DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
ECB05/11/2022MISSING CONTROL COVER, RELIEF VALVE DISCHARGE PIPING IS INCORRECT, MISSING DISCHARGE PIPING ON BACKFLOW PREVENTER, FLUE SPILLAGE SWITCH IMPROPERLY MOUNTED. CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFIC$3K due
ECB05/11/2022FOUND WILLIAMSON MODEL GSA-150-N-IP SERIAL # CP7672533 UNREGISTERED. MISSING MANUAL RESET LOW WATER CUTOFF, MISSING MANUAL RESET PRESSURETROL, FLUE SPILLAGE SWITCH NOT WIRED., MAINTAIN BOILER; OBTAIN THE PROPER$3K due
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
ECB09/21/2017OCCUPANCY CONTRARY OF THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS.LNO DENIED.NO FILLING FOR COFO.AT TIME OF INSPECTION BUILDING OCCUPIED AS RESTAURANT.REMEDY:DISCONTINUE ILLEGALNothing owed — awaiting certificate of correction
ECB06/08/2012FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERT OF CORRECTION WITH THE DOB FOR ECB VIOLATION #34046998H. REM:FILE CERT OF CORRECTION.Nothing owed — awaiting certificate of correction
ECB06/22/2011WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVED AMENDMENTS FOR THIS PRO CERT JOB,DWG 1-2010.NOTED:@ REAR YARD,1STORY EXTENSION,APPROX 20'X25'.@ CELLAR,REAR STAIR/HATCH,PLUMBING WORK DOESNothing owed — awaiting certificate of correction
ECB10/19/1990OCCUPANCY CONTRARY TO BUILDING DEPARTMENT RECORDS USE CHANGED FROM TO DRESS FACTORY. REMEDY: DISCONTINUE THE ILLEGAL USE OF THE PREMSIESNothing owed — awaiting certificate of correction