BuildNYC
Church, synagogue, chapel
Midwood Catholic Academy
3898 FLATLANDS AVENUE · Flatlands · BIN 3337372
💬 Discuss this project
1931Year Built
3Stories
M1Building Class
R3-2Zoning
32,006 sfGross Floor Area
0Units
1 Active Violation ▸FDNY Report ↗
Church, synagogue, chapel · 75,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMidwood Catholic Academy6p · 2 filings · 11 docs
Floor 3Midwood Catholic Academy4p · 1 filing · 5 docs
Floor 2Midwood Catholic Academy4p · 1 filing · 5 docs
Floor 1Midwood Catholic Academy6p · 2 filings · 9 docs
CellarMidwood Catholic Academy10p · 4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rocklyn Asset503/22/2026
St Thomas Aquinas RC Church103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gregory V. Perotto, P.E402/06/2025
CNS Inspection Services105/09/2023
New Age110/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Group803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Guaranteed Home ImprovemeGeneral Contractor303/21/2026
Cobra ElectricElectrical103/22/2026
Cambridge Heating & Airspecialty_contractor107/08/2026
King's Plaza Plumbing & Heating IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gregory V. Perotto, P.E947402/06/2025
Norman C. Lok818105/09/2023
New Age Engineering7746110/24/2022
Building Lifecycle
All (71)Filed (6)Permit Issued (4)Signed Off (5)Violation (42)Inspection (4)Special Inspection (10)
09/02/2026
Violation issued (ECB, open)
Construction
06/04/2025
Signed off — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BURNER. REPLACEMENT BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01104812-I1
03/26/2025
Violation issued (FDNY_ORDER, closed)
02/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/25/2025
Signed off — Alteration
REPLACE OIL BURNER WITH NEW DUAL FUEL BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. GAS PLUMBING WORK FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01104811-I1
02/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
02/06/2025
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BURNER. REPLACEMENT BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01104812-P1
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
02/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/27/2024
Signed off — Alteration
B01104814-I1
09/18/2024
Permit issued — Plumbing
B01104812-I1-PL
09/18/2024
Permit issued — Boiler Equipment
B01104811-I1-BE
09/16/2024
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BURNER. REPLACEMENT BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01104812-I1
09/16/2024
Filed — Alteration
REPLACE OIL BURNER WITH NEW DUAL FUEL BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. GAS PLUMBING WORK FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01104811-I1
09/16/2024
Filed — Alteration
B01104814-I1
08/31/2024
Special inspection requirement — Final
Gregory Perotto
08/31/2024
Special inspection requirement — Chimneys and vents
Gregory Perotto
08/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
06/17/2024
Violation issued (FDNY_ORDER, closed)
09/01/2023
Signed off — Alteration
PROPOSED SPLIT SYSTEM UNITS
B00871834-I1
05/10/2023
Permit issued — Mechanical Systems
B00871834-I1-MS
05/09/2023
Filed — Alteration
PROPOSED SPLIT SYSTEM UNITS
B00871834-I1
05/08/2023
Special inspection requirement — Mechanical Systems
NORMAN LOK
05/08/2023
Special inspection requirement — Final
MOHAMMAD AHEAD
02/17/2023
Signed off — Alteration
B08019035-I1
10/25/2022
Permit issued — Mechanical Systems
B08019035-I1-MS
10/24/2022
Filed — Alteration
B08019035-I1
10/24/2022
Special inspection requirement — Chimneys and vents
Stephen Shishko
10/11/2022
Special inspection requirement — Final
Stephen Shishko
10/11/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
12/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/04/2021
Violation issued (FDNY_ORDER, closed)
03/03/2021
Violation issued (FDNY_NOV, closed)
03/19/2020
Violation issued (ECB, closed)
Construction
03/19/2020
Violation issued (ECB, closed)
Construction
01/10/2020
Violation issued (FDNY_NOV, closed)
01/10/2020
Violation issued (FDNY_ORDER, closed)
01/10/2020
Violation issued (FDNY_ORDER, closed)
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/25/2011
Violation issued (FDNY_ORDER, closed)
05/25/2011
Violation issued (FDNY_ORDER, closed)
05/25/2011
Violation issued (FDNY_ORDER, closed)
02/01/2011
Violation issued (FDNY_ORDER, closed)
03/08/2010
Violation issued (FDNY_ORDER, closed)
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/1996
Violation issued (ECB, closed)
Boilers
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKing's Plaza Plumbing & Heating I09/18/2024
DOB NOWBoiler EquipmentSigned-offApproved Oil Co. of Brook09/18/2024
DOB NOWMechanical SystemsSigned-offCambridge Heating Air05/10/2023
DOB NOWMechanical SystemsSigned-offGuaranteed Home Improveme10/25/2022
BIS—ISSUEDProbuild Contracting10/24/2018
BISSPISSUEDAccess Plumbing & Heating09/27/2018
BISPLISSUEDCN Plumbing07/30/2018
BIS—ISSUEDProbuild Contracting07/25/2018
BIS—ISSUEDProbuild Contracting07/25/2018
BISOTISSUEDProbuild Contracting06/11/2018
BISOTISSUEDVictoria Consulting & Development03/02/2011
BISEQISSUEDPheonix 132 Sutton Street08/11/2010
BISBLISSUEDRanshaw Plumbing & Heating04/08/2008
4 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompleteEverest Electric—
06/15/2022Permit IssuedPJZ MaintenanceGeneral Wiring
08/14/2019CompleteCobra ElectricGeneral Wiring
02/04/2019CompleteNycom Electrical—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/07/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
02/05/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
08/31/2024FinalGregory Perottoprogress
08/31/2024Chimneys and ventsGregory Perottospecial
08/31/2024Fire-Resistant Penetrations and JointsGregory Perottospecial
05/08/2023Mechanical SystemsNORMAN LOKspecial
05/08/2023FinalMOHAMMAD AHEADprogress
10/24/2022Chimneys and ventsStephen Shishkospecial
10/11/2022FinalStephen Shishkoprogress
10/11/2022Mechanical SystemsStephen Shishkospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Midwood Catholic AcademyEducationEntire building
Project B01104811 Alteration · LOC Issued · 09/16/2024
Project B01104812 Alteration · LOC Issued · 09/16/2024
Project B01104814 Alteration · LOC Issued · 09/16/2024
Project B00871834 Alteration · LOC Issued · 05/09/2023
Project B08019035 Alteration · LOC Issued · 10/24/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B08019035-I1Request digital key ↗
08/27/2026B00871834-I1Request digital key ↗
08/24/2026B01104811-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION12
08/30/2018321742824Open ↗
06/20/2018321742833Open ↗
06/12/2018321772505Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION11
10/25/2018321742833Open ↗
10/15/2018321742824Open ↗
08/02/2018321742833Open ↗
Showing 3 of 11 on file for this type
▸BISPLACE OF ASSEMBLY3
04/20/2016320824104Open ↗
04/20/2016320824104Open ↗
09/06/2012320579771Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/27/2019321742833Open ↗
01/28/2019321742833Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/16/2019321742833Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
06/20/2018321742833Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
10/21/2019321742815Open ↗
04/10/2019321742824Open ↗
09/28/2018321742824Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01104811-I1Open ↗
09/01/2026B01104814-I1Open ↗
08/30/2026B08019035-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B08019035-I1Open ↗
08/27/2026B00871834-I1Open ↗
08/24/2026B01104811-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
06/12/2018321772505Open ↗
01/11/2011320258252Open ↗
08/12/2010320197407Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/11/2011320258252Open ↗
08/12/2010320197407Open ↗
04/04/2008310116914Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01104814-I1Open ↗
08/30/2026B08019035-I1Open ↗
08/29/2026B00871834-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/12/2018321772505Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/30/2018321742824Open ↗
04/16/2018321742833Open ↗
04/16/2018321742824Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
08/27/2018321742824Open ↗
08/27/2018321742824Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/04/2008310116914Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/02/2020321742815Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/09/2018321742833Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026B08019035-I1Open ↗
08/24/2026B01104811-I1Open ↗
08/24/2026B01104814-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/12/2010320197407Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/12/2018321772505Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/11/2011320258252Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/04/2008310116914Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
08/30/2018321742824Open ↗
07/25/2018321742833Open ↗
06/20/2018321742833Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/26/2021321772505Open ↗
10/21/2019321742815Open ↗
10/21/2019321742824Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/21/2014320824104Open ↗
▸Inspections & Test Reports5
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
04/04/2008310116914Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/25/2018321742833Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/26/2021321772505Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/14/2018321742824Open ↗
▸BISSOIL REPORT1
06/22/2018321742833Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/13/2021321772505Open ↗
12/18/2020321742815Open ↗
10/21/2019321742815Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026B01104811-I1Open ↗
08/13/2026B01104812-P1Open ↗
08/13/2026B00871834-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/09/2018321742833Open ↗
11/17/2014320824104Open ↗
06/11/2014320824104Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/11/2011320258252Open ↗
08/12/2010320197407Open ↗
04/04/2008310116914Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/30/2018321742833Open ↗
04/16/2018321742833Open ↗
▸BISMaster Plumber Seal Temporary Approval Letter1
08/02/2018321742833Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
11/29/2012320579771Open ↗
▸BISSUPERSEDING LETTER1
10/15/2018321742824Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
10/26/2021321772505Open ↗
10/21/2019321742815Open ↗
10/21/2019321742824Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION9
10/27/2020321742833Open ↗
02/07/2019321742833Open ↗
07/27/2018321742833Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET7
06/12/2018321772505Open ↗
05/29/2018321742833Open ↗
04/16/2018321742815Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM2
10/21/2019321742815Open ↗
10/21/2019321742824Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
04/16/2018321742833Open ↗
▸BISSupporting Document: Fee Exempt1
12/13/2021321772505Open ↗