← Back
BuildNYC
Elevator apt, fireproof without stores
3991 SAXON AVENUE
BRONX · BIN 2129741
💬 Discuss this project
2024Year Built
6Stories
D3Building Class
R7-1Zoning
12,433 sfGross Floor Area
17Units
Rent Stabilized13 Active Violations ▸
Elevator apt, fireproof without stores · Owner of record: 3991 Saxson · 4,108 sf lot · 3.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3991 Saxon Ave LLC84p · 1 filing · 20 docs
Bulkhead3991 Saxon Ave LLC5p · 1 filing · 20 docs
Floor 6Unit 6B85p · 1 filing · 20 docs
Floor 53991 Saxon Ave LLC83p · 1 filing · 20 docs
Floor 43991 Saxon Ave LLC81p · 1 filing · 20 docs
Floor 33991 Saxon Ave LLC81p · 1 filing · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C83p · 1 filing · 20 docs
Floor 1Unit 1A, Unit 1B86p · 1 filing · 20 docs
Cellar3991 Saxon Ave LLC27p · 1 filing · 20 docs
Site & exterior3991 Saxon Ave LLC67p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3991 Saxon Ave3407/08/2026
S&N Saxon403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/14/2023$1.2M—S&N SAXON LLC → 3991 SAXSON LLC— not available
01/28/2020$722K—Private party → S&N SAXON LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
At-Design609/03/2024
Vasilios Artemiou PE705/31/2024
AP Professional Engineering201/16/2024
Structural Engineering Technologies311/13/2023
Badaly Architects107/29/2022
Mohammad Ahead, PE101/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Speedy Expediting2003/21/2026
BAC Developers Group603/21/2026
Arsenal Building Consultants203/21/2026
Sandeep Kaur203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rock BuildersGeneral Contractor807/08/2026
Parsons ConstructionScaffold603/21/2026
Rock BuildersScaffold303/21/2026
B Sosa EnterprisesGeneral Contractor303/21/2026
Dynamix Scaffold GroupScaffold203/21/2026
Prime Piping & HeatingFire Protection107/08/2026
Power Direct ElectricElectrical103/22/2026
Prime Piping & HeatingPlumbing107/08/2026
High Quality Electric ofElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing3941109/03/2024
Building Lifecycle
10/01/2026
Failure to maintain, observed at exposure#3, 8FT chain link fence is damaged and leaning inward. Observed at exposure#4, gaps between the building…
ECB violation · open
09/02/2026
§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE SINK IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · open
09/02/2026
§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOORS AT PUBLIC HALL, 1st STORY
HPD violation · open
09/02/2026
28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF…
HPD violation · open
09/02/2026
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF AT WEST WALL IN THE KITCHEN LOCATED AT APT 1B,…
HPD violation · open
161 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedRock Builders05/31/2024
DOB NOWSupported ScaffoldSigned-offParsons Construction01/22/2024
DOB NOWSprinklersSigned-offAmb Mechanical01/19/2024
DOB NOWSidewalk ShedSigned-offParsons Construction12/12/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating11/13/2023
DOB NOWMechanical SystemsSigned-offRock Builders10/23/2023
DOB NOWSupport of ExcavationSigned-offRock Builders10/20/2023
DOB NOWGeneral ConstructionPermit IssuedRock Builders09/07/2023
DOB NOWConstruction FenceSigned-offRock Builders06/21/2023
DOB NOWGeneral ConstructionPermit IssuedB Sosa Enterprises06/07/2022
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group01/03/2022
BIS—ISSUEDGreen Castle A Management11/10/2021
1 project · most recent 09/03/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
09/03/2024Permit IssuedRock BuildersAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 09/03/2024
Sprinkler System
FiledStatusContractorScope
09/03/2024Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 09/03/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/03/2024Signed-offAmb MechanicalGas, Storm, Water/Sanitary
6 projects · most recent 05/08/2024
General Wiring
FiledStatusContractorScope
05/08/2024CompletePower Direct ElectricGeneral Wiring
05/01/2024CompletePower Direct Electric—
02/21/2024CompleteStar Electrical Contractors—
02/01/2024CancelledPower Direct Electric—
12/14/2023CompleteHigh Quality Electric of—
01/10/2022CompleteHigh Quality Electric of—
1 project · most recent 09/03/2024
Concrete
FiledStatusContractorScope
09/03/2024Permit IssuedRock BuildersConcrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/14/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/16/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
09/04/2024Protection of exposed foundation insulationPaul Raymondenergy_progress
09/04/2024Exterior lighting powerPaul Raymondenergy_progress
09/04/2024Insulation placement and R valuesPaul Raymondenergy_progress
09/04/2024MeteringPaul Raymondenergy_progress
09/04/2024Air barrier - visual inspectionPaul Raymondenergy_progress
09/04/2024Lighting in dwelling unitsPaul Raymondenergy_progress
09/04/2024Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
09/04/2024Maintenance informationPaul Raymondenergy_progress
09/04/2024Fenestration air leakagePaul Raymondenergy_progress
09/04/2024Fenestration areasPaul Raymondenergy_progress
09/04/2024Subgrade InspectionsPaul Raymondspecial
09/04/2024Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
09/04/2024Concrete - Cast-In-PlacePaul Raymondspecial
09/04/2024Subsurface Investigations (Borings/Test Pits)GEORGE CAMBOURAKISspecial
09/04/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
09/04/2024FinalPaul Raymondprogress
09/04/2024Fire-Resistance Rated ConstructionPaul Raymondprogress
09/04/2024Footing and FoundationPaul Raymondprogress
09/04/2024Energy Code Compliance InspectionsPaul Raymondprogress
09/04/2024Air barrier — testing Paul Raymondenergy_progress
09/04/2024Lighting controlsPaul Raymondenergy_progress
09/04/2024Electrical motors and elevatorsPaul Raymondenergy_progress
09/04/2024Interior lighting powerPaul Raymondenergy_progress
06/05/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
06/05/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
Latest 25 of 119.
163 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account