Senton Hotel
39 WEST 27 STREET · BIN 1015679
💬 Discuss this project
1891Year Built
7Stories
H3Building Class
M1-8A/R12Zoning
26,047 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Limited service hotel, often national chain · Owner of record: SENTON HOTEL WEST CORP · 4,938 sf lot · 5.27 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Bulkhead1p · 1 filing · 6 docs
Penthouse1p · 1 filing · 6 docs
Floor 7Under Construction4p · 2 filings · 12 docs
Floor 6Under Construction4p · 2 filings · 12 docs
Floor 5Under Construction4p · 2 filings · 12 docs
Floor 4Under Construction4p · 2 filings · 12 docs
Floor 3Under Construction4p · 2 filings · 12 docs
Floor 2Under Construction4p · 2 filings · 12 docs
Floor 1Under Construction3p · 2 filings · 20 docs
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HENDERSON HOLDING GROUP209/13/2026
SENTON HOTEL WEST CORP DBA SENTON H303/22/2026
SENTON HOTEL WEST CORP 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JD ENGINEERING PC308/24/2026
URBAN ARCHITECTURAL DESIGN, PC308/06/2026
ALEX TAGER111/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LGML GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKALL CONSTRUCTION CORPGeneral Contractor203/21/2026
SJ CONSTR DESIGN INCGeneral Contractor208/08/2026
FISHER, ALFREDElectrical103/21/2026
SHAHON, LEOElectrical103/21/2026
SICARI, RICHARDElectrical103/21/2026
DYKER SOLUTIONS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373208/06/2026
JD ENGINEERING PC9859107/28/2026
AFM INSPECTIONS & ENGINEE4675107/23/2026
ISHAC DESIGN ARCHITECTS P3918111/13/2023
Building Lifecycle
All (105)Filed (7)Permit Issued (4)Signed Off (1)Facade (FISP) (18)Violation (49)Special Inspection (26)
08/24/2026
Filed — Alteration
INSTALLATION OF NEW HEATING AND COOLING SYSTEM, DUCTWORK, AND VENTILATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01418372-I1
08/24/2026
Filed — Alteration
INSTALL NEW SPRINKLER SYSTEM AS PER PLAN.
M01427276-I1
08/21/2026
Special inspection requirement — Post-installed Anchors
08/21/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
08/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/07/2026
Permit issued — General Construction
M01430522-I1-GC
08/06/2026
Filed — Alteration
INTERIOR RENOVATION OF 2ND - 7TH FLOOR AT EXISTING HOTEL BUIDLING: REPLACE CARPETS IN HALLWAY, REPLACE TILE FRONT OF ELEVATOR AREA, REPLACE CARPETS IN ROOMS TO VINYL FLOOR. AND WALL PANEL. NO CHANGES TO EGRESS, USE AND OCCUPANCY.
M01430522-I1
07/28/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AS PER PLAN. THERE IS NO CHANGE OF USE, EGRESS, OR OCCUPANCY FILED UNDER THIS PLAN.
M01426059-I1
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
07/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
07/23/2026
Filed — Alteration
M01010171-P1
07/23/2026
Permit issued — General Construction
M01010171-I1-GC
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
07/07/2026
Special inspection requirement — Sprinkler Systems
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/17/2026
Special inspection requirement — Maintenance information
06/17/2026
Special inspection requirement — Ventilation and air distribution system
06/17/2026
Special inspection requirement — Shutoff dampers
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/17/2026
Special inspection requirement — Mechanical Systems
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/17/2026
Special inspection requirement — Post-installed Anchors
06/17/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
06/17/2026
Special inspection requirement — Smoke Control Systems Testing
06/17/2026
Special inspection requirement — Final
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
06/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/29/2026
Violation issued (HPD, open)
A
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
Anthony Marmo
04/02/2026
Special inspection requirement — Final
Anthony Marmo
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Marmo
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anthony Marmo
03/03/2026
Permit issued — General Construction
M01010171-I1-GC
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/04/2025
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
03/14/2024
Filed — Alteration
M01010171-I1
12/28/2023
Violation issued (ECB, closed)
Construction
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2023
Signed off — Alteration
M00961629-I1
11/17/2023
Permit issued — General Construction
M00961629-I1-GC
11/15/2023
Violation issued (HPD, closed)
I
11/13/2023
Filed — Alteration
M00961629-I1
04/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Violation issued (HPD, closed)
A
02/26/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2022
Violation issued (HPD, closed)
A
11/17/2021
Cycle 9 facade report submitted
11/16/2021
Cycle 9 facade report signed — SWARMP
10/19/2021
Cycle 9 facade inspection completed
04/01/2021
Violation issued (HPD, closed)
A
08/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/30/2019
Violation issued (ECB, closed)
Construction
06/20/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/30/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSJ CONSTR DESIGN INC08/07/2026
DOB NOWGeneral ConstructionPermit IssuedSJ CONSTR DESIGN INC07/23/2026
DOB NOWGeneral ConstructionPermit IssuedDYKER SOLUTIONS03/03/2026
DOB NOWGeneral ConstructionSigned-offROCKALL CONSTRUCTION CORP11/17/2023
BISEQISSUEDMBR CONTRACTING INC05/31/2011
BISOTISSUEDEBRO RESTRORATION CORP.12/21/2007
BISOTISSUEDFIRE BORO ROOFING & SHEET METAL04/23/2002
BISOTISSUEDRAND ENGINEERING P.C.02/11/2002
1 project · most recent 08/24/2026
FiledStatusContractorScope
08/24/2026———
2 projects · most recent 08/24/2026
Water/Sanitary
FiledStatusContractorScope
08/24/2026———
07/28/2026——Water/Sanitary
3 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026Permit IssuedKWONG MING ELECTRIC INC1 meters, 1 new_meters
05/20/2026Permit IssuedOHM PRO ELECTL CONST CORPGeneral Wiring
05/06/2026Permit IssuedKWONG MING ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/21/2026Post-installed Anchors—special
08/21/2026Exhaust and Vent Systems in Plenums and Ducts—special
08/21/2026Tenant Protection Plan Compliance—special
08/21/2026Fire-Resistant Penetrations and Joints—special
07/28/2026Fire-Resistant Penetrations and JointsZhao Dengspecial
07/28/2026Tenant Protection Plan ComplianceZhao Dengspecial
07/14/2026Fire-Resistant Penetrations and JointsKY FUspecial
07/07/2026Sprinkler Systems—special
06/17/2026HVAC-R and service water heating system controls—energy_progress
06/17/2026Maintenance information—energy_progress
06/17/2026Ventilation and air distribution system—energy_progress
06/17/2026Shutoff dampers—energy_progress
06/17/2026HVAC-R and service water heating equipment—energy_progress
06/17/2026Mechanical Systems—special
06/17/2026Fire-Resistant Penetrations and Joints—special
06/17/2026Post-installed Anchors—special
06/17/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
06/17/2026Smoke Control Systems Testing—special
06/17/2026Final—progress
06/17/2026Energy Code Compliance Inspections—progress
06/17/2026Duct leakage testing, insulation and design—energy_progress
06/17/2026HVAC-R and service water piping design and insulation—energy_progress
04/02/2026Fire-Resistance Rated ConstructionAnthony Marmoprogress
04/02/2026FinalAnthony Marmoprogress
04/02/2026Structural Stability – Alterations of existing buildingsAnthony Marmospecial
Latest 25 of 26.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026M00961629-I1Request digital key ↗
08/27/2026M01010171-P1Request digital key ↗
08/27/2026M01010171-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit7
08/27/2026M01010171-I1Open ↗
08/27/2026M01010171-P1Open ↗
08/25/2026M01427276-I1Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
06/03/2011120703097Open ↗
10/30/2007110001480Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/26/2011120703097Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026M00961629-I1Open ↗
08/27/2026M01010171-P1Open ↗
08/27/2026M01010171-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M01430522-I1Open ↗
08/28/2026M01010171-P1Open ↗
08/23/2026M01426059-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/26/2011120703097Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/26/2011120703097Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/26/2011120703097Open ↗
▸BISPC FULL REPORT1
10/26/2007110001480Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026M01010171-P1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWFDNY: Letter of No Objection1
08/25/2026M01427276-I1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist7
08/27/2026M01010171-P1Open ↗
08/25/2026M01427276-I1Open ↗
08/25/2026M01418372-I1Open ↗
Showing 3 of 7 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/06/2011120703097Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026M01010171-P1Open ↗
08/25/2026M01427276-I1Open ↗
08/25/2026M01418372-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/26/2011120703097Open ↗
10/26/2007110001480Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
05/26/2011120703097Open ↗
10/26/2007110001480Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01010171-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/26/2011120703097Open ↗