01061183 ↗ | 180 EAST END AVENUE MANHATTAN | Alteration | Signed-off | 07/29/2024 | 04/17/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor STIVAN PLBG & HTG INC Filer GARO GUMUSYAN | AT APARTMENT 5G, REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND CONNECTING PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANC… |
| B01228488 ↗ | 732 HALSEY STREET BROOKLYN | Alteration | Signed-off | 10/15/2025 | 04/01/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor ISLAND INTERIORS DESIGN | INSTALLATION OF NEW AIR CONDITIONING UNITS TO PROVIDE COOLING AND HEATING TO THE BUILDING. |
| B01265258 ↗ | 732 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 10/16/2025 | 03/30/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor BT'S PLUMBING AND HEATING | SCOPE OF WORK: SCOPE OF WORK: INSTALLATION OF PLUMBING FIXTURES AND CONNECTING PIPING AND VALVES FOR ENTIRE BUILDING. |
| M01176300 ↗ | 118 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 02/12/2025 | 03/27/2026 | Design GARO GUMUSYAN Contractor VERSATILE SERVICES LLC Filer LMS-ACE SERVICES | AT 26TH FLOOR TENANT SPACE, REMOVAL OF INTERIOR PARTITIONS AND REMOVAL/RELOCATION OF EXISTING GLASS DOORSAS PER PLANS FILED HEREWITH. NO CHA… |
| M01315571 ↗ | 301 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 11/11/2025 | 03/25/2026 | Design SARO GUMUSYAN ARCHITECTURE Contractor LOTUS METROPOLITAN CONSTR | AT 8TH FLOOR APT 8B- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK. |
| M01261885 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 03/19/2026 | Contractor TRI-STAR CONSTRUCTION COR | AT 2ND FLOOR TENANT SPACE, REMOVAL OF EXISTING DUCTWORK AND ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM INCLUDING NEW UNITS AND RE… |
| M01261911 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 03/19/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor M&T PLBG AND HTG CO., INC Filer GARO GUMUSYAN | AT 5TH FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO PLUMBING SYSTEM INCLUDING NEW FIXTURESD AND RELATED PIPING AS PER PLANS FILED HEREWITH… |
| M01199696 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/22/2025 | 03/17/2026 | Design VOCON Contractor TRI-STAR CONSTRUCTION COR Filer GARO GUMUSYAN | AT 1ST AND 2ND FLOOR, REPLACE EXISTING GLASS CURTAIN WALL SYSTEM WITH NEW AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| M01263144 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 03/17/2026 | Contractor TRI-STAR CONSTRUCTION COR | AT 1ST FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, O… |
| M01340896 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 01/22/2026 | 03/13/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor BEDROCK PLBG. & HTG., INC Filer GARO GUMUSYAN | AT 33RD FLOOR TENANT SPACE, installation of Plumbing piping and fixtures as per plans filed herewith. No change to use, occupancy, or egress… |
| M01261884 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 02/27/2026 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 2ND FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING, AND INTERIOR CONVENIENCE STAIR AS PER PLANS FIL… |
| M01363688 ↗ | 846 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 02/25/2026 | — | Design SARO GUMUSYAN ARCHITECTURE Owner AKAM ASSOCIATES, INC. | — |
| M01261907 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 02/24/2026 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 5TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01340892 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 01/22/2026 | 02/10/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 33RD FLOOR TENANT SPACE, installation of Install of Mechanical ductwork and piping as per plans filed herewith. No change to use, occupan… |
| M01261900 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 02/05/2026 | Contractor TRI-STAR CONSTRUCTION COR | AT 3RD FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM INCLUDING NEW UNITS AND RELATED PIPING AND DUCTWORK AS PER … |
| M01353081 ↗ | 641 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 02/03/2026 | — | Design SARO GUMUSYAN ARCHITECTURE | — |
| M01177377 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 02/20/2025 | 01/29/2026 | Contractor TULLA CONTRACTING CORP Filer GARO GUMUSYAN | AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Existing Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No… |
| M01238403 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/24/2025 | 01/29/2026 | Design GARO GUMUSYAN Contractor TULLA CONTRACTING CORP | AT 27TH FLOOR PUBLIC BATHROOMS, INSTALLATION OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR E… |
| M01238407 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/24/2025 | 01/29/2026 | Contractor TULLA CONTRACTING CORP Filer GARO GUMUSYAN | AT 27TH FLOOR PUBLIC BATHROOMS, Installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occup… |
| M01263147 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 01/29/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor TRI-STAR CONSTRUCTION COR Filer GARO GUMUSYAN | AT 1ST FLOOR TENANT SPACE, REMOVAL OF EXISTING DUCTWORK AND ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM INCLUDING NEW UNITS AND RE… |
| M01061176 ↗ | 180 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 07/30/2024 | 01/27/2026 | Design GARO GUMUSYAN Contractor TECNY GROUP INC Filer LMS-ACE SERVICES | AT APARTMENT 5G, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EG… |
| M01263151 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 01/24/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor M&T PLBG AND HTG CO., INC Filer GARO GUMUSYAN | AT 1ST FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO PLUMBING SYSTEM INCLUDING NEW FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH.… |
| M01279000 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/09/2025 | 01/22/2026 | Design HOK Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 9THFLOOR SOUTH AND 10TH FLOOR ENTIRE TENANT SPACE, REMOVALAND INSTALLATION OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH.… |
| M01299762 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 10/21/2025 | 01/22/2026 | Contractor SEAN COAKLEY P & H INC Filer GARO GUMUSYAN | AT 35th floor tenant space and bathrooms, removal of plumbing lines and fixtures. At bathrooms, Installation of Plumbing Lines and fixtures… |
| M01261887 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 01/21/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor M&T PLBG AND HTG CO., INC Filer GARO GUMUSYAN | AT 1ST AND 2ND FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO PLUMBING SYSTEM INCLUDING NEW FIXTURESD AND RELATED PIPING AS PER PLANS FILED … |
| M01261904 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 01/20/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor M&T PLBG AND HTG CO., INC Filer GARO GUMUSYAN | AT 3RD FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO PLUMBING SYSTEM INCLUDING NEW FIXTURESD AND RELATED PIPING AS PER PLANS FILED HEREWITH… |
| M01299756 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 10/21/2025 | 01/20/2026 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 35TH FLOOR TENANT SPACE AND BATHROOMS, REMOVAL OF INTERIOR PARTITIONS, FINISHES, AND FIXTURES. AT BATHROOMS, INSTALLATION OF NEW PARTITIO… |
| M01299760 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 10/21/2025 | 01/20/2026 | Contractor PRIME CONSTRUCTION MGMT | AT 35th floor tenant space and bathrooms, removal of ductwork. At bathrooms installation of Ductwork, Exhaust Grilles and Diffusers as per p… |
| M01069660 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/25/2024 | 01/14/2026 | Contractor TRI-STAR CONSTRUCTION COR Filer GARO GUMUSYAN | AT SUB CELLAR, CELLAR, 1ST FLOOR MAIN LOBBY, AND 2ND FLOOR, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01261898 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 01/14/2026 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 3RD FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01334915 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 12/20/2025 | 01/14/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor BREFFNI MECHANICAL | AT 13TH FLOOR, INSTALLATION OF 600 TON CHILLER AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCPANCY OR EGRESS. |
| M01155667 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/18/2025 | 01/08/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC Filer LMS-ACE SERVICES | At 10th Floor Entire Tenant Space and Bathrooms, removal of non-bearing Partitions, Hung Ceilings and Floor Finishes; At tenant space, Insta… |
| M01261910 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 01/06/2026 | Design AMA CONSULTING ENGINEERS, PC Contractor TRI-STAR CONSTRUCTION COR Filer GARO GUMUSYAN | AT 5TH FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM INCLUDING NEW UNITS AND RELATED PIPING AND DUCTWORK AS PER … |
| M01300543 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/12/2025 | 12/30/2025 | Design MG ENGINEERING D.P.C. Owner 875 3RD AVENUE LLC Contractor A PLUS PLUMBING CORP Filer GARO GUMUSYAN | AT 6TH AND 7TH FLOOR TENANT SPACE AND HALLWAYS, MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY… |
| M01300539 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/12/2025 | 12/17/2025 | Design MG ENGINEERING D.P.C. Owner 875 3RD AVENUE LLC Contractor JRM CONSTRUCTION MGMT LLC Filer GARO GUMUSYAN | AT 6TH AND 7TH FLOOR TENANT SPACE AND HALLWAYS, MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPAN… |
| M01300533 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/10/2025 | 12/15/2025 | Owner 875 3RD AVENUE LLC Contractor JRM CONSTRUCTION MGMT LLC Filer GARO GUMUSYAN | AT 6TH AND 7TH FLOOR TENANT SPACE AND HALLWAYS, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND FINISHES AS PER PLANS FILED … |
| M01259683 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/01/2025 | 12/02/2025 | Design GARO GUMUSYAN Owner GLOBAL HOLDINGS Contractor JRM CONSTRUCTION MGMT LLC | AT SUBCELLAR, CELLAR, AND 1ST FLOOR, REMOVAL OF EXISTING EXTERIOR STOREFRONT, PARTITIONS, CEILINGS, LIGHTING, AND FINISHES. AT FIRST FLOOR, … |
| M01277040 ↗ | 846 2 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2025 | 12/02/2025 | Design SARO GUMUSYAN ARCHITECTURE Contractor EAST HARLEM BUILDERS LLC | INSTALLATION OF NEW PARTITION & DOOR CREATING NEW BEDROOM TO ADDRESS OATH/ECB VIOLATION 34008032M: WORK WITHOUT A PERMIT. ERECTED A PARTITIO… |
| M00940251 ↗ | 200 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 09/27/2023 | 11/24/2025 | Design SARO GUMUSYAN ARCHITECTURE Contractor MACREDDIN PLBG & HTG INC | AT 25TH FLOOR APT 25A- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK. NO CHAN… |
| M01299607 ↗ | 545 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2025 | 11/24/2025 | Design GARO GUMUSYAN Contractor REVIT GROUP LLC | AT 18TH FLOOR TENANT SPACE #1810, INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, O… |
| M01279007 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/07/2025 | 11/21/2025 | Contractor BLUEWATER PLBG& HTG INC Filer GARO GUMUSYAN | AT 9THFLOOR SOUTH AND AND 10THFLOOR ENTIRE TENANT SPACE, TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR … |
| M01282355 ↗ | 845 UNITED NATIONS PLAZA MANHATTAN | Alteration | Signed-off | 09/09/2025 | 11/20/2025 | Design SARO GUMUSYAN ARCHITECTURE Owner TRUMP WORLD TOWER Contractor AZM HOME IMPROVEMENTS | LEGALIZATION OF APARTMENT COMBINATION, INCLUDING REMOVAL OF 8H KITCHEN & INSTALLATION OF NEW PARTITIONS. |
| M01169863 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/12/2025 | 11/13/2025 | Design SARO GUMUSYAN ARCHITECTURE Contractor INNER GAZE FURNITURE | MODIFICATION TO EXISTING PLUMBING FIXTURES INCLUDING REMOVALS & NEW INSTALLATION. |
| M01279005 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 10/07/2025 | 11/05/2025 | Contractor STRUCTURE TONE, LLC Filer GARO GUMUSYAN | AT 9THFLOOR SOUTH AND AND 10TH FLOOR ENTIRE TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE… |
| M01112729 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 11/01/2024 | 10/27/2025 | Design GARO GUMUSYAN Contractor CELTIC CRAFTS CONSTRUCTIO | AT APARTMENT #18N, REMOVAL AND INSTALLATION OF INTERIOR NONBEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OC… |
| M01139052 ↗ | 447 WEST 18 STREET MANHATTAN | Alteration | Signed-off | 11/25/2024 | 10/22/2025 | Design SARO GUMUSYAN ARCHITECTURE Contractor LOTUS METROPOLITAN CONSTR | AT CELLAR- REMOVAL AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01275511 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/29/2025 | 10/21/2025 | Design MG ENGINEERING D.P.C. Owner 875 3RD AVENUE LLC Contractor A&H EXPRESS PLBG&HTG CORP Filer GARO GUMUSYAN | AT 9TH FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS … |
| M00984139 ↗ | 25 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 02/07/2024 | 10/20/2025 | Design M.A. RUBIANO, P.E., P.C. Contractor A.M.N. CORPORATION Filer GARO GUMUSYAN | AT APARTMENT 20Q, REMOVAL AND INSTALLATION OF EXISTING AND NEW PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE … |
| M01259691 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/04/2025 | 10/15/2025 | Design AMA CONSULTING ENGINEERS, PC Owner GLOBAL HOLDINGS Contractor A PLUS PLUMBING CORP Filer GARO GUMUSYAN | AT SUBCELLAR, REMOVAL OF THE EXISTING ESCALATOR SUMP PUMPS, EXISTING MEN'S AND WOMEN'S RESTROOM PLUMBING FIXTURES, DRINKING FOUNTAIN, THE EX… |
| M01191052 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/02/2025 | 10/14/2025 | Contractor SEAN COAKLEY P & H INC Filer GARO GUMUSYAN | AT 11TH Floor Entire Tenant Space and Bathrooms, Removal of Plumbing Lines and fixtures as per plans filed herewith. No change to use, occup… |
| M01275505 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 10/08/2025 | 10/14/2025 | Design TPG ARCHITECTURE, LLP Owner 875 3RD AVENUE LLC Contractor JRM CONSTRUCTION MGMT LLC Filer GARO GUMUSYAN | AT 9TH FLOOR TENANT SPACE, REMOVAL OF INTERIOR NON BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR ME… |
| M01191049 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/02/2025 | 10/08/2025 | Contractor PRIME CONSTRUCTION MGMT Filer GARO GUMUSYAN | AT 11TH Floor Entire Tenant Space and bathrooms, Removal of Existing Ductwork as per plans filed herewith. No change to use, occupancy, or e… |
| M01191044 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/28/2025 | 10/07/2025 | Contractor PRIME CONSTRUCTION MGMT | AT 11TH Floor Entire Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes as per plans filed here… |
| M01275510 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/29/2025 | 10/03/2025 | Design MG ENGINEERING D.P.C. Owner 875 3RD AVENUE LLC Contractor JRM CONSTRUCTION MGMT LLC Filer GARO GUMUSYAN | AT 9TH FLOOR TENANT SPACE, ADDITIONS/MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEAN… |
| M01259688 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/04/2025 | 10/02/2025 | Design AMA CONSULTING ENGINEERS, PC Owner GLOBAL HOLDINGS Contractor JRM CONSTRUCTION MGMT LLC Filer GARO GUMUSYAN | AT SUBCELLAR, CELLAR, AND 1ST FLOOR, REMOVAL OF HVAC DUCTWORK, PIPING, CONTROLS, AND AC UNITS. INSTALLATION OF NEW AC UNIT AND VENTILATION A… |
| M01243840 ↗ | 207 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/08/2025 | 09/26/2025 | Contractor HYDRAULICS MECHANICAL INC Filer RIP CC INC | INSTALLATION OF PLUMBING FIXTURES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. |
| M01238410 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/24/2025 | 09/23/2025 | Contractor FRANKIE PLBG & HTG L.L.C | AT 27TH FLOOR PUBLIC BATHROOMS, Installation of Plumbing Lines and fixtures as per plans filed herewith. No change to use, occupancy, or eg… |
| M01195942 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 03/24/2025 | 09/12/2025 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 6TH AND 32ND FLOOR TENANT SPACE, REPAIR WORK INCLUDING NEW CEILING, FLOORING, MILLWORK, DOORS, AND FINISHES AS PER PLANS FILED HEREWITH. … |
| M01249725 ↗ | 344 WEST 49 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/10/2025 | — | Design M.A. RUBIANO, P.E., P.C. | — |
| M01235805 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2025 | 09/04/2025 | Contractor SEAN COAKLEY P & H INC | AT 4TH FLOOR NORTH TENANT SPACE, ADDITIONS/MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, O… |
| B01216321 ↗ | 732 HALSEY STREET BROOKLYN | Alteration CO | Permit Issued | 06/20/2025 | 09/02/2025 | Design SARO GUMUSYAN ARCHITECTURE Contractor ISLAND INTERIORS DESIGN | INTERIOR RENOVATION AT CELLAR, 1ST, 2ND & 3RD FLOORS & RELATED ELECTRICAL WORK. ESTABLISH TWO-FAMILY OCCUPANCY. |
| M01235803 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2025 | 08/29/2025 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 4TH FLOOR NORTH TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR … |
| M01227194 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/05/2025 | 08/20/2025 | Contractor AVON PLBG & HTG INC Filer GARO GUMUSYAN | AT 37TH FLOOR TENANT SPACE, Removal and replacement of plumbing lines and fixtures as per plans filed herewith. No change to use, occupancy,… |
| M01231658 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/26/2025 | 08/19/2025 | Design MG ENGINEERING D.P.C. Owner 875 3RD AVENUE LLC Contractor A PLUS PLUMBING CORP Filer GARO GUMUSYAN | AT 1ST FLOOR TENANT SPACE, MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. |
| M01227184 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/05/2025 | 08/18/2025 | Design SOYU ARCHITECTURE, INC. Contractor HD HVAC OF NY INC Filer GARO GUMUSYAN | AT 37th FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPA… |
| M01235804 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2025 | 08/18/2025 | Contractor PRIME CONSTRUCTION MGMT Filer GARO GUMUSYAN | AT 4TH FLOOR NORTH TENANT SPACE, ADDITIONS/MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS,… |
| M01189645 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/01/2025 | 08/12/2025 | Contractor TRI-STAR CONSTRUCTION COR Filer GARO GUMUSYAN | AT CELLAR, 1ST AND 2ND FLOORS, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR MEANS… |
| M01227192 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/05/2025 | 08/12/2025 | Contractor HD HVAC OF NY INC Filer GARO GUMUSYAN | AT 37TH FLOOR TENANT SPACE, removal and Installation of existing ductwork, grilles, and diffusers as per plans filed herewith. No change to … |
| M01239410 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/08/2025 | 08/12/2025 | Design VOCON Contractor TRI-STAR CONSTRUCTION COR Filer GARO GUMUSYAN | AT 1ST AND 2ND FLOOR FACADE, REMOVAL OF EXISTING GLASS CURTAIN WALL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPAN… |
| M01111318 ↗ | 121 GREENE STREET MANHATTAN | Alteration | Signed-off | 10/04/2024 | 08/01/2025 | Design SARO GUMUSYAN ARCHITECTURE Owner SL GREEN REALTY CORP Contractor AZM HOME IMPROVEMENTS Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS ON THE 1ST FLOOR RETAIL SPACE PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01144575 ↗ | 121 GREENE STREET MANHATTAN | Alteration | Signed-off | 03/19/2025 | 08/01/2025 | Owner SL GREEN REALTY CORP Contractor AZM HOME IMPROVEMENTS Filer RIZZO GROUP | Modification to an existing HVAC system to match new tenants fit out |
| M01177378 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 02/20/2025 | 07/22/2025 | Contractor ARCH PLUMBING & HTNG CORP Filer GARO GUMUSYAN | AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Plumbing Lines and fixtures as per plans filed herewith. No change to use, occup… |
| M01069667 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/25/2024 | 07/18/2025 | Contractor UNIVERSAL PLUMBING INC Filer GARO GUMUSYAN | AT 1ST FLOOR MAIN LOBBY AND 2ND FLOOR, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR… |
| M01169598 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/20/2025 | 07/18/2025 | Contractor UNIVERSAL PLUMBING INC Filer GARO GUMUSYAN | AT CELLAR, MODIFICATIONS TO EXISTING AND REMOVAL OF EXISTING PLUMBING PIPING AND FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCC… |
| M01176267 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/26/2025 | 07/18/2025 | Design GARO GUMUSYAN Owner 875 3RD AVENUE LLC Contractor SUMMIT INTERIORS, INC Filer LMS-ACE SERVICES | AT 1ST FLOOR RETAIL STORE, REMOVAL OF INTERIOR NON BEARING PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR ME… |
| M01189649 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/01/2025 | 07/18/2025 | Contractor UNIVERSAL PLUMBING INC Filer GARO GUMUSYAN | AT SUBCELLAR AND CELLAR, ADDITIONS/MODIFICATION TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPA… |
| M01191251 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2025 | 07/18/2025 | Contractor SEAN COAKLEY P & H INC Filer GARO GUMUSYAN | AT 3rd Floor Entire Tenant Space and Bathrooms, Remove and Replace Plumbing Lines and fixtures as per plans filed herewith. No change to use… |
| M01231657 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 06/26/2025 | 07/18/2025 | Design MG ENGINEERING D.P.C. Owner 875 3RD AVENUE LLC Contractor SUMMIT INTERIORS, INC Filer GARO GUMUSYAN | AT 1ST FLOOR TENANT SPACE, MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS… |
| M01211859 ↗ | 1084 2 AVENUE MANHATTAN | Alteration | Permit Issued | 04/22/2025 | 07/14/2025 | Design SARO GUMUSYAN ARCHITECTURE Owner EXCELSIOR 57 CORP Contractor AZM HOME IMPROVEMENTS | INSTALLATION OF NEW DOORS & INTERIOR PARTITIONS. |
| M01243703 ↗ | 207 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/07/2025 | — | Design WID CHAPMAN ARCHITECTS Filer RIP CC INC | — |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/13/2026 | Tenant Protection Plan Compliance | 121 GREENE STREET | — | special |
| 08/12/2026 | Post-installed Anchors | 1240 BROADWAY | Saro Gumusyan | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | 1240 BROADWAY | Saro Gumusyan | special |
| 08/12/2026 | Interior lighting power | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | Maintenance information | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | HVAC-R and service water heating equipment | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | Metering | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | HVAC-R and service water heating system controls | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | Post-installed Anchors | 1240 BROADWAY | Saro Gumusyan | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | 1240 BROADWAY | Saro Gumusyan | special |
| 08/12/2026 | Lighting controls | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | Duct leakage testing, insulation and design | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | 1240 BROADWAY | Saro Gumusyan | special |
| 08/12/2026 | Post-installed Anchors | 1240 BROADWAY | Saro Gumusyan | special |
| 08/05/2026 | Final | 1240 BROADWAY | Saro Gumusyan | progress |
| 08/05/2026 | Mechanical Systems | 1240 BROADWAY | Saro Gumusyan | special |
| 07/29/2026 | Fire-Resistant Penetrations and Joints | 15 WEST 72 STREET | Saro Gumusyan | special |
| 07/14/2026 | Fire-Resistant Penetrations and Joints | 180 EAST END AVENUE | Saro Gumusyan | special |
| 07/14/2026 | Energy Code Compliance Inspections | 180 EAST END AVENUE | Saro Gumusyan | progress |
| 07/14/2026 | Post-installed Anchors | 1240 BROADWAY | Saro Gumusyan | special |
| 07/14/2026 | Mechanical Systems | 1240 BROADWAY | Saro Gumusyan | special |
| 07/14/2026 | Maintenance information | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | HVAC-R and service water heating system controls | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | HVAC-R and service water heating equipment | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | Interior lighting power | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | Duct leakage testing, insulation and design | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | Final | 1240 BROADWAY | Saro Gumusyan | progress |
| 07/14/2026 | Fire-Resistant Penetrations and Joints | 1240 BROADWAY | Saro Gumusyan | special |
| 07/14/2026 | HVAC-R and service water piping design and insulation | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | Metering | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/14/2026 | Lighting controls | 1240 BROADWAY | Saro Gumusyan | energy_progress |
| 07/13/2026 | Fire-Resistant Penetrations and Joints | 15 WEST 72 STREET | Saro Gumusyan | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | 99 PARK AVENUE | Saro Gumusyan | special |
| 07/09/2026 | Post-installed Anchors | 99 PARK AVENUE | Saro Gumusyan | special |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | 99 PARK AVENUE | Saro Gumusyan | special |
| 06/23/2026 | Sprayed fire-resistant materials | 99 PARK AVENUE | Saro Gumusyan | special |
| 06/23/2026 | Final | 99 PARK AVENUE | Saro Gumusyan | progress |
| 06/23/2026 | Fire-Resistance Rated Construction | 99 PARK AVENUE | Saro Gumusyan | progress |
| 06/12/2026 | Fire-Resistant Penetrations and Joints | 641 5 AVENUE | Saro Gumusyan | special |
| 06/04/2026 | HVAC-R and service water piping design and insulation | 99 PARK AVENUE | Saro Gumusyan | energy_progress |
| 06/04/2026 | HVAC-R and service water heating system controls | 99 PARK AVENUE | Saro Gumusyan | energy_progress |
| 06/04/2026 | HVAC-R and service water heating equipment | 99 PARK AVENUE | Saro Gumusyan | energy_progress |
| 06/04/2026 | Maintenance information | 99 PARK AVENUE | Saro Gumusyan | energy_progress |
| 06/04/2026 | Duct leakage testing, insulation and design | 99 PARK AVENUE | Saro Gumusyan | energy_progress |
| 06/03/2026 | Final | 99 PARK AVENUE | Saro Gumusyan | progress |
| 06/03/2026 | Post-installed Anchors | 99 PARK AVENUE | Saro Gumusyan | special |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | 99 PARK AVENUE | Saro Gumusyan | special |
| 06/03/2026 | Mechanical Systems | 99 PARK AVENUE | Saro Gumusyan | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | 641 5 AVENUE | Saro Gumusyan | special |