Elevator apt, fireproof without stores
Amsterdam (NYCHA)
40 AMSTERDAM AVENUE · BIN 1082582
💬 Discuss this project
1948Year Built
13Stories
D3Building Class
R8Zoning
825,480 sfGross Floor Area
1,084Units
LL97 Covered42 Open Violations 38 unresolved · 4 paperwork only ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 413,225 sf lot · 2 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3809/14/2026
NYCHA 99103/22/2026
NYC HOUSING AUTHORITY2203/21/2026
NAVILLUS CONTRACTING103/21/2026
NEW YORK CITY HOUSING AUTHORITY1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LORING CONSULTING ENGINEERS2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARDS PLUM & HTG CO,INGeneral Contractor2207/08/2026
RICHARDS P AND H CO, INCPlumbing407/08/2026
CRAIG GILSTONElectrical303/21/2026
GHANSHYAM AMINElectrical203/21/2026
HALPERN, SElectrical203/21/2026
ALVARADO, JUANElectrical203/21/2026
AMIN, GHANSHYAMElectrical203/21/2026
BLACKSHEAR, VINCENTElectrical203/21/2026
EUGENE FITZGERALDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KS ENGINEERS, P.C.7715209/02/2026
BUREAU VERITAS NA6902805/13/2025
Building Lifecycle
All (102)Filed (12)Permit Issued (19)Signed Off (4)Facade (FISP) (15)Violation (10)Inspection (8)Objection (4)Special Inspection (30)
09/02/2026
Filed — Alteration
Application to be reviewed with the Development HUB. Site Yard work and new 8'-0" high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy.
M01231697-P1
08/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Structural Steel - Details
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Post-installed Anchors
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Concrete - Cast-In-Place
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Final
LEOVIGILDO FONTANA
08/31/2026
Special inspection requirement — Structural Steel - Welding
LEOVIGILDO FONTANA
07/27/2026
Signed off — Alteration
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per plans.
M00474366-I1
06/22/2026
Signed off — Alteration
M00474262-I1
05/29/2026
Signed off — Alteration
Provide services to support Mechanical equipment removals and new installations
M00474228-I1
04/21/2026
Signed off — Alteration
new steel and concrete house pads for new gas fired water heaters and misalliances mechanical equipment.
M00474282-I1
03/24/2026
Permit issued — General Construction
M00474262-I1-GC
03/24/2026
Permit issued — Structural
M00474282-I1-ST
03/24/2026
Permit issued — Mechanical Systems
M00474366-I1-MS
03/24/2026
Permit issued — General Construction
M00474228-I1-GC
10/27/2025
Permit issued — Plumbing
M00474374-I1-PL
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
06/13/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
IBRAHIM MOURAD
06/02/2025
Objection resolved — Addressed
05/28/2025
Filed — Alteration
Application to be reviewed with the Development HUB. Site Yard work and new 8'-0" high aluminum fence as per plans filed herewith. No change to use, egress, or occupancy.
M01231697-I1
05/27/2025
Objection raised — Scope
05/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LEOVIGILDO FONTANA
05/27/2025
Special inspection requirement — Post-installed Anchors
LEOVIGILDO FONTANA
05/27/2025
Special inspection requirement — Structural Steel - Details
LEOVIGILDO FONTANA
05/27/2025
Special inspection requirement — Structural Steel - High Strength Bolting
LEOVIGILDO FONTANA
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
LEOVIGILDO FONTANA
05/27/2025
Special inspection requirement — Final
LEOVIGILDO FONTANA
05/27/2025
Special inspection requirement — Concrete - Cast-In-Place
LEOVIGILDO FONTANA
05/13/2025
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00474374-P3
04/18/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/21/2025
Permit issued — Structural
M00474282-I1-ST
03/21/2025
Permit issued — General Construction
M00474262-I1-GC
03/21/2025
Permit issued — General Construction
M00474228-I1-GC
03/21/2025
Permit issued — Mechanical Systems
M00474366-I1-MS
03/20/2025
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
11/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2024
Permit issued — Plumbing
M00474374-I1-PL
10/10/2024
Permit issued — Mechanical Systems
M00474366-I1-MS
10/09/2024
Permit issued — Structural
M00474282-I1-ST
10/09/2024
Permit issued — General Construction
M00474228-I1-GC
09/26/2024
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00474374-P2
09/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
IBRAHIM MOURAD
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/24/2024
Filed — Alteration
install two (2) new gas fired water heaters, piping, area drains and all related work as per plans.
M00474374-P1
05/23/2024
Permit issued — General Construction
M00474262-I1-GC
04/25/2024
Filed — Alteration
new steel and concrete house pads for new gas fired water heaters and misalliances mechanical equipment.
M00474282-P2
02/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/24/2026
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN03/24/2026
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN03/24/2026
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/24/2026
DOB NOWPlumbingSigned-offRICHARDS P AND H CO, INC10/27/2025
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN03/21/2025
DOB NOWPlumbingSigned-offRICHARDS P AND H CO, INC10/31/2024
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN10/10/2024
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN10/09/2024
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN10/09/2024
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN05/23/2024
DOB NOWPlumbingSigned-offRICHARDS P AND H CO, INC10/27/2023
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN10/25/2023
DOB NOWMechanical SystemsSigned-offRICHARDS PLUM & HTG CO,IN10/25/2023
DOB NOWStructuralSigned-offRICHARDS PLUM & HTG CO,IN10/25/2023
DOB NOWGeneral ConstructionSigned-offRICHARDS PLUM & HTG CO,IN05/23/2023
BISOTISSUEDPIZZAROTTI LLC09/30/2020
BISOTISSUEDPIZZAROTTI LLC09/30/2020
BISEQISSUEDPIZZAROTTI LLC03/06/2020
BISEQISSUEDPIZZAROTTI LLC02/11/2020
BISOTISSUEDPIZZAROTTI LLC10/02/2019
BISOTISSUEDPIZZAROTTI LLC10/02/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISEQISSUEDPIZZAROTTI LLC03/14/2019
BISOTISSUEDPIZZAROTTI LLC01/29/2019
BISOTISSUEDPIZZAROTTI LLC01/29/2019
BISEQISSUEDPIZZAROTTI LLC04/04/2018
BISEQISSUEDPIZZAROTTI LLC03/27/2018
BISEQISSUEDPIZZAROTTI LLC03/27/2018
BISOTISSUEDPIZZAROTTI LLC02/20/2018
BISOTISSUEDPIZZAROTTI LLC02/20/2018
BISOTISSUEDPIZZAROTTI LLC01/25/2018
BISOTISSUEDPIZZAROTTI LLC01/25/2018
BISEQISSUEDPIZZAROTTI LLC05/08/2017
BISEQISSUEDPIZZAROTTI LLC04/10/2017
BISEQISSUEDPIZZAROTTI LLC04/10/2017
+ 22 more permits on file
1 project · most recent 05/13/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/13/2025Signed-offRICHARDS P AND H CO, INCGas, Storm, Water/Sanitary
8 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedJEMCO ELECT. CONTRS INCGeneral Wiring
09/25/2025CompleteGILSTON ELEC'L CONTNG LLCGeneral Wiring
07/11/2025CompleteMECO ELECTRIC CO. INC.General Wiring
04/12/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
04/12/2024CompleteTRI-STATE ELECL & MECHL IGeneral Wiring
01/12/2024CompleteGILSTON ELEC'L CONTNG LLCGeneral Wiring
12/06/2023CompleteTRANSEL ELEV. & ELEC. INCGeneral Wiring
09/28/2023Permit IssuedSTANCO SYSTEM ELEC'L CONT—
1 project · most recent 09/02/2026
Concrete
FiledStatusContractorScope
09/02/2026——Concrete
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/18/2025Pass-Final PL - UndergroundPassView ↗
03/20/2025Fail-Final PL - UndergroundFailView ↗
11/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
08/31/2026Structural Stability – Alterations of existing buildingsLEOVIGILDO FONTANAspecial
08/31/2026Tenant Protection Plan ComplianceLEOVIGILDO FONTANAspecial
08/31/2026Structural Steel - DetailsLEOVIGILDO FONTANAspecial
08/31/2026Post-installed AnchorsLEOVIGILDO FONTANAspecial
08/31/2026Fire-Resistant Penetrations and JointsLEOVIGILDO FONTANAspecial
08/31/2026Concrete - Cast-In-PlaceLEOVIGILDO FONTANAspecial
08/31/2026FinalLEOVIGILDO FONTANAprogress
08/31/2026Structural Steel - WeldingLEOVIGILDO FONTANAspecial
06/13/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/13/2025Electrical motors and elevatorsIBRAHIM MOURADenergy_progress
06/13/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
06/13/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
06/13/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
06/13/2025Maintenance informationIBRAHIM MOURADenergy_progress
06/13/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
06/13/2025High-Pressure Fuel-Gas Piping (Welding)IBRAHIM MOURADspecial
05/27/2025Fire-Resistant Penetrations and JointsLEOVIGILDO FONTANAspecial
05/27/2025Post-installed AnchorsLEOVIGILDO FONTANAspecial
05/27/2025Structural Steel - DetailsLEOVIGILDO FONTANAspecial
05/27/2025Structural Steel - High Strength BoltingLEOVIGILDO FONTANAspecial
05/27/2025Tenant Protection Plan ComplianceLEOVIGILDO FONTANAspecial
05/27/2025FinalLEOVIGILDO FONTANAprogress
05/27/2025Concrete - Cast-In-PlaceLEOVIGILDO FONTANAspecial
09/06/2024HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
09/06/2024HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
Latest 25 of 58.
▾Documents — 212 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing4
08/26/2026M00474374-P2Request digital key ↗
08/26/2026M00474374-P1Request digital key ↗
08/26/2026M00474374-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/04/2026M00474282-P2Request digital key ↗
09/04/2026M00474282-I1Request digital key ↗
08/14/2026M00474282-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00474262-I1Request digital key ↗
09/03/2026M00474228-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00474366-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/23/2026M01231697-I1Request digital key ↗
▸Applications & Permits56
▸BISWORK PERMIT APPLICATION36
10/05/2021102720986Open ↗
10/05/2021102722635Open ↗
09/27/2021102722635Open ↗
Showing 3 of 36 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
12/28/2016140413540Open ↗
12/28/2016140419795Open ↗
12/28/2016140413531Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications69
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M01231697-P1Open ↗
09/23/2026M01231697-P1Open ↗
09/23/2026M01231697-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/15/2026M01231697-P1Open ↗
09/04/2026M00474282-P2Open ↗
09/04/2026M00474282-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/20/2017140283351Open ↗
06/20/2017140249176Open ↗
06/20/2017140249185Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026M01231697-P1Open ↗
09/02/2026M00474282-P2Open ↗
09/01/2026M00474282-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
11/30/2015140419795Open ↗
10/13/2015140413540Open ↗
10/13/2015140413531Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
11/30/2015140419795Open ↗
10/13/2015140413540Open ↗
10/13/2015140413531Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/30/2015140419795Open ↗
10/13/2015140413540Open ↗
10/13/2015140413531Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/04/2026M00474282-I1Open ↗
09/03/2026M00474366-I1Open ↗
08/13/2026M00474374-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/21/2016121753539Open ↗
09/24/2013121753539Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
10/13/2015140413531Open ↗
09/17/2014140249176Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00474366-I1Open ↗
08/26/2026M00474374-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/30/2015140419795Open ↗
10/13/2015140413540Open ↗
10/13/2015140413531Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs45
▸BISSUPERSEDING LETTER13
09/27/2021102722635Open ↗
09/27/2021102720986Open ↗
04/04/2018140413531Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
09/15/2026M01231697-P1Open ↗
09/04/2026M00474282-P2Open ↗
09/04/2026M00474282-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
09/04/2026M00474282-P2Open ↗
09/04/2026M00474282-I1Open ↗
08/26/2026M00474374-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
09/04/2026M00474282-I1Open ↗
09/03/2026M00474366-I1Open ↗
09/03/2026M00474228-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/05/2021102720986Open ↗
10/05/2021102722635Open ↗
05/26/2017140413531Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/20/2017140283351Open ↗
06/20/2017140249176Open ↗
06/20/2017140249185Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/22/2013121753539Open ↗
09/24/2013121753539Open ↗
▸Filing & Intake Forms12
▸BISEFILING JOB APPLICATION COVER SHEET6
11/30/2015140419795Open ↗
10/13/2015140413540Open ↗
10/13/2015140413531Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
12/14/2017140419795Open ↗
04/06/2016121753539Open ↗
06/10/2015121753539Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
11/22/2013121753539Open ↗
09/24/2013121753539Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/18/2016121753539Open ↗