← Back
One story retail building
3949 WHITE PLAINS ROAD
BRONX · BIN 2062970
💬 Discuss this project
1928Year Built
1Stories
K1Building Class
R6Zoning
31,690 sfGross Floor Area
10Units
2 Open Violations 0 unresolved · 2 paperwork only ▸
One story retail building · Owner of record: WHITE PLAINS RD REALTY · 18,320 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 8 docs
Floor 113p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JEM REALTY1807/08/2026
WHITE PLAINS RD REALTY1903/22/2026
JEM REALTY MANAGEMENT903/21/2026
WHITE PLAINS REALTY403/21/2026
40 FLATBUSH REALTY ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZELTA DESIGN409/26/2024
ALPHA HOME DESIGN LLC102/20/2024
HRM ENGINEERING SERVICES, PC310/19/2023
MOHAMMAD AHEAD, PE111/28/2022
JRS ARCHITECT, PC110/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
EPAC BUILDING CONSULTING INC803/21/2026
INDESIGN STUDIO203/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MALTA ENTERPRISES INCGeneral Contractor407/08/2026
L & N PLUMBING, INCPlumbing307/08/2026
PIPESTYLISTS, INCPlumbing307/08/2026
ALL AMERICAN CONSTRUCTIONGeneral Contractor307/08/2026
SILVER, HUGHElectrical103/21/2026
SITRUK, MAURICEElectrical103/21/2026
TOUEY, CHRISTOPHERElectrical103/21/2026
GOING SIGN SVCNGScaffold107/08/2026
ALEXANDRINI, VINCENTElectrical103/21/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
BAIN, GElectrical103/21/2026
MERCURY PLBG & HTG COElectrical103/21/2026
METAL CRAFTS BY N BARSILYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZELTA INSPECT LLC7764209/26/2024
YAN GAO6619102/20/2024
JOSEPH MARTINES PE, PLLC1428410/19/2023
Building Lifecycle
All (79)Filed (10)Permit Issued (9)Signed Off (6)Violation (17)Inspection (7)Special Inspection (30)
09/27/2024
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00950788-I1
09/26/2024
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00950788-P2
09/26/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
09/26/2024
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
09/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
09/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
09/26/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
09/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
09/26/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
09/26/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
09/26/2024
Special inspection requirement — Final
ERIK LIEPINS
09/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
09/26/2024
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
09/26/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
09/24/2024
Special inspection requirement — Maintenance information
ERIK LIEPINS
09/24/2024
Special inspection requirement — Duct leakage testing, insulation and design
ERIK LIEPINS
09/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIK LIEPINS
09/24/2024
Special inspection requirement — Lighting controls
ERIK LIEPINS
09/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIK LIEPINS
09/24/2024
Special inspection requirement — Exterior lighting power
ERIK LIEPINS
09/24/2024
Special inspection requirement — Interior lighting power
ERIK LIEPINS
09/24/2024
Special inspection requirement — Shutoff dampers
ERIK LIEPINS
09/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIK LIEPINS
09/24/2024
Special inspection requirement — Final
ERIK LIEPINS
09/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK LIEPINS
09/24/2024
Special inspection requirement — Mechanical Systems
ERIK LIEPINS
09/24/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIK LIEPINS
09/12/2024
Signed off — Alteration
ERECT AN ILLUMINATED SIGN ON WALL. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01008134-I1
05/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2024
Permit issued — Plumbing
X07994833-I1-PL
05/06/2024
Signed off — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00950788-S2
02/27/2024
Permit issued — Sign
X01008134-I1-SG
02/20/2024
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01008134-I1
01/26/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/26/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2023
Permit issued — Construction Fence
X00950788-S2-FN
12/04/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00950788-S2
11/21/2023
Permit issued — General Construction
X00950788-I1-GC-CX
11/15/2023
Permit issued — Plumbing
X00950788-S1-PL
11/07/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00950788-I1
11/07/2023
Filed — Alteration
PROPOSED RENOVATION AT EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00950788-S1
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH MARTINES
10/19/2023
Filed — Alteration
PLUMBING SYSTEM INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGGE TO USE, EGRESS, OR OCCUPANCY.
X07994833-P1
10/18/2023
Signed off — Alteration
AC SYSTEM INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X07995058-I1
10/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH MARTINES
03/31/2023
Signed off — Alteration
X07994964-I1
02/28/2023
Signed off — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - RIDGEWOOD SAVINGS BANK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X08036185-I1
02/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/16/2023
Violation issued (ECB, closed)
Construction
12/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2022
Permit issued — Sign
X08036185-I1-SG
11/28/2022
Filed — Alteration
ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - RIDGEWOOD SAVINGS BANK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X08036185-I1
11/28/2022
Special inspection requirement — Final
MOHAMMAD AHEAD
11/16/2022
Permit issued — Mechanical Systems
X07995058-I1-MS
11/15/2022
Permit issued — Plumbing
X07994833-I1-PL
11/07/2022
Filed — Alteration
AC SYSTEM INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X07995058-I1
11/01/2022
Permit issued — General Construction
X07994964-I1-GC
10/13/2022
Filed — Alteration
X07994964-I1
09/21/2022
Filed — Alteration
PLUMBING SYSTEM INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGGE TO USE, EGRESS, OR OCCUPANCY.
X07994833-I1
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL & N PLUMBING, INC05/08/2024
DOB NOWSignSigned-offDESTHERS, JOSEPH02/27/2024
DOB NOWConstruction FenceSigned-offALL AMERICAN CONSTRUCTION12/06/2023
DOB NOWGeneral ConstructionSigned-offALL AMERICAN CONSTRUCTION11/21/2023
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC11/15/2023
DOB NOWSignSigned-offPOLSINELLI, HENRY12/01/2022
DOB NOWMechanical SystemsSigned-offMALTA ENTERPRISES INC11/16/2022
DOB NOWPlumbingSigned-offL & N PLUMBING, INC11/15/2022
DOB NOWGeneral ConstructionSigned-offMALTA ENTERPRISES INC11/01/2022
BISMHISSUEDCOMJEM ASSOCIATES LTD12/11/2018
BIS—ISSUEDNORTH SHORE NEON SIGN CO04/01/2014
BISEQISSUEDS S BRIDGING & SCAFFOLDIN07/22/2013
BISOTISSUEDBROOKLYN HOME IMPROVEMENT06/06/2013
BISOTISSUEDBROOKLYN HOME IMPROVEMENT06/06/2013
BISOTISSUEDBROOKLYN HOME IMPROVEMENT06/06/2013
BISEQISSUEDBROOKLYN HOME IMPROVEMENT06/06/2013
BISOTISSUEDP & J RENOVATIONS INC04/17/2013
BISEQISSUEDP & J RENOVATIONS INC04/17/2013
BISOTISSUEDBUILDING CONCEPTS INC10/03/2012
BISEQISSUEDBUILDING CONCEPTS INC10/03/2012
BISOTISSUEDP & J RENOVATIONS INC10/11/2011
BISEQISSUEDP & J RENOVATIONS INC10/11/2011
BISOTISSUEDP & J RENOVATIONS INC10/21/2010
BISEQISSUEDP & J RENOVATIONS INC10/21/2010
BISEQRE-ISSUEDP & J RENOVATIONS INC05/27/2009
BISEQISSUEDP & J RENOVATIONS INC07/29/2008
BISPLISSUEDROSS RUSSO PLG & HTG. INC.10/30/2007
BISEQISSUEDP & J RENOVATIONS INC10/26/2007
BISMHISSUEDP & J RENOVATIONS INC10/26/2007
BISOTISSUEDGI ASSOCIATES INC.04/24/2003
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/21/2002
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/21/2002
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/21/2002
BIS—ISSUEDBERGER SIGN FABRICATION INC.02/21/2002
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/21/2002
BIS—RE-ISSUEDULTIMATE SIGNS&DESIGNS CO02/21/2002
BIS—ISSUEDULTIMATE SIGNS&DESIGNS CO02/21/2002
BISOTISSUEDFISHER DEVELOPMENT INC01/10/2002
BISFPISSUEDACTIVE FIRE CONTROL CO/ACTIVE FI01/09/2002
BISPLISSUEDC JAMES PLBG & HTG INC12/17/2001
+ 18 more permits on file
1 project · most recent 09/26/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/26/2024Signed-offALL AMERICAN CONSTRUCTIONAir Conditioning Systems
Cooling
Gree GMV-V60WL/C-T(U) 60,000 BTU · Vrf Outdoor ×2
Trane YSC060A3EHA01 5 tons · Rooftop Unit ×2
2 projects · most recent 09/26/2024
Water/Sanitary Gas
FiledStatusContractorScope
09/26/2024Permit IssuedT & T PLUMBING INCGas, Water/Sanitary
10/19/2023Signed-offL & N PLUMBING, INCWater/Sanitary
2 projects · most recent 02/20/2024
General Wiring
FiledStatusContractorScope
02/20/2024Permit IssuedKJK ELECTRIC INCGeneral Wiring
12/15/2022CompleteRAINBOW ELECTRIC CO., INC—
1 project · most recent 09/26/2024
Fence
FiledStatusContractorScope
09/26/2024Signed-offALL AMERICAN CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
09/26/2024Interior lighting powerERIK LIEPINSenergy_progress
09/26/2024Shutoff dampersERIK LIEPINSenergy_progress
09/26/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
09/26/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
09/26/2024Maintenance informationERIK LIEPINSenergy_progress
09/26/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
09/26/2024Mechanical SystemsERIK LIEPINSspecial
09/26/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
09/26/2024Energy Code Compliance InspectionsERIK LIEPINSprogress
09/26/2024FinalERIK LIEPINSprogress
09/26/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
09/26/2024Exterior lighting powerERIK LIEPINSenergy_progress
09/26/2024Lighting controlsERIK LIEPINSenergy_progress
09/24/2024Maintenance informationERIK LIEPINSenergy_progress
09/24/2024Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
09/24/2024HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
09/24/2024Lighting controlsERIK LIEPINSenergy_progress
09/24/2024HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
09/24/2024Exterior lighting powerERIK LIEPINSenergy_progress
09/24/2024Interior lighting powerERIK LIEPINSenergy_progress
09/24/2024Shutoff dampersERIK LIEPINSenergy_progress
09/24/2024HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
09/24/2024FinalERIK LIEPINSprogress
09/24/2024Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
09/24/2024Mechanical SystemsERIK LIEPINSspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ridgewood Savings BankOtherFloors 1–3
Project X08036185 Alteration · LOC Issued · 11/28/2022
Project X07994833 Alteration · Permit Entire · 09/21/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026X07994833-P1Request digital key ↗
08/24/2026X07994833-I1Request digital key ↗
08/23/2026X07994964-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION26
04/26/2023200419966Open ↗
02/28/2022200419966Open ↗
12/27/2021200711024Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION22
12/20/2018220679503Open ↗
04/02/2014220350938Open ↗
07/21/2013240030952Open ↗
Showing 3 of 22 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
01/09/2019220679503Open ↗
01/09/2019220679503Open ↗
01/09/2019220679503Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026X07994833-I1Open ↗
08/23/2026X07994964-I1Open ↗
08/22/2026X00950788-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026X08036185-I1Open ↗
08/26/2026X00950788-P2Open ↗
08/26/2026X00950788-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
12/12/2018220679503Open ↗
04/02/2014220350938Open ↗
05/28/2013220291645Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/28/2013220291645Open ↗
05/28/2013220291645Open ↗
04/16/2013220284751Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026X07994833-I1Open ↗
08/27/2026X07994833-P1Open ↗
08/26/2026X00950788-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/12/2018220679503Open ↗
04/02/2014220350938Open ↗
07/21/2013240030952Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/21/2013240030952Open ↗
▸BISPC FULL REPORT1
10/27/2007210020421Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/21/2013240030952Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
04/16/2013220284751Open ↗
07/29/2008210061305Open ↗
12/27/2007210020421Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
03/28/2008210020421Open ↗
01/04/2008210020421Open ↗
11/28/2007210020421Open ↗
▸BISEQUIPMENT USE PERMITS1
01/09/2019220679503Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/09/2019220679503Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/16/2013220284751Open ↗
▸BISSTREET TREE CHECKLIST1
07/29/2008210061305Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026X07994833-I1Open ↗
08/23/2026X07994964-I1Open ↗
08/22/2026X00950788-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/29/2008210061305Open ↗
10/27/2007210020421Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/02/2014220350938Open ↗
04/17/2013220284751Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
12/19/2018220679503Open ↗
12/12/2018220679503Open ↗
05/28/2013220291645Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/17/2023220291645Open ↗
11/08/2022220291645Open ↗
11/08/2022220291645Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/08/2022220291645Open ↗
11/03/2022220284751Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
04/17/2023220291645Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/19/2018220679503Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
04/17/2023220291645Open ↗
▸BISFENESTRATION AREAS1
04/17/2023220291645Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/17/2023220291645Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY8
04/17/2023220291645Open ↗
11/08/2022220291645Open ↗
11/08/2022220291645Open ↗
Showing 3 of 8 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
11/02/2022200782714Open ↗
11/02/2022200587882Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/17/2023220291645Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
04/17/2023220291645Open ↗
▸BIS* WELDING 27-6161
11/02/2022200782714Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/17/2023220291645Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/17/2023220291645Open ↗
▸BIS* EXIT SIGNS1
04/17/2023220291645Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
11/02/2022240030952Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
04/18/2023220291645Open ↗
11/04/2022220284751Open ↗
11/04/2022220284751Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/16/2013220284751Open ↗
07/30/2008210061305Open ↗
10/27/2007210020421Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF2
11/08/2022220291645Open ↗
11/03/2022220284751Open ↗
▸BISSUPERSEDING LETTER1
06/11/2013220284751Open ↗
▸BISFINAL1
11/02/2022210061305Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT11
01/09/2019220679503Open ↗
12/12/2018220679503Open ↗
07/14/2014220350938Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/08/2022220291645Open ↗
11/03/2022220284751Open ↗
11/02/2022210061305Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
12/12/2018220679503Open ↗
04/02/2014220350938Open ↗
05/28/2013220291645Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
01/09/2019220679503Open ↗
12/19/2018220679503Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/21/2013240030952Open ↗
▸Other Documents1
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
11/02/2022200587882Open ↗