Elevator apt, fireproof without stores
Amsterdam (NYCHA)
40 AMSTERDAM AVENUE · BIN 1082581
💬 Discuss this project
1948Year Built
13Stories
D3Building Class
R8Zoning
825,480 sfGross Floor Area
1,084Units
LL97 Covered42 Open Violations 38 unresolved · 4 paperwork only ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 413,225 sf lot · 2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction27p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA4007/08/2026
NEW YORK CITY HOUSING AUTHORITY1203/22/2026
NYC HOUSING AUTHORITY2403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LORING CONSULTING ENGINEERS2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARDS PLUM & HTG CO,INGeneral Contractor2607/08/2026
RICHARDS P AND H CO, INCPlumbing507/08/2026
CRAIG GILSTONElectrical203/21/2026
ALVARADO, JUANElectrical203/21/2026
GHANSHYAM AMINElectrical203/21/2026
AMIN, GHANSHYAMElectrical203/21/2026
HALPERN, SElectrical203/21/2026
BLACKSHEAR, VINCENTElectrical103/21/2026
H&F IRON WORKSElectrical103/21/2026
FOY, REMERElectrical103/21/2026
GILSTON ELEC'L CONTNG LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902811/17/2025
Building Lifecycle
All (113)Filed (10)Permit Issued (20)Signed Off (3)Facade (FISP) (15)Violation (11)Inspection (12)Objection (12)Special Inspection (30)
07/27/2026
Signed off — Alteration
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per plans.
M00463840-I1
07/21/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/02/2026
Permit issued — Plumbing
M00464369-I1-PL
06/24/2026
Signed off — Alteration
M00463838-I1
04/21/2026
Signed off — Alteration
Structural analysis to support new mechanical equipment installations
M00463822-I1
03/25/2026
Permit issued — Mechanical Systems
M00463840-I1-MS
03/25/2026
Permit issued — Structural
M00463822-I1-ST
03/25/2026
Permit issued — General Construction
M00463838-I1-GC
03/24/2026
Permit issued — General Construction
M00463813-I1-GC
12/09/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
IBRAHIM MOURAD
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
11/17/2025
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00464369-P5
09/22/2025
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
08/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/25/2025
Objection resolved — Addressed
06/24/2025
Permit issued — Plumbing
M00464369-I1-PL
06/14/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/31/2025
Objection raised — Plumbing
05/13/2025
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00464369-P4
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
05/07/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
IBRAHIM MOURAD
03/21/2025
Permit issued — Structural
M00463822-I1-ST
03/21/2025
Permit issued — General Construction
M00463838-I1-GC
03/21/2025
Permit issued — General Construction
M00463813-I1-GC
03/21/2025
Permit issued — Mechanical Systems
M00463840-I1-MS
03/18/2025
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00464369-P3
01/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
01/24/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
12/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/11/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2024
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00464369-P2
09/16/2024
Permit issued — Structural
M00463822-I1-ST
09/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2024
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC07/02/2026
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN03/25/2026
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN03/25/2026
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/25/2026
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/24/2026
DOB NOWPlumbingSigned-offRICHARDS P AND H CO, INC06/24/2025
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN09/16/2024
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN07/31/2024
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC06/20/2024
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN06/20/2024
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN05/23/2024
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN09/18/2023
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN07/29/2023
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN06/14/2023
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC06/12/2023
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN05/23/2023
BISOTISSUEDPIZZAROTTI LLC09/30/2020
BISOTISSUEDPIZZAROTTI LLC09/30/2020
BISEQISSUEDPIZZAROTTI LLC02/11/2020
BISEQISSUEDPIZZAROTTI LLC02/11/2020
BISOTISSUEDPIZZAROTTI LLC10/02/2019
BISOTISSUEDPIZZAROTTI LLC10/02/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISOTISSUEDPIZZAROTTI LLC01/29/2019
BISOTISSUEDPIZZAROTTI LLC01/29/2019
BISOTISSUEDPIZZAROTTI LLC01/29/2019
BISEQISSUEDPIZZAROTTI LLC04/03/2018
BISEQISSUEDPIZZAROTTI LLC03/27/2018
BISEQISSUEDPIZZAROTTI LLC03/27/2018
BISOTISSUEDPIZZAROTTI LLC02/21/2018
BISOTISSUEDPIZZAROTTI LLC02/21/2018
BISOTISSUEDPIZZAROTTI LLC01/24/2018
BISOTISSUEDPIZZAROTTI LLC01/24/2018
+ 21 more permits on file
1 project · most recent 11/17/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/17/2025Permit IssuedRICHARDS P AND H CO, INCGas, Storm, Water/Sanitary
6 projects · most recent 07/11/2025
General Wiring
FiledStatusContractorScope
07/11/2025CompleteMECO ELECTRIC CO. INC.General Wiring
04/09/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
04/09/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
01/12/2024CompleteGILSTON ELEC'L CONTNG LLCGeneral Wiring
01/12/2024CompleteGILSTON ELEC'L CONTNG LLCGeneral Wiring
12/06/2023CompleteTRANSEL ELEV. & ELEC. INCGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/21/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/22/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
08/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/14/2025Pass-Final PL - UndergroundPassView ↗
12/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
12/09/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
12/09/2025Maintenance informationIBRAHIM MOURADenergy_progress
12/09/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
12/09/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
12/09/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
12/09/2025Electrical motors and elevatorsIBRAHIM MOURADenergy_progress
12/09/2025High-Pressure Fuel-Gas Piping (Welding)IBRAHIM MOURADspecial
12/09/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
05/07/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
05/07/2025Electrical motors and elevatorsIBRAHIM MOURADenergy_progress
05/07/2025Maintenance informationIBRAHIM MOURADenergy_progress
05/07/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
05/07/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
05/07/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
05/07/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
05/07/2025High-Pressure Fuel-Gas Piping (Welding)IBRAHIM MOURADspecial
01/24/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
01/24/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
01/24/2025High-Pressure Fuel-Gas Piping (Welding)IBRAHIM MOURADspecial
01/24/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
01/24/2025Electrical motors and elevatorsIBRAHIM MOURADenergy_progress
01/24/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
01/24/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
01/24/2025Maintenance informationIBRAHIM MOURADenergy_progress
09/06/2024High-Pressure Fuel-Gas Piping (Welding)IBRAHIM MOURADspecial
Latest 25 of 38.
▾Documents — 203 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch - Plumbing5
08/20/2026M00464369-P2Request digital key ↗
08/20/2026M00464369-I1Request digital key ↗
08/20/2026M00464369-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00463838-I1Request digital key ↗
08/15/2026M00463813-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/27/2026M00463822-I1Request digital key ↗
08/27/2026M00463822-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00463840-I1Request digital key ↗
▸Applications & Permits55
▸BISWORK PERMIT APPLICATION35
10/05/2021102720977Open ↗
10/05/2021102720272Open ↗
09/28/2021102720977Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
01/24/2017140413522Open ↗
01/20/2017140419786Open ↗
01/20/2017140413513Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications55
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
06/13/2017140268378Open ↗
06/08/2017140283342Open ↗
06/07/2017140268369Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00463838-I1Open ↗
09/03/2026M00463840-I1Open ↗
08/27/2026M00463822-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00464369-P4Open ↗
09/01/2026M00464369-P4Open ↗
09/01/2026M00463822-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/30/2015140419786Open ↗
10/13/2015140413522Open ↗
10/13/2015140413513Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
11/30/2015140419786Open ↗
10/13/2015140413522Open ↗
10/13/2015140413513Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/30/2015140419786Open ↗
10/13/2015140413522Open ↗
10/13/2015140413513Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00464369-P4Open ↗
09/01/2026M00463822-I1Open ↗
08/28/2026M00464369-P3Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
01/26/2011120579427Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00463838-I1Open ↗
09/03/2026M00463840-I1Open ↗
08/27/2026M00463822-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
01/26/2011120579427Open ↗
01/26/2011120579427Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/21/2016121753557Open ↗
09/24/2013121753557Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/13/2015140413513Open ↗
12/12/2014140268369Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00463840-I1Open ↗
08/20/2026M00464369-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/15/2026M00463813-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/30/2015140419786Open ↗
10/13/2015140413522Open ↗
10/13/2015140413513Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs40
▸BISSUPERSEDING LETTER11
09/28/2021102720977Open ↗
09/27/2021102720272Open ↗
08/19/2021102720977Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
09/03/2026M00463838-I1Open ↗
08/27/2026M00463822-I1Open ↗
08/20/2026M00464369-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)7
08/20/2026M00464369-P3Open ↗
08/20/2026M00464369-P4Open ↗
08/20/2026M00464369-P2Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/05/2021102720977Open ↗
10/05/2021102720272Open ↗
05/26/2017140413513Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
09/03/2026M00463838-I1Open ↗
09/03/2026M00463840-I1Open ↗
08/27/2026M00463822-I1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/13/2017140268378Open ↗
06/08/2017140283342Open ↗
06/07/2017140268369Open ↗
▸BISSHED LETTER1
05/27/2016140413513Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/22/2013121753557Open ↗
09/24/2013121753557Open ↗
01/26/2011120579427Open ↗
▸Filing & Intake Forms13
▸BISEFILING JOB APPLICATION COVER SHEET6
11/30/2015140419786Open ↗
10/13/2015140413522Open ↗
10/13/2015140413513Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
12/14/2017140419786Open ↗
04/06/2016121753557Open ↗
06/10/2015121753557Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
11/22/2013121753557Open ↗
09/24/2013121753557Open ↗
01/26/2011120579427Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/18/2016121753557Open ↗