← Back
Elevator apt, fireproof with stores
3841 BROADWAY
MANHATTAN · BIN 1063350
💬 Discuss this project
1913Year Built
10Stories
D6Building Class
R8Zoning
109,022 sfGross Floor Area
71Units
LL97 CoveredRent Stabilized40 Open Violations ▸FISP: UNSAFE
Elevator apt, fireproof with stores · Owner of record: 601 WEST REALTY LLC · 12,490 sf lot · 8.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 3 docs
Floor 4Under Construction5p · 2 filings · 20 docs
Floor 3
Floor 2Under Construction4p · 1 filing · 14 docs
Floor 1Under Construction28p · 2 filings · 20 docs
CellarUnder Construction31p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BILLY ENTERPRISES1107/08/2026
MODERN SERVICES SOLUTIONS1107/08/2026
METRO CONTRACTING NY604/09/2026
601 WEST REALTY13903/22/2026
601 WEST REATLY LLC103/22/2026
601 WEST 160 ST LLC103/22/2026
601 W REALTY CORP.703/22/2026
RSG CONSTRUCTION403/22/2026
601 W REALTY, LLC 1103/22/2026
SUCCESSFUL MANGT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA203/21/2026
OUTSOURCE CONSULTANTS, INC.1203/21/2026
RIGHT WAY SERVICES NYC203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BILLY ENTERPRISES INCGeneral Contractor707/08/2026
V.C. GLOBAL TECH CORPGeneral Contractor404/09/2026
QUEST BUILDERS GROUP INCGeneral Contractor304/09/2026
METRO CONTRACTING NY, INC.General Contractor304/09/2026
LAURENCE ROBINElectrical303/21/2026
TOUEY, CHRISTOPHERElectrical203/21/2026
METAL CRAFTS BY N BARSILYElectrical203/21/2026
RICHARD NEUElectrical203/22/2026
SILVER, HUGHElectrical203/21/2026
SITRUK, MAURICEElectrical203/21/2026
TORRES IVANElectrical103/21/2026
BOXWOOD CONSTRUCTION LLCGeneral Contractor104/09/2026
MEGA CONSTRUCTION SVC INCGeneral Contractor107/08/2026
TITAN ELEC'L & ELEV CONTRElectrical103/22/2026
MODERN SERVICES SOLUTIONSGeneral Contractor107/08/2026
OASIS PLOMO CORPGeneral Contractor107/28/2026
RICHARD NEUElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899505/14/2026
MOHAMMAD AHEAD - PROFESSI9286205/14/2026
JOSE M. LANDAURO3500110/01/2025
HT ENGINEERING, PLLC6274505/05/2025
STRATFORD ENGINEERING997104/30/2025
PHILIP TOSCANO, ARCHITECT2474208/15/2022
Building Lifecycle
All (203)Filed (20)Permit Issued (15)Facade (FISP) (16)Violation (60)Inspection (2)Objection (60)Special Inspection (30)
08/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00988847-P1
08/11/2026
Objection resolved — Resolved
08/10/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Structural
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Scope
07/28/2026
Objection raised — Energy
07/27/2026
Permit issued — General Construction
M01342589-I1-GC
07/15/2026
Violation issued (ECB, open)
Construction
07/06/2026
Filed — Alteration CO
SPLIT APTS #2C & #4C AT FLOORS 002 & 004. WORK INCLUDES NEW PARTITIONS AND DOORS, INSTALLATION OF NEW LIGHTING, AND FINISHES THROUGHOUT. AMEND C/O TO REMOVE SUPER'S APT. OBTAIN NEW C/O.
M01408968-S1
07/02/2026
Filed — Alteration CO
SPLIT APTS #2C & #4C AT FLOORS 002 & 004. WORK INCLUDES NEW PARTITIONS AND DOORS, INSTALLATION OF NEW LIGHTING, AND FINISHES THROUGHOUT. AMEND C/O TO REMOVE SUPER'S APT. OBTAIN NEW C/O.
M01408968-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/22/2026
Special inspection requirement — Insulation placement and R values
06/22/2026
Special inspection requirement — Lighting in dwelling units
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/03/2026
Special inspection requirement — Sprayed fire-resistant materials
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Final
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Structural Cold-Formed Steel
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Structural Steel - Welding
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Structural Steel - Details
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMMAD AHEAD
06/03/2026
Special inspection requirement — Final
ARIEL GOLSHAN
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
05/14/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-P2
05/14/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-P1
05/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Permit issued — Suspended Scaffold
M01390285-I1-SC
05/05/2026
Cycle 10 facade report submitted
05/05/2026
Cycle 10 facade report signed — UNSAFE
04/29/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01390285-I1
04/29/2026
Violation issued (HPD, closed)
A
04/28/2026
Permit issued — Structural
M01276442-I1-GC-CX
04/28/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
04/20/2026
Cycle 10 facade inspection completed
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
A
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
03/20/2026
Permit issued — Structural
M01342589-S2-ST
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/04/2026
Objection raised — Cost
02/04/2026
Objection raised — Cost
01/27/2026
Violation issued (HPD, closed)
C
01/22/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-I1
01/22/2026
Filed — Alteration
MISCELLANEOUS RENOVATIONS INCLUDING STRUCTURAL SUPPORTS AT PORTIONS OF THE CEILING, FIRE-PROOFING OF STEEL COLUMNS AND FIRE WRAP AT AN EXHAUST DUCT, NO CHANAGE IN USE, EGREES, OR OCCUPANCY.
M01342589-S2
12/27/2025
Violation issued (HPD, closed)
C
12/22/2025
Permit issued — Plumbing
M00783119-S1-PL
12/10/2025
Violation issued (ECB, open)
Construction
12/10/2025
Violation issued (ECB, open)
Quality of Life
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedOASIS PLOMO CORP07/27/2026
DOB NOWSuspended ScaffoldPermit IssuedMEGA CONSTRUCTION SVCS IN05/11/2026
DOB NOWStructuralPermit IssuedMEGA CONSTRUCTION SVC INC04/28/2026
DOB NOWStructuralPermit IssuedBOXWOOD CONSTRUCTION LLC03/20/2026
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP12/22/2025
DOB NOWSidewalk ShedPermit IssuedMETRO CONTRACTING NY, INC.11/12/2025
DOB NOWGeneral ConstructionPermit IssuedV.C. GLOBAL TECH CORP11/06/2025
DOB NOWMechanical SystemsPermit IssuedQUEST BUILDERS GROUP INC09/03/2025
DOB NOWGeneral ConstructionPermit IssuedQUEST BUILDERS GROUP INC06/11/2025
DOB NOWSidewalk ShedPermit IssuedMETRO CONTRACTING NY, INC.01/19/2024
DOB NOWGeneral ConstructionPermit IssuedV.C. GLOBAL TECH CORP10/11/2022
DOB NOWSidewalk ShedPermit IssuedMODERN SERVICES SOLUTIONS09/10/2020
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC10/11/2019
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC01/15/2019
DOB NOWSidewalk ShedPermit IssuedBILLY ENTERPRISES INC12/11/2018
BISEQISSUEDMEGA CONSTRUCTION SVC INC09/13/2022
BISOTISSUEDMEGA CONSTRUCTION SVC INC09/13/2022
BISEQISSUEDMEGA CONSTRUCTION SVC INC09/13/2022
BISOTISSUEDMEGA CONSTRUCTION SVC INC09/13/2022
BISOTISSUEDMODERN SERVICES SOLUTIONS02/22/2021
BISPLISSUEDSENID PL & HTG CORP01/29/2021
BISOTISSUEDMODERN SERVICES SOLUTIONS01/31/2020
BISPLISSUEDSENID PL & HTG CORP06/11/2019
BISPLISSUEDSENID PL & HTG CORP06/11/2019
BISOTISSUEDMODERN SERVICES SOLUTIONS06/10/2019
BISEQISSUEDV.C. GLOBAL TECH CORP02/22/2019
BISOTISSUEDV.C. GLOBAL TECH CORP02/22/2019
BISOTISSUEDV.C. GLOBAL TECH CORP02/22/2019
BISEQRE-ISSUEDV.C. GLOBAL TECH CORP02/22/2019
BISOTISSUEDV.C. GLOBAL TECH CORP02/12/2018
BISEQISSUEDV.C. GLOBAL TECH CORP02/12/2018
BISEQISSUEDV.C. GLOBAL TECH CORP02/09/2018
BISOTISSUEDV.C. GLOBAL TECH CORP02/09/2018
BISEQISSUEDBILLY ENTERPRISES INC09/20/2017
BISEQISSUEDROCK GROUP NY CORP08/03/2017
BISPLISSUEDBAUER MECHANCIAL LLC07/27/2017
BISEQISSUEDRSG CONSTRUCTION CORP01/12/2017
BISEQISSUEDROCK GROUP NY CORP07/21/2016
BISEQISSUEDROCK GROUP NY CORP07/22/2015
BISEQISSUEDHKS CONSTRUCTION CORP03/02/2015
+ 21 more permits on file
1 project · most recent 08/19/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2025Permit IssuedQUEST BUILDERS GROUP INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P18NMAU-E5 883 CFM · Vrf Indoor ×2
MXZ-SM36NAMHZ-U1 4 tons · Condensing Unit ×1
MXZ-SM60NAM2-U1 6 tons · Condensing Unit ×1
PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×1
PKFY-P12NLMU-ER1.TH 297 CFM · Vrf Indoor ×1
PMFY-P12NBMU-ER5 328 CFM · Vrf Indoor ×1
Ventilation
Panasonic FV-0511VKS2 100 CFM · Exhaust Fan ×2
1 project · most recent 08/19/2025
Sprinkler System
FiledStatusContractorScope
08/19/2025——Sprinkler System
2 projects · most recent 07/06/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/06/2026——Gas, Plumbing-Sprinkler
08/19/2025——Water/Sanitary
13 projects · most recent 07/17/2025
General Wiring
FiledStatusContractorScope
07/17/2025Permit IssuedCROSSWIRE ELECTRICAL INCGeneral Wiring
05/12/2025Permit IssuedA.C. MORGAN ELECTRICGeneral Wiring
01/20/2024Permit IssuedRICHARD NEU—
06/01/2023CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
12/13/2022Permit IssuedSEGA ELECTRIC LLCGeneral Wiring
09/10/2020Permit IssuedRICHARD NEU—
01/21/2020Permit IssuedILLUMINOUS ELECTRIC CORP.—
12/30/2019CompleteTITAN ELEC'L & ELEV CONTR—
12/30/2019CompleteTITAN ELEC'L & ELEV CONTR—
11/29/2019CompleteAUJLA ELECTRIC CORPGeneral Wiring
10/23/2019CompleteAUJLA ELECTRIC CORP—
09/20/2019CancelledTITAN ELEC'L & ELEV CONTR—
05/01/2019CompleteAUJLA ELECTRIC CORPGeneral Wiring
2 projects · most recent 05/14/2026
Steel Concrete
FiledStatusContractorScope
05/14/2026Permit IssuedOASIS PLOMO CORPSteel
08/19/2025Permit IssuedQUEST BUILDERS GROUP INCSteel, Concrete
4 projects · most recent 08/14/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/14/2026Permit IssuedMETRO CONTRACTING NY, INCSidewalk Shed
08/19/2025Permit IssuedQUEST BUILDERS GROUP INCFence
08/27/2020Permit IssuedMODERN SERVICES SOLUTIONSSidewalk Shed
11/06/2018Permit IssuedBILLY ENTERPRISES INCSidewalk Shed
1 project · most recent 04/29/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2026Permit IssuedMEGA CONSTRUCTION SVCS INSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/10/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
05/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and Joints—special
06/22/2026Insulation placement and R values—energy_progress
06/22/2026Lighting in dwelling units—energy_progress
06/22/2026Fire-Resistance Rated Construction—progress
06/22/2026Energy Code Compliance Inspections—progress
06/22/2026Tenant Protection Plan Compliance—special
06/03/2026Sprayed fire-resistant materialsARIEL GOLSHANspecial
06/03/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
06/03/2026FinalARIEL GOLSHANprogress
06/03/2026Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
06/03/2026Structural Cold-Formed SteelMOHAMMAD AHEADspecial
06/03/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
06/03/2026Structural Steel - WeldingMOHAMMAD AHEADspecial
06/03/2026Post-installed AnchorsMOHAMMAD AHEADspecial
06/03/2026Structural Steel - High Strength BoltingMOHAMMAD AHEADspecial
06/03/2026Structural Steel - DetailsMOHAMMAD AHEADspecial
06/03/2026Structural Stability – Alterations of existing buildingsMOHAMMAD AHEADspecial
06/03/2026FinalARIEL GOLSHANprogress
06/03/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
04/28/2026Post-installed anchors in masonryMichael Lombardospecial
05/01/2025Fire-Resistant Penetrations and JointsHENRY TORRESspecial
05/01/2025Fire-Resistant Penetrations and JointsHENRY TORRESspecial
04/28/2025Sprinkler SystemsHENRY TORRESspecial
04/28/2025FinalHENRY TORRESprogress
04/28/2025Energy Code Compliance InspectionsHENRY TORRESprogress
Latest 25 of 41.
▾Documents — 368 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch19
09/06/2026M00093532-I1Request digital key ↗
09/02/2026M00783119-S1Request digital key ↗
09/02/2026M00783119-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/15/2026M00390224-I1Request digital key ↗
▸Applications & Permits76
▸BISPLAN / WORK APPROVAL APPLICATION36
03/09/2022123226892Open ↗
03/01/2022123226892Open ↗
02/15/2022123226892Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION35
09/14/2022123226892Open ↗
09/14/2022123226892Open ↗
09/14/2022123226008Open ↗
Showing 3 of 35 on file for this type
▸BISLL114/19 PERMIT RESTRICTION4
09/14/2022123226892Open ↗
09/14/2022123226892Open ↗
09/14/2022123226008Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/06/2020123703475Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026M01408968-I1Open ↗
▸Seals & Professional Certifications93
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00390224-I1Open ↗
08/28/2026M00988847-I1Open ↗
08/28/2026M00988847-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/30/2020123703475Open ↗
06/26/2019122915550Open ↗
06/10/2019123859538Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
04/30/2019123730515Open ↗
03/28/2019123859538Open ↗
02/13/2019123226892Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
04/30/2019123730515Open ↗
03/28/2019123859538Open ↗
02/13/2019123226892Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026M00783119-I1Open ↗
09/01/2026M00783119-I1Open ↗
09/01/2026M00783119-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00783119-I1Open ↗
09/01/2026M01216954-S3Open ↗
08/31/2026M01216954-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/13/2017140691865Open ↗
07/18/2017140669729Open ↗
Showing 2 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
09/13/2017140691865Open ↗
07/18/2017140669729Open ↗
Showing 2 of 5 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING6
02/15/2022123226892Open ↗
07/18/2017140669729Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
06/26/2019122915550Open ↗
04/30/2019123730515Open ↗
02/13/2019123226892Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes10
01/30/2020123703475Open ↗
07/12/2019122915550Open ↗
06/26/2019122915550Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
07/23/2019122915550Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00390224-I1Open ↗
▸Environmental & Asbestos25
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/21/2026M01216954-S4Open ↗
08/21/2026M01216954-S3Open ↗
08/21/2026M01216954-S2Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/15/2022123226892Open ↗
01/31/2020123703475Open ↗
07/12/2019122915550Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
04/19/2019123859538Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/08/2022123226892Open ↗
02/07/2022123226892Open ↗
01/20/2022123226008Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/30/2020123703475Open ↗
06/26/2019122915550Open ↗
04/30/2019123730515Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/13/2017140691865Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/18/2017140669729Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/19/2021123859538Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
03/08/2022123226892Open ↗
02/07/2022123226892Open ↗
01/12/2022123226008Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/14/2022123226008Open ↗
09/14/2022123226008Open ↗
09/14/2022123226892Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSHED LETTER3
08/11/2017140372102Open ↗
02/10/2017140372102Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/14/2025123226892Open ↗
07/19/2021123859538Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT21
03/01/2022123226892Open ↗
02/14/2022123226892Open ↗
02/08/2022123226892Open ↗
Showing 3 of 21 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
09/19/2017140691865Open ↗
07/27/2017140669729Open ↗
07/27/2017140669729Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/20/2019122915550Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/19/2021123859538Open ↗
▸Filing & Intake Forms42
▸BISBOROUGH INTAKE FORM14
09/14/2022123226008Open ↗
09/14/2022123226892Open ↗
09/14/2022123226008Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
03/09/2022123226892Open ↗
01/13/2022123226008Open ↗
05/06/2021123859538Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET11
01/30/2020123703475Open ↗
06/26/2019122915550Open ↗
04/30/2019123730515Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/13/2017140691865Open ↗
07/18/2017140669729Open ↗
01/09/2017140592491Open ↗
Showing 3 of 6 on file for this type
▸Other Documents6
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/17/2026M01390285-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026M00093532-I1Open ↗
▸DOB NOWCalculations1
08/17/2026M01390285-I1Open ↗