← Back
BuildNYC
Two family brick
392 GRAND AVENUE
BROOKLYN · Clinton Hill · BIN 3056774
💬 Discuss this project
1864Year Built
3Stories
B1Building Class
R6BZoning
1,920 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Two family brick · 2,065 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFire damage restoration and structural repairUnder Construction3p · 1 filing · 20 docs
Floor 3Fire damage restoration and structural repairUnder Construction12p · 1 filing · 20 docs
Floor 2Fire damage restoration and structural repairUnder Construction12p · 1 filing · 20 docs
Floor 1Fire damage restoration and structural repairUnder Construction12p · 1 filing · 20 docs
CellarFire damage restoration and structural repairUnder Construction13p · 1 filing · 20 docs
BasementFire damage restoration and structural repairUnder Construction1p · 1 filing · 20 docs
Sub-BasementFire damage restoration and structural repairUnder Construction12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul J. Angelides, P.E208/13/2025
Angelique Pierre Architect208/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maryclare Nepogoda403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ati Restoration of Metrospecialty_contractor808/08/2026
Brookyln SolarworksElectrical103/22/2026
Infiniti Esc PlumbingPlumbing107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423208/13/2025
Building Lifecycle
09/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2026
Permit renewed — General Construction
Renewed without changes
B01255842-I1-GC
08/07/2026
Permit renewed — Mechanical Systems
Renewed without changes
B01255842-S3-MS
08/07/2026
Permit renewed — Structural
Renewed without changes
B01255842-S2-ST
07/21/2026
Permit issued — Plumbing
B01255842-S1-PL
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAti Restoration of Metro08/07/2026
DOB NOWMechanical SystemsPermit IssuedAti Restoration of Metro08/07/2026
DOB NOWStructuralPermit IssuedAti Restoration of Metro08/07/2026
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing07/21/2026
DOB NOWMechanical SystemsPermit IssuedAti Restoration of Metro02/19/2026
DOB NOWStructuralPermit IssuedAti Restoration of Metro02/18/2026
DOB NOWGeneral ConstructionPermit IssuedAti Restoration of Metro01/21/2026
BISOTISSUEDBrooklyn Solarworks06/22/2020
BIS—ISSUEDOwner01/26/2004
1 project · most recent 08/13/2025
Heating and Air Conditioning Systems
FiledStatusContractorScope
08/13/2025Permit IssuedAti Restoration of MetroHeating and Air Conditioning Systems
1 project · most recent 08/13/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/13/2025Permit IssuedInfiniti Esc PlumbingGas, Water/Sanitary
3 projects · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026Permit IssuedMulti-Tech ElectricGeneral Wiring
05/01/2024Permit IssuedAll Ways Electric Corp.w—
07/09/2020CompleteBrookyln Solarworks—
1 project · most recent 08/13/2025
Wood
FiledStatusContractorScope
08/13/2025Permit IssuedAti Restoration of MetroWood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
07/16/2025Ventilation and air distribution systemYoung Suhenergy_progress
07/16/2025Lighting in dwelling unitsAngelique Pierreenergy_progress
07/16/2025Concrete - Cast-In-PlaceYoung Suhspecial
07/16/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
07/16/2025MasonryYoung Suhspecial
07/16/2025Subgrade InspectionsYoung Suhspecial
07/16/2025Structural Stability – Alterations of existing buildingsYoung Suhspecial
07/16/2025FinalYoung Suhprogress
07/16/2025Structural Wood FrameYoung Suhprogress
07/16/2025Mechanical SystemsYoung Suhspecial
07/16/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
07/16/2025FinalYoung Suhprogress
07/16/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
07/16/2025HVAC-R and service water heating equipmentYoung Suhenergy_progress
07/16/2025Maintenance informationYoung Suhenergy_progress
07/16/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
07/15/2025FinalAngelique Pierreprogress
45 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account