← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
385 First Avenue Condo
385 1 AVENUE · BIN 1086124
💬 Discuss this project
2002Year Built
20Stories
RMBuilding Class
C1-9AZoning
114,544 sfGross Floor Area
117Units
LL97 CoveredRent Stabilized16 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 9,875 sf lot · 11.6 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 3 filings · 19 docs
Floor 5Under Construction2 filings · 13 docs
Floor 41 filing · 2 docs
Floor 31 filing · 2 docs
Floor 21 filing · 2 docs
Floor 1Under Construction24p · 5 filings · 20 docs
Cellar2p · 2 filings · 11 docs
BasementUnder Construction1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANHATTAN RE INVESTMENTS II909/13/2026
FIRSTSERVICE RESIDENTIAL509/13/2026
MAGNUM1207/08/2026
8203 3RD AVE PROPERTY404/09/2026
KINGS GROUP NY504/09/2026
UNITED HEALTH GROUP303/22/2026
BKB CONSTRUCTION NORTHEAS303/22/2026
385 FIRST AVENUE CONDOMIN103/22/2026
MF 385 FIRST AVENUE1603/22/2026
BONS LEND LEASE INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY603/21/2026
PS ENGINEERS803/21/2026
KMA DESIGNS LLC203/21/2026
LOUIS STRIAR203/21/2026
BERTOLINI ARCHITECTURAL WORKS DPC203/21/2026
KAZAM CONSULTANTS403/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIBUTE RESTORATION INCGeneral Contractor407/08/2026
KINGS GROUP NY CORPGeneral Contractor204/09/2026
CAD SIGNS NYCScaffold207/08/2026
CITYTECH CONSTRUCTION CO*General Contractor207/08/2026
CATMAN PLUMBING INCPlumbing108/25/2026
CROSSFIELD PLBG.&HTGPlumbing106/28/2026
GBL MECHANICAL INCPlumbing107/08/2026
S & L PLUMBING INCPlumbing107/04/2026
A1 SPECIALIZED, INCScaffold107/08/2026
R G M SIGNSScaffold107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
SIGNSTAR NYCScaffold107/08/2026
CORP. ELEC'L TECHNOLOGIESElectrical103/22/2026
CASE PLUMBING LLCFire Protection107/04/2026
H INTERIOR DESIGN CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QWA STUDIO9293406/02/2026
LU NING ARCHITECTURE, PLL1155203/11/2026
FRANCISCO D. PEREZ PE3306305/28/2025
ATLAS ATC ENGINEERING INC8011109/12/2024
A&B WORLD CONSULTING, INC5704303/18/2021
EAB ENGINEERING, PC2048107/26/2019
Building Lifecycle
All (167)Filed (22)Permit Issued (22)Signed Off (4)Facade (FISP) (9)Violation (60)Inspection (6)Objection (14)Special Inspection (30)
08/24/2026
Permit issued — Plumbing
M01352854-S2-PL
08/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/29/2026
Filed — Alteration
facade inspection
M01423448-I1
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/02/2026
Filed — Alteration
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
M01352854-P1
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
06/02/2026
Special inspection requirement — Sprinkler Systems
Kun Wu
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
06/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
06/01/2026
Special inspection requirement — Sprinkler Systems
Kun Wu
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
06/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
05/08/2026
Permit issued — Mechanical Systems
M01352854-S1-MS
05/06/2026
Permit issued — Plumbing
M01352854-S2-PL
05/06/2026
Permit issued — Plumbing
M01352854-S2-EW-SP
05/05/2026
Permit issued — General Construction
M01303478-I1-GC
05/05/2026
Permit issued — Plumbing
M01303478-S1-PL
04/28/2026
Filed — Alteration
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
M01352854-S1
04/28/2026
Filed — Alteration
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
M01352854-S2
04/24/2026
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01146461-I1
04/02/2026
Signed off — Alteration
M01147039-I1
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/31/2026
Objection raised — Energy
03/31/2026
Objection raised — Admin
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection resolved — Addressed
03/22/2026
Objection raised — Scope
03/22/2026
Objection raised — Admin
03/15/2026
Special inspection requirement — Mechanical Systems
Kun Wu
03/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
Kun Wu
03/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Kun Wu
03/15/2026
Special inspection requirement — Final
Kun Wu
03/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
03/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
03/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
03/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Kun Wu
03/11/2026
Filed — Alteration
INTERIOR RENOVATION TO EXISTING APARTMENT 5E. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01303478-S1
03/11/2026
Filed — Alteration
INTERIOR RENOVATION TO EXISTING APARTMENT 5E. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01303478-I1
03/11/2026
Special inspection requirement — Lighting in dwelling units
NING LU
03/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
NING LU
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NING LU
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
NING LU
03/10/2026
Permit issued — Supported Scaffold
M01147039-I1-SF
03/10/2026
Permit issued — General Construction
M01100005-I1-GC
03/02/2026
Permit issued — Sign
M01354426-I1-SG
02/27/2026
Permit issued — Sidewalk Shed
M01173189-I1-SH
02/25/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED SIGNAGES FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01354426-I1
02/04/2026
Permit issued — General Construction
M01352854-I1-GC
02/02/2026
Filed — Alteration
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
M01352854-I1
02/02/2026
Special inspection requirement — Final
YUNHO LEE
01/29/2026
Special inspection requirement — Interior lighting power
Kun Wu
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
01/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
01/29/2026
Special inspection requirement — Final
Kun Wu
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCATMAN PLUMBING INC08/24/2026
DOB NOWMechanical SystemsPermit IssuedCITYTECH CONSTRUCTION CO*05/08/2026
DOB NOWPlumbingPermit IssuedS & L PLUMBING INC05/06/2026
DOB NOWPlumbingPermit IssuedCASE PLUMBING LLC05/06/2026
DOB NOWGeneral ConstructionPermit IssuedH INTERIOR DESIGN CONSTRUCTION05/05/2026
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG05/05/2026
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC03/10/2026
DOB NOWGeneral ConstructionPermit IssuedTRIBUTE RESTORATION INC03/10/2026
DOB NOWSignPermit IssuedMAD SIGNS INC03/02/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP02/27/2026
DOB NOWGeneral ConstructionPermit IssuedCITYTECH CONSTRUCTION CO*02/04/2026
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC10/02/2025
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC03/26/2025
DOB NOWGeneral ConstructionPermit IssuedTRIBUTE RESTORATION INC03/17/2025
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP02/27/2025
DOB NOWSupported ScaffoldSigned-offTRIBUTE RESTORATION INC12/23/2024
DOB NOWSuspended ScaffoldSigned-offTRIBUTE RESTORATION INC12/13/2024
DOB NOWSignPermit IssuedSIGNSTAR NYC05/03/2023
DOB NOWPlumbingPermit IssuedLIQUID TECH PLBG&HTG,INC01/28/2021
DOB NOWSignSigned-offSIGNS CAD CORP01/12/2021
DOB NOWSignSigned-offSIGNS CAD CORP01/12/2021
DOB NOWSignPermit IssuedR.G.M. SIGNS INC07/31/2019
BISOTISSUEDJOHN GARBARINI11/22/2019
BISPLISSUEDFLOW-RIGHT PLBG & HTG COR07/19/2017
BIS—ISSUEDMETROPOLITAN BUILDERS OF02/16/2017
BISOTISSUEDMETROPOLITAN BUILDERS OF10/03/2016
BISPLISSUEDFLOW-RIGHT PLBG & HTG COR07/20/2016
BISMHISSUEDDIMENSIONAL CONCEPTS INC06/06/2016
BISOTISSUEDDIMENSIONAL CONCEPTS INC06/03/2016
BISSPISSUEDFIRE SPRINKLER ASSOC INC05/12/2016
BISPLISSUEDANGELO ANDREW INC03/30/2016
BISOTISSUEDDIMENSIONAL CONCEPTS INC03/29/2016
BIS—ISSUEDMETROPOLITAN BUILDERS OF02/24/2016
BISOTISSUEDMETROPOLITAN BUILDERS OF02/19/2016
BISPLISSUEDFLOW-RIGHT PLBG & HTG COR07/17/2015
BIS—ISSUEDMETROPOLITAN BUILDERS OF07/16/2015
BISMHISSUEDBNK COOLING & HEATING COR07/07/2015
BISMHISSUEDMETROPOLITAN BUILDERS OF06/12/2015
BISPLRE-ISSUEDTESTERMAN PLBG & HTG INC03/24/2015
BISOTISSUEDFIRST STANDARD CONSTR INC03/17/2015
+ 32 more permits on file
1 project · most recent 06/02/2026
Cooling Towers Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedCITYTECH CONSTRUCTION CO*Cooling Towers, Heating Systems
Heating
Warren ×1
Cooling Tower
Sigma ×1
1 project · most recent 06/02/2026
Sprinkler System
FiledStatusContractorScope
06/02/2026Permit IssuedCASE PLUMBING LLCSprinkler System
3 projects · most recent 06/02/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/02/2026Permit IssuedCATMAN PLUMBING INCWater/Sanitary
03/11/2026Permit IssuedCROSSFIELD PLBG.&HTGGas, Water/Sanitary
03/18/2021Permit IssuedLIQUID TECH PLBG&HTG,INCGas, Water/Sanitary
11 projects · most recent 04/12/2026
General Wiring
FiledStatusContractorScope
04/12/2026Permit IssuedNELSON & TOM MAINT INC DBGeneral Wiring
03/17/2026Permit IssuedVOLTRON ELECTRIC LLC—
03/17/2026Permit IssuedVOLTRON ELECTRIC LLC—
02/27/2025Permit IssuedHIGH QUALITY ELECTRIC OF—
07/07/2022Permit IssuedSAFETECH ELECL CONTNG CORGeneral Wiring
10/01/2021Permit IssuedR.C.M. ELECTRIC CORP.—
01/13/2021Permit IssuedSIGNS CAD CORP—
01/13/2021Permit IssuedSIGNS CAD CORP—
11/21/2019Permit IssuedRAINBOW ELECTRIC CO., INC—
06/05/2019CompleteCORP. ELEC'L TECHNOLOGIESGeneral Wiring
11/09/2018CompleteANTONIO CERIELLO ELEC INC—
1 project · most recent 02/27/2025
Sidewalk Shed
FiledStatusContractorScope
02/27/2025Permit IssuedKINGS GROUP NY CORPSidewalk Shed
1 project · most recent 06/29/2026
FiledStatusContractorScope
06/29/2026———
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and JointsKun Wuspecial
06/02/2026Sprinkler SystemsKun Wuspecial
06/02/2026Energy Code Compliance InspectionsKun Wuprogress
06/02/2026Tenant Protection Plan ComplianceKun Wuspecial
06/01/2026Sprinkler SystemsKun Wuspecial
06/01/2026Fire-Resistant Penetrations and JointsKun Wuspecial
06/01/2026Energy Code Compliance InspectionsKun Wuprogress
06/01/2026Tenant Protection Plan ComplianceKun Wuspecial
03/15/2026Mechanical SystemsKun Wuspecial
03/15/2026HVAC-R and service water heating system controlsKun Wuenergy_progress
03/15/2026HVAC-R and service water piping design and insulationKun Wuenergy_progress
03/15/2026FinalKun Wuprogress
03/15/2026Energy Code Compliance InspectionsKun Wuprogress
03/15/2026Tenant Protection Plan ComplianceKun Wuspecial
03/15/2026Fire-Resistant Penetrations and JointsKun Wuspecial
03/15/2026HVAC-R and service water heating equipmentKun Wuenergy_progress
03/11/2026Lighting in dwelling unitsNING LUenergy_progress
03/11/2026Fire-Resistance Rated ConstructionNING LUprogress
03/11/2026Fire-Resistant Penetrations and JointsNING LUspecial
03/11/2026Tenant Protection Plan ComplianceNING LUspecial
02/02/2026FinalYUNHO LEEprogress
01/29/2026Interior lighting powerKun Wuenergy_progress
01/29/2026Fire-Resistant Penetrations and JointsKun Wuspecial
01/29/2026Tenant Protection Plan ComplianceKun Wuspecial
01/29/2026FinalKun Wuprogress
Latest 25 of 44.
▾Documents — 420 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch14
08/31/2026M00849583-I1Request digital key ↗
08/26/2026M01100005-I1Request digital key ↗
08/25/2026M01147039-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/05/2026M00188075-I1Request digital key ↗
09/04/2026M00295837-I1Request digital key ↗
09/04/2026M00295861-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00448502-I1Request digital key ↗
08/15/2026M00448502-P1Request digital key ↗
08/15/2026M00194471-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00448547-I1Request digital key ↗
▸Applications & Permits70
▸BISPLAN / WORK APPROVAL APPLICATION41
07/18/2019123891459Open ↗
06/25/2018101267834Open ↗
06/21/2018103205185Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION27
11/26/2019123891459Open ↗
02/23/2017122233109Open ↗
09/29/2016140556921Open ↗
Showing 3 of 27 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/21/2016122358689Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/07/2016122233109Open ↗
▸Seals & Professional Certifications113
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
07/18/2019123891459Open ↗
07/17/2018140556921Open ↗
07/11/2018140556921Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026M01352854-P1Open ↗
08/30/2026M00295861-I1Open ↗
08/27/2026M01352854-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/05/2026M00188075-I1Open ↗
09/05/2026M00194471-I1Open ↗
09/04/2026M00295837-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M01352854-P1Open ↗
08/31/2026M00448502-P1Open ↗
08/27/2026M01303478-S1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/08/2017121277064Open ↗
09/29/2016140556921Open ↗
05/04/2016122358689Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/08/2017121277064Open ↗
05/04/2016122358689Open ↗
04/20/2016122235125Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/29/2016140556921Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/29/2016140556921Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
04/03/2018122233109Open ↗
03/28/2018122233109Open ↗
08/10/2017122233109Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/07/2018122233109Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/30/2018122892628Open ↗
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan4
09/05/2026M00188075-I1Open ↗
09/04/2026M00295837-I1Open ↗
08/15/2026M00194471-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes2
07/18/2019123891459Open ↗
09/29/2016140556921Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/18/2019123891459Open ↗
05/04/2016122358689Open ↗
04/20/2016122235125Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
09/29/2016140556921Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026M00194471-I1Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
07/18/2019123891459Open ↗
07/27/2017122233109Open ↗
07/27/2017122233109Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/07/2018122233109Open ↗
05/15/2017122235125Open ↗
03/21/2017122235125Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/29/2016140556921Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs46
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
01/23/2019122233109Open ↗
01/03/2019122233109Open ↗
01/03/2019122233109Open ↗
Showing 3 of 28 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/13/2019123891459Open ↗
01/23/2019122233109Open ↗
11/23/2018122233109Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/04/2016122358689Open ↗
Showing 1 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
01/24/2018122233109Open ↗
07/18/2016122233109Open ↗
Showing 2 of 3 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT22
07/18/2019123891459Open ↗
12/18/2018122233109Open ↗
12/07/2018122233109Open ↗
Showing 3 of 22 on file for this type
▸Filing & Intake Forms67
▸BISBOROUGH INTAKE FORM25
01/23/2019122233109Open ↗
01/03/2019122233109Open ↗
12/21/2018122233109Open ↗
Showing 3 of 25 on file for this type
▸BISADDITIONAL INFORMATION25
07/18/2019123891459Open ↗
07/11/2018140556921Open ↗
06/21/2018103205185Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET14
07/18/2019123891459Open ↗
06/08/2017121277064Open ↗
09/21/2016122892628Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/29/2016140556921Open ↗
Showing 1 of 3 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
04/18/2018103205185Open ↗
01/27/2017122883246Open ↗
09/06/2016122883246Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations3
08/23/2026M01146461-P1Open ↗
08/23/2026M01146461-I1Open ↗
08/13/2026M01146461-P2Open ↗
▸DOB NOWDHCR Document3
09/04/2026M00448502-I1Open ↗
08/13/2026M00448547-I1Open ↗
08/13/2026M00448502-P1Open ↗
▸DOB NOWManufacturer's Specifications3
08/23/2026M01146461-I1Open ↗
08/23/2026M01146461-P1Open ↗
08/13/2026M01146461-P2Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
06/10/2016122235125Open ↗
▸DOB NOWIRA Certification1
08/16/2026M01423448-I1Open ↗