← Back
BuildNYC
Four families
391 4TH STREET
BROOKLYN · Park Slope · BIN 3021172
💬 Discuss this project
1920Year Built
4Stories
C3Building Class
R6BZoning
6,900 sfGross Floor Area
4Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Four families · Owner of record: Townhouse Rental · 2,185 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Apartment plumbing renovation5p · 1 filing · 7 docs
Floor 3Apartment plumbing renovation5p · 1 filing · 7 docs
Floor 2Apartment plumbing renovation5p · 1 filing · 7 docs
Floor 1Heavy duty sidewalk shed installation10p · 2 filings · 9 docs
CellarWood beam replacement and joist reinforcement6p · 3 filings · 16 docs
Sub-BasementWood beam replacement and joist reinforcement17p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Greenbrook Partners1207/08/2026
Townhouse Rental203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2020$5.5M—— → —$804/sf building
09/20/2019$3.5M—LINCOLN FOURTH LIMITED LIABILITY COMPANY → 391 4 ST, LLC$507/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services110/23/2023
PSI Agency203/24/2022
Cpengineering209/16/2021
Thomas Tsue Architect204/06/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group803/21/2026
LFNY Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJM Services PlumbingPlumbing607/08/2026
Elite Quality ConstructionGeneral Contractor203/21/2026
Neptune Mechanicalspecialty_contractor203/21/2026
AP Plumbing & HVACPlumbing207/08/2026
Safeline GroupScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254303/24/2022
Building Lifecycle
All (33)Filed (6)Permit Issued (6)Signed Off (4)Violation (14)Inspection (3)
06/24/2024
Violation issued (HPD, closed)
C
06/24/2024
Violation issued (HPD, closed)
C
06/08/2024
Violation issued (HPD, closed)
C
06/08/2024
Violation issued (HPD, closed)
C
12/04/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00951641-I1
10/23/2023
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00951641-I1
10/23/2023
Permit issued — Sidewalk Shed
B00951641-I1-SH
10/04/2022
Signed off — Alteration
B00579470-I1
08/23/2022
Signed off — Alteration
New Plumbing Fixtures in conjunction with renovation of apartments 1. 2 3, 4 on Floors 1 thru 4.
B00242264-I1
04/01/2022
Signed off — Alteration
B00560994-I1
03/24/2022
Filed — Alteration
B00560994-P1
02/18/2022
Violation issued (HPD, closed)
A
01/04/2022
Permit issued — Structural
B00560994-I1-ST
01/03/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/29/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/29/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/03/2021
Permit issued — Plumbing
B00579470-I1-PL
10/25/2021
Permit issued — Structural
B00560994-I1-ST
10/06/2021
Filed — Alteration
B00560994-I1
09/16/2021
Filed — Alteration
B00579470-I1
08/17/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
09/02/2020
Permit issued — Plumbing
B00242264-I1-PL
04/06/2020
Filed — Alteration
New Plumbing Fixtures in conjunction with renovation of apartments 1. 2 3, 4 on Floors 1 thru 4.
B00242264-S1
12/07/2019
Violation issued (ECB, closed)
Unknown
12/07/2019
Violation issued (ECB, closed)
Unknown
12/02/2019
Violation issued (HPD, closed)
A
12/02/2019
Violation issued (HPD, closed)
B
12/02/2019
Violation issued (HPD, closed)
A
11/20/2019
Violation issued (ECB, closed)
Construction
10/29/2019
Permit issued — Plumbing
B00242264-I1-PL
10/28/2019
Filed — Alteration
New Plumbing Fixtures in conjunction with renovation of apartments 1. 2 3, 4 on Floors 1 thru 4.
B00242264-I1
10/06/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSafeline Group10/23/2023
DOB NOWStructuralSigned-offNeptune Mechanical01/04/2022
DOB NOWPlumbingSigned-offJJM Services Plumbing11/03/2021
DOB NOWStructuralSigned-offElite Quality Construction10/25/2021
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating09/02/2020
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating10/29/2019
BISOTISSUEDAki Renovations Group07/06/2020
BISOTISSUEDAki Renovations Group10/23/2019
1 project · most recent 04/06/2020
Gas Water/Sanitary
FiledStatusContractorScope
04/06/2020Signed-offAP Plumbing & HVACGas, Water/Sanitary
2 projects · most recent 10/23/2023
General Wiring
FiledStatusContractorScope
10/23/2023Permit IssuedRichard Neu—
05/27/2020CompleteValentis ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
01/03/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/29/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/29/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
09/03/2026B00579475-I1Request digital key ↗
09/01/2026B00579470-I1Request digital key ↗
09/01/2026B00560994-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00242264-S1Request digital key ↗
09/02/2026B00242264-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
03/27/2020322001141Open ↗
10/24/2019322001141Open ↗
▸BISWORK PERMIT APPLICATION2
11/12/2019322001141Open ↗
10/24/2019322001141Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00579470-I1Open ↗
09/01/2026B00560994-P1Open ↗
09/01/2026B00560994-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/24/2019322001141Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/24/2019322001141Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/24/2019322001141Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
11/15/2019322001141Open ↗
10/24/2019322001141Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00242264-S1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00579470-I1Open ↗
09/01/2026B00560994-P1Open ↗
09/01/2026B00560994-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2019322001141Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/22/2020322001141Open ↗
12/22/2020322001141Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/24/2019322001141Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/22/2020322001141Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/29/2020322001141Open ↗
12/29/2020322001141Open ↗
12/22/2020322001141Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/29/2020322001141Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
12/22/2020322001141Open ↗
10/24/2019322001141Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
10/24/2019322001141Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
03/31/2020322001141Open ↗
03/31/2020322001141Open ↗
03/31/2020322001141Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
03/31/2020322001141Open ↗
▸BISEFILING COVER SHEET1
10/23/2019322001141Open ↗