Walk-up apt, over six families with stores
396 3 AVENUE
MANHATTAN · BIN 1018220
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
C2-8Zoning
6,970 sfGross Floor Area
9Units
Rent Stabilized7 Open Violations ▸
Walk-up apt, over six families with stores · 1,550 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 13p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
POKPOON REALTY1707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI511/14/2023
BCHEN ARCHITECT PLLC609/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
BUILD TEAM1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
BEST PLUMBING & HVAC INCPlumbing207/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394210/11/2023
HSU & ASSOCIATES8025609/27/2023
YAO W GUO ARCHITECT P.C.1754105/18/2023
Building Lifecycle
All (73)Filed (11)Permit Issued (6)Signed Off (6)Violation (25)Inspection (9)Special Inspection (16)
05/15/2026
Violation issued (HPD, open)
C
04/29/2026
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
04/01/2024
Violation issued (HPD, closed)
A
01/29/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00942574-I1
01/19/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/05/2024
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00942577-I1
01/05/2024
Signed off — Alteration
INSTALL NEW ILLUMINATED SIGN READ "BLUE MOUNTAIN SUSHI & ASIAN CUISINE BAR & LOUNGE" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M00956969-I1
12/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/14/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
12/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/07/2023
Permit issued — Sign
M00956969-I1-SG
11/14/2023
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00942577-P1
11/14/2023
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00942574-P1
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/09/2023
Permit issued — Plumbing
M00942577-I1-PL
11/07/2023
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "BLUE MOUNTAIN SUSHI & ASIAN CUISINE BAR & LOUNGE" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
M00956969-I1
10/16/2023
Permit issued — General Construction
M00942574-I1-GC
10/11/2023
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH GENERAL CONSTRUCTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00942574-I1
10/11/2023
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR WITH PLUMBING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00942577-I1
10/03/2023
Signed off — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-S2
09/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/27/2023
Filed — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-P3
09/27/2023
Signed off — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-S1
09/27/2023
Signed off — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-I1
09/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
09/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/18/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/11/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
billy chen
08/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
billy chen
08/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Chih Hsu
08/08/2023
Filed — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-P1
08/08/2023
Filed — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-P2
08/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
billy chen
08/04/2023
Special inspection requirement — Tenant Protection Plan Compliance
08/04/2023
Special inspection requirement — HVAC-R and service water heating equipment
billy chen
07/27/2023
Permit issued — General Construction
M00876552-I1-GC
07/14/2023
Permit issued — Boiler Equipment
M00876552-S1-BE
07/07/2023
Permit issued — Plumbing
M00876552-S2-PL
05/18/2023
Filed — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-S2
05/18/2023
Filed — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-S1
05/18/2023
Filed — Alteration
install new room for existing gas fire hot water heater and repair and or replace existing exterior mounted boiler flue to the roof. No change to use, egress or occupancy.
M00876552-I1
05/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
Chih Hsu
05/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
billy chen
05/17/2023
Special inspection requirement — Final
billy chen
05/17/2023
Special inspection requirement — Chimneys and vents
Yao Guo
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2023
Violation issued (HPD, open)
B
02/23/2023
Violation issued (HPD, closed)
A
02/23/2023
Violation issued (HPD, open)
B
02/23/2023
Violation issued (HPD, open)
B
02/23/2023
Violation issued (HPD, open)
C
01/16/2022
Violation issued (HPD, closed)
B
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC12/07/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG11/09/2023
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/16/2023
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN07/27/2023
DOB NOWBoiler EquipmentSigned-offBEST PLUMBING & HVAC INC07/14/2023
DOB NOWPlumbingSigned-offBEST PLUMBING & HVAC INC07/07/2023
BISPLISSUEDS & L PLUMBING INC05/06/2009
BISOTISSUEDCPC MAJOR CONSTRUCTION03/03/2009
BISPLISSUEDS & L PLUMBING INC02/06/2009
BISOTISSUEDCPC MAJOR CONSTRUCTION02/04/2009
BISEQISSUEDCPC MAJOR CONSTRUCTION02/04/2009
BISEQISSUEDC PC MAJOR CONSTRUCTION CORP07/28/2008
BISOTISSUEDC PC MAJOR CONSTRUCTION CORP07/28/2008
BIS—ISSUEDNEW YORK SIGN CONTRACTORS04/04/2007
BISFPISSUEDMEGA FIRE PROTECTION INC05/02/2002
BISMHISSUEDGEORGE CHO CONT. INC.03/09/1992
BISFPISSUEDFIRE FOE CORP10/31/1991
BISEQISSUEDGEORGE CHO CONT. INC.07/11/1991
2 projects · most recent 11/21/2023
FiledStatusContractorScope
11/21/2023CompleteKJK ELECTRIC INC—
11/08/2023CancelledKJK ELECTRIC INC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/19/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/14/2023Pass-Final Sign Permit InspectionPassView ↗
12/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/11/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/14/2023Tenant Protection Plan Compliance—special
11/14/2023Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
11/14/2023Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
11/14/2023Tenant Protection Plan Compliance—special
09/27/2023Tenant Protection Plan Compliance—special
09/27/2023Fire-Resistant Penetrations and JointsChih Hsuspecial
08/09/2023HVAC-R and service water piping design and insulationbilly chenenergy_progress
08/09/2023HVAC-R and service water heating equipmentbilly chenenergy_progress
08/09/2023Tenant Protection Plan ComplianceChih Hsuspecial
08/04/2023HVAC-R and service water piping design and insulationbilly chenenergy_progress
08/04/2023Tenant Protection Plan Compliance—special
08/04/2023HVAC-R and service water heating equipmentbilly chenenergy_progress
05/18/2023Tenant Protection Plan ComplianceChih Hsuspecial
05/17/2023Fire-Resistance Rated Constructionbilly chenprogress
05/17/2023Finalbilly chenprogress
05/17/2023Chimneys and ventsYao Guospecial
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026M00876552-S1Request digital key ↗
08/29/2026M00876552-S2Request digital key ↗
08/29/2026M00876552-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION7
05/11/2009110465087Open ↗
03/03/2009110465087Open ↗
02/10/2009110301245Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
04/02/2010110301245Open ↗
03/23/2010110301245Open ↗
03/02/2009110465087Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/29/2026M00876552-P2Open ↗
08/29/2026M00876552-S1Open ↗
08/29/2026M00876552-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M00876552-S1Open ↗
09/23/2026M00876552-S1Open ↗
09/01/2026M00876552-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00876552-S1Open ↗
09/01/2026M00876552-I1Open ↗
09/01/2026M00876552-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/18/2010110301245Open ↗
06/18/2010110301245Open ↗
03/02/2009110465087Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/02/2009110465087Open ↗
07/25/2008110301245Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
03/02/2009110465087Open ↗
07/25/2008110301245Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE3
05/28/2009110465087Open ↗
05/15/2009110301245Open ↗
03/10/2009110301245Open ↗
▸BISSCHEDULE B - PLUMBING2
03/02/2009110465087Open ↗
07/25/2008110301245Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026M00876552-P1Open ↗
08/29/2026M00876552-S1Open ↗
08/29/2026M00876552-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/02/2009110465087Open ↗
07/25/2008110301245Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
03/02/2009110465087Open ↗
07/25/2008110301245Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/18/2010110301245Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/18/2010110301245Open ↗
03/02/2009110465087Open ↗
07/28/2008110301245Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/02/2009110465087Open ↗
07/25/2008110301245Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/19/2010110301245Open ↗