| Owner | Filings | Most Recent |
|---|---|---|
| LEFRAK | 67 | 10/01/2026 |
| LEFRAK PROPERTY MANAGEMENT | 330 | 07/08/2026 |
| ROCK GROUP NY CORP | 7 | 03/22/2026 |
| LEFRAK SBN LIMITED PARTNERSHIP | 540 | 03/22/2026 |
| CENTRAL PARKING SYSTEMS | 1 | 03/22/2026 |
| MARTIN GROUP NEW YORK | 1 | 03/22/2026 |
| LEFRAK SBN LIMITED | 14 | 03/22/2026 |
| ROCKLEDGE SCAFFOLD CORP | 1 | 03/22/2026 |
| MIDSTATE MANGT CORP | 1 | 03/22/2026 |
| LEFAK SBN LIMITED PARK | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| COSENTINI ASSOCIATES | 99 | 08/26/2026 |
| ROBERT KRUPP | 1 | 08/25/2026 |
| CARLTON ARCHITECTURE,PC | 39 | 08/20/2026 |
| SEVERUD ASSOCIATES | 10 | 07/15/2026 |
| SRA ARCHITECTURE + ENGINEERING, PC | 7 | 05/08/2026 |
| WSP | 16 | 12/16/2025 |
| IDA EXPERIENCE | 1 | 08/01/2025 |
| MG ENGINEERING D.P.C. | 43 | 05/15/2025 |
| TPG ARCHITECTURE, LLP | 1 | 04/21/2025 |
| HATFIELD GROUP ENGINEERING AND ARCH | 2 | 02/04/2025 |
| BRETT RIEGER | 1 | 11/26/2024 |
| ROBERT DERECTOR ASSOCIATES | 21 | 11/20/2024 |
| KOHN PEDERSEN FOX | 1 | 09/12/2024 |
| WALSH ENGINEERING PLLC | 1 | 07/14/2024 |
| RANDALL P. COLLINS ARCHITECT, PC | 1 | 06/03/2024 |
| RICHARD PUSWALD PE | 2 | 04/12/2024 |
| TED MOUDIS ASSOCIATES | 2 | 11/30/2023 |
| STEPHEN WILDER | 3 | 11/08/2023 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 1 | 11/07/2023 |
| SCHRIMMER DESIGN GROUP | 1 | 12/16/2022 |
| HIGHLAND ASSOCIATES | 1 | 10/27/2022 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 10/27/2022 |
| MONTROY ARCHITECTURE PLLC | 1 | 04/08/2022 |
| NEW YORK DESIGN ARCHITECTS, LLP | 2 | 03/10/2022 |
| MR ARCHITECTURE & DECOR | 1 | 02/03/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 174 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 73 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 18 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 1 | 03/21/2026 |
| AE DESIGN SOLUTION | 6 | 03/21/2026 |
| DVA Advisors | 5 | 03/21/2026 |
| NOBU | 4 | 03/21/2026 |
| JULIAN A. GOMEZ | 2 | 03/21/2026 |
| NEW YORK DESIGN ARHICTECTS | 4 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| QUEST BUILDERS GROUP INC | General Contractor | 40 | 07/08/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 25 | 10/01/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 16 | 07/08/2026 |
| JC ELITE CONSTRUCTION SER | General Contractor | 16 | 07/08/2026 |
| FINALY GENL CONTR CORP | General Contractor | 13 | 09/02/2026 |
| ICON INTERIORS INC | General Contractor | 10 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 7 | 07/08/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 7 | 07/08/2026 |
| MILL BROOK FIRE PROTECTION | Fire Protection | 7 | 07/08/2026 |
| SHAWMUT WOODWORKING & SUPPLY | General Contractor | 6 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 6 | 09/03/2026 |
| ROCK GROUP NY CORP | General Contractor | 6 | 03/21/2026 |
| PAR PLUMBING CO., INC | Plumbing | 6 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 5 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 4 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 4 | 07/08/2026 |
| FAIRMONT INDUSTRIES CORP | General Contractor | 4 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 4 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 4 | 07/08/2026 |
| CITY/SUBURBAN PLBG CORP | Plumbing | 4 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 4 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 4 | 03/21/2026 |
| CPM BUILDERS INC | General Contractor | 4 | 04/09/2026 |
| VERUS INC | General Contractor | 4 | 07/08/2026 |
| ADDISON PLBG AND HTG CORP | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TROLYDIA TESTING & INSPEC | 4422 | 129 | 08/26/2026 |
| SRA INSPECTIONS | 3461 | 5 | 05/08/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 7 | 12/16/2025 |
| AK ENGINEERING PC | 678 | 6 | 12/15/2025 |
| SAG ENGINEERING & CONSULT | 608 | 11 | 11/13/2025 |
| SE INSPECTIONS | 7486 | 3 | 02/04/2025 |
| RAND ENGINEERING & ARCHIT | 266 | 1 | 11/26/2024 |
| ALAN MARGOLIN & ASSOC | 423 | 5 | 11/13/2024 |
| MEP INSPECTIONS, INC | 1102 | 14 | 07/25/2024 |
| PCS ENGINEERING | 3745 | 1 | 07/14/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION CORP | 09/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | DENKO MECHANICAL INC | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | FINALY GENL CONTR CORP | 09/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FINALY GENL CONTR CORP | 09/01/2026 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION CORP | 09/01/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FINALY GENL CONTR CORP | 08/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | GO PRO FIRE PROTECTION C | 07/30/2026 |
| DOB NOW | Plumbing | Permit Issued | COMMERICAL PLBG SVCES LLC | 07/28/2026 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION CORP | 07/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TRI-STAR CONSTRUCTION CORP | 07/22/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 06/22/2026 |
| DOB NOW | Structural | Permit Issued | SPECIALTY CONSTRUCTION SY | 04/23/2026 |
| DOB NOW | General Construction | Signed-off | TRI-STAR CONSTRUCTION COR | 02/05/2026 |
| DOB NOW | Plumbing | Permit Issued | MAGIC MECHANICAL INC | 01/23/2026 |
| DOB NOW | General Construction | Permit Issued | MEDCON SERVICES, LLC | 11/13/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L SIGNS, INC | 07/23/2025 |
| DOB NOW | Sprinklers | Signed-off | ARIANA CONTRACTING INC | 07/21/2025 |
| DOB NOW | General Construction | Signed-off | ICON INTERIORS INC | 06/27/2025 |
| DOB NOW | General Construction | Signed-off | JT MAGEN & COMPANY INC | 04/24/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 04/23/2025 |
| DOB NOW | Plumbing | Signed-off | BEDROCK MECHANICAL INC | 04/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 04/21/2025 |
| DOB NOW | Plumbing | Signed-off | COPPER MECHANICAL INC | 03/11/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 02/28/2025 |
| DOB NOW | Structural | Signed-off | MEDCON SERVICES, LLC | 02/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MEDCON SERVICES, LLC | 02/05/2025 |
| DOB NOW | Structural | Signed-off | ROYAL CONCRETE AND MASON* | 02/04/2025 |
| DOB NOW | General Construction | Signed-off | MEDCON SERVICES, LLC | 02/04/2025 |
| DOB NOW | Structural | Signed-off | MILLENIUM RESTORATION CORP | 02/03/2025 |
| DOB NOW | Plumbing | Signed-off | CITY/SUBURBAN PLBG CORP | 01/28/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 01/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | TRI-STAR CONSTRUCTION COR | 01/22/2025 |
| DOB NOW | General Construction | Signed-off | TRI-STAR CONSTRUCTION COR | 01/22/2025 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 01/09/2025 |
| DOB NOW | Sprinklers | Signed-off | PRODIGY PLBG&HTG CORP | 12/19/2024 |
| DOB NOW | Plumbing | Signed-off | PRODIGY PLBG & HTG CORP | 12/19/2024 |
| DOB NOW | General Construction | Signed-off | TRI-STAR CONSTRUCTION COR | 12/19/2024 |
| DOB NOW | Mechanical Systems | Signed-off | FINALY GENL CONTR | 12/10/2024 |
| DOB NOW | General Construction | Signed-off | FINALY GENL CONTR | 12/10/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/26/2026 | Permit Issued | FINALY GENL CONTR CORP | Air Conditioning Systems | Cooling Climatemaster SC-018 600 CFM · Wshp ×1 |
| 11/13/2025 | Permit Issued | TRI-STAR CONSTRUCTION COR | Air Conditioning Systems | Cooling Water Furnace UBH015SR001DBNEN2B32SSK 24,000 BTU · Ahu ×4 UBH030SR001DBNEN2B32SSK 12,000 BTU · Ahu ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | DENKO MECHANICAL INC | — |
| 08/11/2026 | Permit Issued | GO PRO FIRE PROTECTION C | Sprinkler System |
| 11/20/2024 | — | — | — |
| 11/20/2024 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 08/11/2026 | Permit Issued | COMPLETE PLBG SAFETY LLC | Water/Sanitary |
| 06/24/2026 | Permit Issued | MAGIC MECHANICAL INC | Gas |
| 11/20/2024 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | Permit Issued | MRD ELEC'L SERVICES, INC | General Wiring |
| 08/06/2026 | Permit Issued | TROON ELECTRIC OF NEW YOR | — |
| 08/06/2026 | Permit Issued | TROON ELECTRIC OF NEW YOR | — |
| 08/06/2026 | Permit Issued | TROON ELECTRIC OF NEW YOR | — |
| 06/04/2026 | Permit Issued | TROON ELECTRIC OF NEW YOR | General Wiring |
| 03/02/2026 | Complete | HESO ELECTRICAL INC | General Wiring |
| 11/04/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 11/04/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 11/04/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 10/17/2025 | Complete | CROSSWIRE ELECTRICAL INC | General Wiring |
| 07/10/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 02/04/2025 | Complete | AVALON ELECTRIC CORP. | General Wiring |
| 01/22/2025 | Complete | RX ELECTRIC INC | — |
| 01/22/2025 | Permit Issued | RX ELECTRIC INC | General Wiring |
| 01/09/2025 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | TRI-STAR CONSTRUCTION COR | Concrete |
| 07/15/2026 | Permit Issued | SPECIALTY CONSTRUCTION SY | Concrete |
| 05/08/2026 | Permit Issued | CPM BUILDERS INC | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/16/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/09/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/09/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/19/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/06/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/06/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/20/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/19/2026 | Energy Code Compliance Inspections | — | progress |
| 08/19/2026 | Masonry | — | special |
| 08/19/2026 | Post-installed Anchors | — | special |
| 08/19/2026 | Air barrier - visual inspection | — | energy_progress |
| 08/19/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/11/2026 | Post-installed Anchors | — | special |
| 08/11/2026 | Sprinkler Systems | — | special |
| 08/11/2026 | Final | EDWARD TOROSSIAN | progress |
| 08/11/2026 | Energy Code Compliance Inspections | EDWARD TOROSSIAN | progress |
| 08/11/2026 | Post-installed Anchors | — | special |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/11/2026 | Mechanical Systems | EDWARD TOROSSIAN | special |
| 08/07/2026 | Final | Michael Carlton | progress |
| 07/30/2026 | Final | EDWARD TOROSSIAN | progress |
| 07/30/2026 | Mechanical Systems | EDWARD TOROSSIAN | special |
| 07/16/2026 | Final | EDWARD TOROSSIAN | progress |
| 07/16/2026 | Post-installed Anchors | EDWARD TOROSSIAN | special |
| 07/16/2026 | Concrete - Cast-In-Place | EDWARD TOROSSIAN | special |
| 07/15/2026 | Final | — | progress |
| 06/24/2026 | Post-installed Anchors | EDWARD TOROSSIAN | special |
| 06/24/2026 | Sprinkler Systems | EDWARD TOROSSIAN | special |
| 06/24/2026 | Final | EDWARD TOROSSIAN | progress |
| 06/24/2026 | Final | Michael Carlton | progress |
| 06/24/2026 | Structural Stability – Alterations of existing buildings | EDWARD TOROSSIAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Benihana | Restaurant / Food Service | — | Project M01256200 |
| Lee Equity Partners | Office | Floor 16 | Project M01204815 |
| Loro Piana | Office | Floor 21 | Project M01151914 |
| MHR Fund Management | Office | Floor 24 | Project M01045286 Project M01045405 Project M01045414 |
| Duquesne Family Office | Office | Floor 25 | Project M01020110 |
| HPS Investment Partners | Office | Floors 8, 9 | Project M00963322 Project M00963339 |
| Givaudan | Office | Floors 10, 11, 17 | Project M00677089 Project M00669782 Project M00322554 Project M00322584 |
| Darsana Capital Partners | Office | Floor 22 | Project M00666944 Project M00668009 |
| Lightyear Capital | Office | Floor 22 | Project M00521851 Project M00521863 Project M00522612 |
| Eastdil Secured | Office | Floor 23 | Project M00305778 |