← Back
Two stories - detached, small or mid-size
399 BEACH ROAD
STATEN ISLAND · BIN 5066467
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R3AZoning
2,136 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,035 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 7 docs
Cellar9p · 2 filings · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARIANNE RUSSO311/09/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAPPALARDI CONSTRUCTION LLCGeneral Contractor203/21/2026
PASQUALE QUARATINO INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738109/15/2021
Building Lifecycle
All (15)Filed (3)Permit Issued (2)Signed Off (2)Inspection (4)Objection (2)Special Inspection (2)
01/17/2023
Signed off — Alteration
S00592752-I1
01/10/2023
Signed off — Alteration
CEL.FL:1REL EX SHW, 1REL EX LAV, 1REL EX TOILET,1REL EX WASHER,1REL EX UTILITY SINK,1REL GAS DRYER, 1REL&REP EX BOILER,1REL & REPL. HOT WATER STORAGE TANK, 1FL DRAIN, REL.AREA DR.1 FL:1 NEW SINK, 1REL EX SINK, 1REL EX STOVE,1 NEW GAS OVEN,1REPL.GAS FIREPL
S00594981-I1
12/22/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Scope
11/09/2022
Filed — Alteration
CEL.FL:1REL EX SHW, 1REL EX LAV, 1REL EX TOILET,1REL EX WASHER,1REL EX UTILITY SINK,1REL GAS DRYER, 1REL&REP EX BOILER,1REL & REPL. HOT WATER STORAGE TANK, 1FL DRAIN, REL.AREA DR.1 FL:1 NEW SINK, 1REL EX SINK, 1REL EX STOVE,1 NEW GAS OVEN,1REPL.GAS FIREPL
S00594981-P1
11/07/2022
Special inspection requirement — Energy Code Compliance Inspections
MARIANNE RUSSO
11/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MARIANNE RUSSO
10/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2022
Permit issued — Foundation
S00592752-I1-GC-CX
12/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/30/2021
Permit issued — Plumbing
S00594981-I1-PL
09/20/2021
Filed — Alteration
CEL.FL:1REL EX SHW, 1REL EX LAV, 1REL EX TOILET,1REL EX WASHER,1REL EX UTILITY SINK,1REL GAS DRYER, 1REL&REP EX BOILER,1REL & REPL. HOT WATER STORAGE TANK, 1FL DRAIN, REL.AREA DR.1 FL:1 NEW SINK, 1REL EX SINK, 1REL EX STOVE,1 NEW GAS OVEN,1REPL.GAS FIREPL
S00594981-I1
09/15/2021
Filed — Alteration
S00592752-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offPAPPALARDI CONSTRUCTION LLC03/25/2022
DOB NOWPlumbingSigned-offPASQUALE QUARATINO INC11/30/2021
BISPLISSUEDN/A11/21/2000
BIS—ISSUEDCONSTRUCTION BY DONALD ROWE JR10/26/2000
1 project · most recent 05/23/2022
General Wiring
FiledStatusContractorScope
05/23/2022CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/07/2022Energy Code Compliance InspectionsMARIANNE RUSSOprogress
11/07/2022HVAC-R and service water piping design and insulationMARIANNE RUSSOenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026S00592752-I1Request digital key ↗
08/23/2026S00594981-I1Request digital key ↗
08/15/2026S00594981-P1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026S00592752-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00592752-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00592752-I1Open ↗
08/13/2026S00594981-I1Open ↗
08/13/2026S00594981-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S00594981-P1Open ↗
08/27/2026S00594981-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026S00592752-I1Open ↗
08/13/2026S00594981-I1Open ↗
08/13/2026S00594981-P1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00592752-I1Open ↗
08/13/2026S00594981-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00592752-I1Open ↗