← Back
Parochial school, yeshiva
Yeshiva Mesivta Arugath Habosem
40 LYNCH STREET · BIN 3335347
💬 Discuss this project
1970Year Built
2Stories
W2Building Class
R7-1Zoning
20,000 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Parochial school, yeshiva · Owner of record: YESHIVA AND MESIFTA ARUGATH HABOSEM · 14,576 sf lot · 1.37 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof8p · 3 filings · 20 docs
Bulkhead5p · 3 filings · 20 docs
Floor 81p · 1 filing · 20 docs
Floor 75p · 1 filing · 20 docs
Floor 64p · 1 filing · 20 docs
Floor 54p · 1 filing · 20 docs
Floor 45p · 2 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 16p · 3 filings · 20 docs
Cellar4p · 1 filing · 20 docs
Basement2p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING1803/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519611/10/2023
ADROIT ENGINEERING PLLC8885108/16/2023
Building Lifecycle
All (76)Filed (12)Violation (4)Objection (38)Special Inspection (22)
07/22/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/10/2026
Objection raised — Other
07/10/2026
Objection raised — Other
06/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO VERTICALLY AND HORIZONTALLY ENLARGE AN EXISTING 1 STORY BUILDING TO A FOUR-STORY SCHOOL BUILDING
B01396888-I1
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/01/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2025
Violation issued (ECB, closed)
Construction
11/07/2024
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-P1
11/06/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/23/2024
Violation issued (FDNY_NOV, closed)
01/17/2024
Objection resolved — Addressed
01/09/2024
Objection resolved — Addressed
12/05/2023
Objection resolved — Addressed
11/22/2023
Objection raised — Other
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/16/2023
Objection raised — Other
11/15/2023
Objection raised — Structural
11/15/2023
Objection raised — Structural
11/15/2023
Objection raised — Structural
11/15/2023
Objection raised — Admin
11/15/2023
Objection raised — Other
11/15/2023
Objection raised — Other
11/15/2023
Objection raised — Other
11/10/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S4
11/10/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S9
11/09/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S3
11/09/2023
Objection resolved — Addressed
11/08/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S7
11/08/2023
Special inspection requirement — Final
NAVEEN KUMAR
11/08/2023
Special inspection requirement — Footing and Foundation
Younes Abouyaala
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/01/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S8
10/19/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/16/2023
Objection raised — Other
10/16/2023
Objection raised — Other
10/16/2023
Objection raised — Other
10/12/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S6
10/12/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S5
10/12/2023
Special inspection requirement — Masonry
Younes Abouyaala
10/12/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
10/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
10/12/2023
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
10/12/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
10/12/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
10/12/2023
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
10/12/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Younes Abouyaala
10/12/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Other
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDIDEAL FIRE SYSTEMS CORP06/26/2003
1 project · most recent 11/07/2024
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/07/2024——Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-A12NKA7 12,000 BTU · Heat Pump Outdoor ×2
Heat / Cool
Daikin RXSQ24TAVJU 24,000 BTU · Vrf Outdoor ×51
RXTQ36TAVJ9 36,000 BTU · Vrf Outdoor ×17
RXYQ120TATJU 114,000 BTU · Vrf Outdoor ×1
RXYQ216TATJU 206,000 BTU · Vrf Outdoor ×1
Trane YH210G3H 214,800 BTU · Furnace ×4
Heating
Qmark CSH-07A 7,680 BTU · Baseboard ×29
Ventilation
Greenheck SQ-160-VG 910 CFM · Exhaust Fan ×3
SQ-70-VG 1,289 CFM · Exhaust Fan ×3
G-098-VG 530 CFM · Exhaust Fan ×2
SQ-100-VG 670 CFM · Exhaust Fan ×2
SQ-120-VG 410 CFM · Exhaust Fan ×2
SQ-90-VG 360 CFM · Exhaust Fan ×2
G-100-VG 610 CFM · Exhaust Fan ×1
G-180-VG 2,150 CFM · Exhaust Fan ×1
Renewaire HE2XINH 1,400 CFM · Erv ×5
HE2XRT 1,050 CFM · Erv ×2
HE3XINH 1,280 CFM · Erv ×1
HE3XRT 2,100 CFM · Erv ×1
HE4XINH 2,140 CFM · Exhaust Fan ×1
— HE2XINH 1,400 CFM · Erv ×1
1 project · most recent 11/07/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/07/2024——Gas, Storm, Water/Sanitary
1 project · most recent 09/21/2018
General Wiring
FiledStatusContractorScope
09/21/2018Permit IssuedBLZ ELECTRIC INC.General Wiring
1 project · most recent 11/07/2024
Steel Concrete
FiledStatusContractorScope
11/07/2024——Steel, Concrete
1 project · most recent 11/07/2024
Fence
FiledStatusContractorScope
11/07/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/05/2026Structural Stability – Alterations of existing buildings—special
11/06/2024Excavations - Sheeting, Shoring, and Bracing—special
11/08/2023FinalNAVEEN KUMARprogress
11/08/2023Footing and FoundationYounes Abouyaalaprogress
11/08/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/12/2023MasonryYounes Abouyaalaspecial
10/12/2023Structural Steel - DetailsYounes Abouyaalaspecial
10/12/2023Subsurface Investigations (Borings/Test Pits)—special
10/12/2023Structural Steel - WeldingYounes Abouyaalaspecial
10/12/2023Structural Steel - High Strength BoltingYounes Abouyaalaspecial
10/12/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
10/12/2023Subgrade InspectionsYounes Abouyaalaspecial
10/12/2023Subsurface Conditions – Fill Placement & In-Place DensityYounes Abouyaalaspecial
10/12/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
09/19/2023FinalNAVEEN KUMARprogress
09/19/2023Footing and FoundationYounes Abouyaalaprogress
09/19/2023FinalNAVEEN KUMARprogress
09/18/2023Sprinkler SystemsYounes Abouyaalaspecial
09/18/2023Standpipe SystemsYounes Abouyaalaspecial
08/16/2023Construction Operations Influencing Adjacent StructuresDUY HOANGspecial
08/16/2023DemolitionDUY HOANGspecial
08/16/2023Structural Stability – Alterations of existing BuildingsDUY HOANGspecial
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026B00918185-I1Request digital key ↗
08/27/2026B00918185-S1Request digital key ↗
08/26/2026B00932188-S8Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
12/29/2011320276651Open ↗
03/04/2011320276651Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISADDRESS - NEW HOUSE NUMBER APPROVED2
01/11/2012320276651Open ↗
02/28/2024321601824Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION2
01/11/2012320276651Open ↗
02/28/2024321601824Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01396888-I1Open ↗
08/13/2026B00932188-I1Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
01/11/2012320276651Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/28/2024321601824Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/28/2024321601824Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01396888-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00932188-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00932188-S9Open ↗
08/26/2026B00932188-S8Open ↗
08/26/2026B00932188-S7Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00932188-S6Open ↗
08/30/2026B00932188-S3Open ↗
08/26/2026B00932188-S5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00932188-S6Open ↗
09/01/2026B00932188-S6Open ↗
08/28/2026B00932188-S9Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/04/2011320276651Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/08/2023340903785Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00932188-I1—
▸Safety & Tenant Protection3
▸BISBPP: STREET TREES SITE PLAN1
02/12/2024340903785Open ↗
▸BISSTREET TREE CHECKLIST1
02/12/2024340903785Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026B00932188-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
03/04/2011320276651Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B00932188-S6Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/26/2026B00932188-S2Open ↗
08/26/2026B00932188-S7Open ↗
08/26/2026B00932188-S5Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
03/04/2011320276651Open ↗
12/29/2011320276651Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/04/2011320276651Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/04/2011320276651Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/04/2011320276651Open ↗
▸BISEFILING COVER SHEET1
03/04/2011320276651Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION2
02/12/2024340903785Open ↗
12/08/2023340903785Open ↗
▸BISPlot Diagram2
01/11/2012320276651Open ↗
08/17/2012320276651Open ↗
▸DOB NOWSite Survey: Initial2
08/16/2026B01396888-I1Open ↗
08/13/2026B00932188-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026B00932188-I1Open ↗
08/13/2026B00918185-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00932188-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00932188-S4Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00918185-I1Open ↗