← Back
Big box retail (e.g., Costco, BJs)
3901 8 AVENUE
BROOKLYN · BIN 3017925
💬 Discuss this project
1931Year Built
1Stories
K8Building Class
M1-2Zoning
15,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Big box retail (e.g., Costco, BJs) · Owner of record: NORIS RLTY CORP · 15,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingOther
Floor 124p · 2 filings · 20 docs
Cellar21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORIS REALTY807/08/2026
PRAGMATIC DEVELOPERS203/22/2026
OCENA 39 ENTERPRISES INC103/22/2026
OCEAN 39 ENTERPRIZES103/22/2026
NEW STYLE PRODUCTIONS INC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO2003/21/2026
ECDESIGN STUDIO403/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor407/08/2026
KJK ELECTRIC INCElectrical203/22/2026
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
PRAGMATIC DEVELOPERS INCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376505/06/2026
SD TESTING & INSPECTION S7010310/01/2024
HRF SERVICES CORP5616202/28/2024
Building Lifecycle
All (123)Filed (15)Permit Issued (5)Signed Off (5)Violation (40)Inspection (10)Objection (18)Special Inspection (30)
05/19/2026
Special inspection requirement — Interior lighting power
Jian Yang
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/19/2026
Special inspection requirement — Maintenance information
Jian Yang
05/19/2026
Special inspection requirement — Fenestration areas
Jian Yang
05/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
05/19/2026
Special inspection requirement — Fenestration air leakage
Jian Yang
05/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jian Yang
05/19/2026
Special inspection requirement — Insulation placement and R values
Jian Yang
05/19/2026
Special inspection requirement — Air barrier - visual inspection
Jian Yang
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
05/19/2026
Special inspection requirement — Lighting controls
Jian Yang
05/06/2026
Filed — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-P5
05/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jian Yang
05/06/2026
Special inspection requirement — Air barrier - visual inspection
Jian Yang
05/06/2026
Special inspection requirement — Insulation placement and R values
Jian Yang
05/06/2026
Special inspection requirement — Lighting controls
Jian Yang
05/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
05/06/2026
Special inspection requirement — Fenestration air leakage
Jian Yang
05/06/2026
Special inspection requirement — Interior lighting power
Jian Yang
05/06/2026
Special inspection requirement — Fenestration areas
Jian Yang
05/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
05/06/2026
Special inspection requirement — Maintenance information
Jian Yang
09/08/2025
Special inspection requirement — Public Assembly Emergency Lighting
Jian Yang
08/27/2025
Filed — No Work
B01085987-P2
08/27/2025
Special inspection requirement — Public Assembly Emergency Lighting
Jian Yang
08/18/2025
Signed off — Alteration
TO RESOLVE ECB VIOLATION # 35668407J, REMOVE EXISTING AWNING AND INSTALL AN NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01218019-I1
08/18/2025
Signed off — Alteration
TO RESOLVE ECB VIOLATION # 35668407J, INSTALL AN NEW ILLUMINATED SIGN READ "MAX FUN LAND TRAMPOLINE PARK & ARCADE" AS PER PLAN. NO CHANGE IN USE,EGRESS, AND OCCUPANCY.
B01218020-I1
08/15/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
08/11/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/01/2025
Permit issued — Sign
B01218020-I1-SG
07/30/2025
Filed — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-P4
07/23/2025
Special inspection requirement — Insulation placement and R values
Jian Yang
07/23/2025
Special inspection requirement — Fenestration areas
Jian Yang
07/23/2025
Special inspection requirement — Fenestration air leakage
Jian Yang
07/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
07/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2025
Permit issued — General Construction
B01218019-I1-GC
04/30/2025
Filed — Alteration
TO RESOLVE ECB VIOLATION # 35668407J, REMOVE EXISTING AWNING AND INSTALL AN NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01218019-I1
04/30/2025
Filed — Alteration
TO RESOLVE ECB VIOLATION # 35668407J, INSTALL AN NEW ILLUMINATED SIGN READ "MAX FUN LAND TRAMPOLINE PARK & ARCADE" AS PER PLAN. NO CHANGE IN USE,EGRESS, AND OCCUPANCY.
B01218020-I1
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/23/2025
Violation issued (ECB, closed)
Construction
04/23/2025
Violation issued (ECB, closed)
Construction
04/23/2025
Violation issued (ECB, closed)
Construction
04/18/2025
Violation issued (ECB, closed)
Construction
11/25/2024
Signed off — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-S2
11/25/2024
Signed off — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-S4
11/06/2024
Filed — No Work
B01085987-P1
11/06/2024
Filed — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-P3
11/01/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2024
Permit issued — General Construction
B01075137-I1-GC
10/01/2024
Filed — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-P2
09/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2024
Filed — Alteration CO
FILING PLUMBING WORK TYPE FOR THE RENOVATION AT 1ST FLOOR., ROOF. PLUMBING WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS, OR OCCUPANCY.
B01075137-S4
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC08/01/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC05/05/2025
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC10/03/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.08/27/2024
DOB NOWSupport of ExcavationSigned-offPRAGMATIC DEVELOPERS INC02/20/2024
BISMHISSUEDGOOD-WILL MECHANICAL CORP.08/19/1998
BISOTISSUEDWASOFF PLUMB & UTILITY CO. INC.11/09/1994
BISPLISSUEDWASOFF PLUMB & UTILITY CO. INC.11/09/1994
BISBLISSUEDWASOFF PLBG & UTILITY CO06/25/1993
BISPLISSUEDWASOFF PLBG & UTILITY CO06/25/1993
1 project · most recent 05/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/06/2026Permit IssuedACER CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
York ZJ120N24R2A1AAA1A3 120,000 BTU · Rooftop Unit ×12
1 project · most recent 05/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2026Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
3 projects · most recent 07/31/2025
General Wiring
FiledStatusContractorScope
07/31/2025CancelledKJK ELECTRIC INC—
07/31/2025CompleteKJK ELECTRIC INC—
10/31/2024CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/15/2025Pass-Final Sign Permit InspectionPassView ↗
08/11/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/09/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2024Fail-Final CND-Occupancy InspectionFailView ↗
10/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
05/19/2026Fire-Resistant Penetrations and JointsJian Yangspecial
05/19/2026Energy Code Compliance InspectionsJian Yangprogress
05/19/2026Air barrier - visual inspectionJian Yangenergy_progress
05/19/2026Maintenance informationJian Yangenergy_progress
05/19/2026Fenestration areasJian Yangenergy_progress
05/19/2026Insulation placement and R valuesJian Yangenergy_progress
05/19/2026Interior lighting powerJian Yangenergy_progress
05/19/2026Lighting controlsJian Yangenergy_progress
05/19/2026Fenestration and door U-factor and product ratingsJian Yangenergy_progress
05/19/2026Fenestration air leakageJian Yangenergy_progress
05/19/2026Fire-Resistance Rated ConstructionJian Yangprogress
05/06/2026Insulation placement and R valuesJian Yangenergy_progress
05/06/2026Air barrier - visual inspectionJian Yangenergy_progress
05/06/2026Fenestration areasJian Yangenergy_progress
05/06/2026Interior lighting powerJian Yangenergy_progress
05/06/2026Fenestration air leakageJian Yangenergy_progress
05/06/2026Maintenance informationJian Yangenergy_progress
05/06/2026Lighting controlsJian Yangenergy_progress
05/06/2026Fenestration and door U-factor and product ratingsJian Yangenergy_progress
05/06/2026Fire-Resistance Rated ConstructionJian Yangprogress
05/06/2026Energy Code Compliance InspectionsJian Yangprogress
05/06/2026Fire-Resistant Penetrations and JointsJian Yangspecial
09/08/2025Public Assembly Emergency LightingJian Yangprogress
08/27/2025Public Assembly Emergency LightingJian Yangprogress
07/23/2025Fenestration and door U-factor and product ratingsJian Yangenergy_progress
Latest 25 of 87.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
08/21/2026B01218019-I1Request digital key ↗
08/21/2026B01218020-I1Request digital key ↗
08/17/2026B01075137-S4Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/24/2026B01085987-P1Request digital key ↗
08/24/2026B01085987-P2Request digital key ↗
08/24/2026B01085987-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/15/2026B01075137-I1Open ↗
08/13/2026B01075137-I1Open ↗
08/13/2026B01075137-P3Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature19
09/27/2026B01075137-I1Open ↗
09/27/2026B01075137-I1Open ↗
09/24/2026B01075137-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/26/2026B00960764-I1Open ↗
08/26/2026B00960764-P1Open ↗
08/24/2026B01085987-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/27/2026B01075137-I1Open ↗
09/24/2026B01075137-P1Open ↗
09/01/2026B00960764-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/17/2026B01075137-P5Open ↗
08/17/2026B01075137-P4Open ↗
08/17/2026B01075137-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01075137-P5Open ↗
08/17/2026B01075137-P4Open ↗
08/17/2026B01075137-P3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/17/2026B01075137-P5Open ↗
08/17/2026B01075137-P4Open ↗
08/17/2026B01075137-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00960764-I1Open ↗