← Back
Primarily 2 family with 1 store or office
3902 NEW UTRECHT AVENUE
BROOKLYN · Sunset Park (East)-Borough Park (West) · BIN 3135173
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R7AZoning
4,161 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · Owner of record: TRUE JESUS CHURCH IN BROOKLYN · 1,500 sf lot · 2.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Roof4p · 2 filings · 20 docs
Floor 39p · 3 filings · 20 docs
Floor 29p · 3 filings · 20 docs
Floor 110p · 3 filings · 19 docs
Cellar9p · 2 filings · 15 docs
Site & exterior5p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRUE JESUS CHURCH IN BROOKLYN1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/06/2017$1.5M—Private party → TRUE JESUS CHURCH IN BROOKLYN$350/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
K A INTERIOR DESIGN603/21/2026
CNY ENGINEERING PC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER POWER CONSTRUCTIONGeneral Contractor303/21/2026
RRP PLUMBING CORPFire Protection107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNY ENGINEERING P.C3304207/11/2023
FLUSHING ENGINEERING SERV4373202/13/2023
MW PROFESSIONAL ENGINEERI570108/27/2019
Building Lifecycle
All (62)Filed (6)Permit Issued (3)Signed Off (3)Inspection (3)Objection (34)Special Inspection (13)
08/22/2023
Signed off — Alteration
INSTALL NEW SPRINKLER SYSTEM FOR EXISTING 3-STORY BUILDING IN CONJUNCTION WITH DOB JOB#321384854.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B00489145-I1
07/13/2023
Special inspection requirement — Sprinkler Systems
YUE ZHOU
07/11/2023
Filed — Alteration
INSTALL NEW SPRINKLER SYSTEM FOR EXISTING 3-STORY BUILDING IN CONJUNCTION WITH DOB JOB#321384854.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B00489145-P1
07/10/2023
Special inspection requirement — Sprinkler Systems
YUE ZHOU
05/18/2023
Signed off — Alteration
INSTALL TWO COMBO BOILER ON 2ND AND 3RD FLOOR DWELLING UNIT, IN CONJUNCTION WITH JOB# 321384854.
B00684242-I1
05/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
04/11/2023
Special inspection requirement — Heating Systems
KY FU
04/11/2023
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
04/11/2023
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
04/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
03/02/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/13/2023
Filed — Alteration
INSTALL TWO COMBO BOILER ON 2ND AND 3RD FLOOR DWELLING UNIT, IN CONJUNCTION WITH JOB# 321384854.
B00684242-P1
02/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
02/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
02/07/2023
Special inspection requirement — Heating Systems
KY FU
02/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
02/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
01/04/2023
Permit issued — Boiler Equipment
B00684242-I1-BE
09/02/2022
Objection raised — Inspections
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Inspections
09/02/2022
Objection resolved — Addressed
09/02/2022
Objection raised — Structural
09/02/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Scope
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Structural
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Mechanical
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Fire_Protection
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Accessibility
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Scope
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Scope
08/29/2022
Objection resolved — Addressed
08/29/2022
Objection raised — Admin
08/29/2022
Objection resolved — Addressed
08/26/2022
Filed — Alteration
INSTALL TWO COMBO BOILER ON 2ND AND 3RD FLOOR DWELLING UNIT, IN CONJUNCTION WITH JOB# 321384854.
B00684242-I1
08/26/2022
Filed — No Work
B00784440-I1
07/30/2022
Special inspection requirement — Public Assembly Emergency Lighting
KY FU
10/25/2021
Permit issued — Sprinklers
B00489145-I1-EW-SP
09/21/2021
Signed off — Alteration
B00210307-I1
07/22/2021
Permit issued — Structural
B00210307-I1-ST
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDW PLUMBING INC01/04/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.10/25/2021
DOB NOWStructuralSigned-offSUPER POWER CONSTRUCTION07/22/2021
BIS—ISSUEDSUPER POWER CONSTRUCTION07/18/2022
BISPLISSUEDTRI STATE PLBG & HTG INC02/22/2021
BIS—ISSUEDSUPER POWER CONSTRUCTION02/22/2021
1 project · most recent 06/10/2022
General Wiring
FiledStatusContractorScope
06/10/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/13/2023Sprinkler SystemsYUE ZHOUspecial
07/10/2023Sprinkler SystemsYUE ZHOUspecial
04/11/2023HVAC-R and service water piping design and insulationKY FUenergy_progress
04/11/2023Heating SystemsKY FUspecial
04/11/2023HVAC-R and service water heating equipmentKY FUenergy_progress
04/11/2023HVAC-R and service water heating system controlsKY FUenergy_progress
04/11/2023Fire-Resistant Penetrations and JointsKY FUspecial
02/07/2023HVAC-R and service water piping design and insulationKY FUenergy_progress
02/07/2023Fire-Resistant Penetrations and JointsKY FUspecial
02/07/2023Heating SystemsKY FUspecial
02/07/2023HVAC-R and service water heating equipmentKY FUenergy_progress
02/07/2023HVAC-R and service water heating system controlsKY FUenergy_progress
07/30/2022Public Assembly Emergency LightingKY FUprogress
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
09/01/2026B00489145-P1Request digital key ↗
09/01/2026B00489145-I1Request digital key ↗
08/28/2026B00684242-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026B00784440-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00210307-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION13
06/21/2024320460504Open ↗
11/03/2023321384854Open ↗
04/19/2022321384854Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION2
02/22/2021321384854Open ↗
02/22/2021321384854Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/18/2023321384854Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026B00684242-I1Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
06/20/2024321384854Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/28/2024321384854Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B00684242-I1Open ↗
09/23/2026B00684242-I1Open ↗
09/23/2026B00684242-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00489145-P1Open ↗
09/01/2026B00489145-I1Open ↗
08/28/2026B00684242-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B00684242-I1Open ↗
09/23/2026B00684242-I1Open ↗
08/25/2026B00489145-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/11/2019321963808Open ↗
04/12/2012320460504Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/11/2019321963808Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING6
07/29/2021321384854Open ↗
07/19/2021321384854Open ↗
07/06/2021321384854Open ↗
Showing 3 of 6 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/26/2024321384854Open ↗
▸BISHEATING SYSTEMS1
06/21/2024321384854Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/26/2024321384854Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/11/2019321963808Open ↗
▸BISEQUIPMENT USE PERMITS1
07/31/2024321384854Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/09/2019321384854Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00489145-P1Open ↗
09/01/2026B00489145-I1Open ↗
08/28/2026B00684242-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00489145-P1Open ↗
08/13/2026B00489145-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/13/2019321963808Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/12/2012320460504Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
06/19/2024321384854Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/22/2020321384854Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/28/2024321384854Open ↗
01/26/2024321384854Open ↗
11/28/2023321384854Open ↗
Showing 3 of 5 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
01/26/2024321384854Open ↗
▸BISINTERIOR LIGHTING POWER1
01/26/2024321384854Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/26/2024321384854Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/26/2024321384854Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/28/2024321384854Open ↗
▸BISLIGHTING CONTROLS1
01/26/2024321384854Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00684242-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/02/2024321384854Open ↗
06/20/2024321384854Open ↗
05/28/2024321384854Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/21/2024321384854Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/01/2024321384854Open ↗
▸BISMASONRY1
06/21/2024321384854Open ↗
▸BISMECHANICAL SYSTEMS1
06/21/2024321384854Open ↗
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/01/2026B00489145-P1Open ↗
09/01/2026B00489145-I1Open ↗
08/13/2026B00684242-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
11/17/2020321384854Open ↗
01/09/2020321384854Open ↗
09/26/2019321384854Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
04/12/2012320460504Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/31/2020321384854Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT4
12/15/2020321384854Open ↗
01/31/2020321384854Open ↗
06/11/2019321963808Open ↗
Showing 3 of 4 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
11/28/2023321384854Open ↗
06/09/2022321384854Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/21/2024321384854Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION8
11/29/2023321384854Open ↗
06/10/2022321384854Open ↗
06/10/2022321384854Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET2
06/13/2019321963808Open ↗
04/12/2012320460504Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
10/23/2020321384854Open ↗