| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01255842 ↗ | 392 GRAND AVENUE BROOKLYN | Alteration | Permit Issued | 08/11/2025 | 08/07/2026 | Design PAUL J. ANGELIDES, P.E. P.C. Filer MARYCLARE NEPOGODA | structural corrective work for repair and restoration of fire damage, total square footages 500 sf floors bsmt., 1,2,3. |
| M01308482 ↗ | 25 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2025 | 08/07/2026 | Owner THE LOVETT GROUP | Interior renovation of Apartment #6G on the 6th floor. No change to use, egress or occupancy. |
| B00987574 ↗ | 731 SHEFFIELD AVENUE BROOKLYN | Alteration | Signed-off | 03/12/2024 | 12/31/2025 | Design THINK DESIGN ARCHITECTURE | Filed for the interior alteration & rehabilitation of exist 2-story 4-family building with cellar due to fire damage. Scope of work includes… |
| Q01042937 ↗ | 67-92 GROTON STREET QUEENS | Alteration | Signed-off | 05/03/2024 | 05/10/2024 | REPAIR DAMAGE CAUSED BY FIRE. REPLACE DAMAGED FLOOR BEAMS ON FIRST FLOOR WITH NEW IN EXISTING LOCATION. ALL NEW FLOOR FINISHES. REPLACE DAMA… | |
| M00639672 ↗ | 303 EAST 37TH STREET MANHATTAN | Alteration | Signed-off | 01/31/2022 | 05/07/2024 | Design RAK DESIGN INC. Owner JOHN B LOVETT Filer CSR EXPEDITERS | Interior renovation of floors 1 and 6, replacement of existing nonload bearing partitions, ceilings and flooring. Patch, paint in selectiv… |
| Q00953525 ↗ | 132-11 131ST AVENUE QUEENS | Alteration | Signed-off | 11/10/2023 | 12/08/2023 | REPAIR DAMAGE CAUSED BY FIRE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| H3 Workshop Architecture Design | 2 | 05/03/2024 |
| Angelique Pierre Architect | 1 | 08/13/2025 |
| Grant Engineering | 1 | 08/23/2022 |
| Moschella Roberts Architects | 1 | 12/09/2025 |
| Paul J. Angelides, P.E. | 1 | 08/13/2025 |
| Rak Design | 1 | 11/02/2023 |
| Think Design Architecture | 1 | 12/29/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Big Apple Sewer & Drain I | 1 | 01/08/2024 |
| Infiniti Esc Plumbing | 1 | 08/13/2025 |
| Xpress Plumbing and Heating | 1 | 12/29/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| John B. Lovett & Associates | 1 | 11/02/2023 |
| The Lovett Group | 1 | 12/09/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| City Wide Expediting | 1 | 05/03/2024 |
| CSR Expediters | 1 | 11/02/2023 |
| J. Callahan Consulting | 1 | 12/09/2025 |
| Maryclare Nepogoda | 1 | 08/13/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01255842 ↗ | 392 GRAND AVENUE BROOKLYN | Alteration | Permit Issued | 08/11/2025 | 08/07/2026 | Design PAUL J. ANGELIDES, P.E. P.C. Filer MARYCLARE NEPOGODA | structural corrective work for repair and restoration of fire damage, total square footages 500 sf floors bsmt., 1,2,3. |
| M01308482 ↗ | 25 5TH AVENUE MANHATTAN | Alteration | Permit Issued | 12/09/2025 | 08/07/2026 | Owner THE LOVETT GROUP | Interior renovation of Apartment #6G on the 6th floor. No change to use, egress or occupancy. |
| B00987574 ↗ | 731 SHEFFIELD AVENUE BROOKLYN | Alteration | Signed-off | 03/12/2024 | 12/31/2025 | Design THINK DESIGN ARCHITECTURE | Filed for the interior alteration & rehabilitation of exist 2-story 4-family building with cellar due to fire damage. Scope of work includes… |
| Q01042937 ↗ | 67-92 GROTON STREET QUEENS | Alteration | Signed-off | 05/03/2024 | 05/10/2024 | REPAIR DAMAGE CAUSED BY FIRE. REPLACE DAMAGED FLOOR BEAMS ON FIRST FLOOR WITH NEW IN EXISTING LOCATION. ALL NEW FLOOR FINISHES. REPLACE DAMA… | |
| M00639672 ↗ | 303 EAST 37TH STREET MANHATTAN | Alteration | Signed-off | 01/31/2022 | 05/07/2024 | Design RAK DESIGN INC. Owner JOHN B LOVETT Filer CSR EXPEDITERS | Interior renovation of floors 1 and 6, replacement of existing nonload bearing partitions, ceilings and flooring. Patch, paint in selectiv… |
| Q00953525 ↗ | 132-11 131ST AVENUE QUEENS | Alteration | Signed-off | 11/10/2023 | 12/08/2023 | REPAIR DAMAGE CAUSED BY FIRE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| B00795323 ↗ | 876 EAST 14TH STREET BROOKLYN | Alteration | Signed-off | 08/23/2022 | 08/31/2022 | Design GRANT ENGINEERING | LEGALIZATION OF REPAIRS TO STRUCTURAL WOOD FRAMING PERFORMED ON PORTION OF THE INTERIOR OF EXPOSURE 4 (NORTH WALL), 1ST AND 2ND FLOORS. NO C… |
| 440637964BIS | 172-35 GRAND CENTRAL PARKWAY QUEENS | — | ISSUED | 12/10/2020 | 12/10/2020 | — | OT |
| 340678216BIS | 484 BRADFORD STREET BROOKLYN | — | ISSUED | 05/17/2019 | 05/17/2019 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 392 GRAND AVENUE ↗ | 8 | 08/08/2026 |
| 25 5TH AVENUE ↗ | 2 | 08/08/2026 |
| 67-92 GROTON STREET ↗ | 3 | 03/21/2026 |
| 303 EAST 37TH STREET ↗ | 12 | 03/21/2026 |
| 731 SHEFFIELD AVENUE ↗ | 1 | 04/09/2026 |
| 132-11 131ST AVENUE ↗ | 3 | 03/21/2026 |
| 876 EAST 14TH STREET ↗ | 3 | 03/21/2026 |
| 172-35 GRAND CENTRAL PARKWAY ↗ | 1 | 12/10/2020 |
| 484 BRADFORD STREET ↗ | 1 | 05/17/2019 |