DOB09/24/2025FTC W/COMMISSIONER'S ORDER CONTROL#341571,VIO#062625PI20801SB DATED 06/26/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT AS OF 09/24/25 NO PERMIT ISSUED FROM DOB-BIS OR DOBNOW SYSTEM FOR REPAIRING BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#341571 VIO# 062625PI20801SB TO REPAIR THE BLDG UNDER PERMIT
DOB06/26/2025FTM BLDG IN A CODE COMPLIANT MANNER. OBSVD MASONRY CRACKS @ EXP2&4 THE MASONRY WALL CRACKS ARE SPALLING AND WERE PREVIOUSLY INADEQUATELY REPAIRED AND ARE REOPENING. OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG & FILE REPAIR DWGS. BLDG TO BE PERMANENTLY REPAIRED UNDER PERMIT STARTING AUGUST 11,2025 & COMPLETED/SIGNED OFF BY SEPTEMBER 19, 2025
HPD12/04/2020§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
DOB07/16/2008V-DOB VIOLATION - ACTIVE
ECB08/10/2021FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION NOTED THE GUTTER LEADERS AT EXPOSURE #2, EXPOSURE #3 AND EXPOSURE #4 ARE NOT CONNECTED INTO THE DRAINS, REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB07/09/2021FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION RAIN LEADER PIPES AT PREMISES WERE OBSERVED NOT ATTACHED TO A STORM-DRAIN/DRYWELL., REPAIR AND/OR REPLACENothing owed — awaiting certificate of correction
ECB07/09/2021W/O A PERMIT. NOTED: AT ATTIC & BSMT - FULL HEIGHT PARTITION WALLS ERECTED TO CREATE 3 BDRMS & 3 BTHRMS; WATER & WASTE LINES INSTALLED FOR THREE (3) PC BTHRMS & RESIDENTIAL SINKS. ELECTRICAL WIRING INSTALLED: 2Nothing owed — awaiting certificate of correction
ECB12/03/2020OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O OR DEPARTMENT OF BUILDING RECORDS LEGAL ATTIC ILLEGALLY CONVERTED KICTHEN CONSISTED OF ELECTRIC STOVE 2ND MEANS OF EGRESS IS PRESENT WINDOW TO 2ND MEANS OF EGRNothing owed — awaiting certificate of correction
ECB07/02/2008WORK DOES NOT CONFORM TO APPROVED PLANS. NON- CONFORMING WORK NOTED: REMOVAL AND PLACEMENT OF SECTIONS OF SIDE EXTERIOR THIRD STORY WALLS AND SECTIONS OF ROOF. ALSO- PLANS SHOW ALL WORK TO BE PERFORMED AT FRONTNothing owed — awaiting certificate of correction