| Owner | Filings | Most Recent |
|---|---|---|
| Lefrak | 1,352 | 10/17/2026 |
| 49 West 57th Street Owner | 17 | 03/21/2026 |
| Federal Realty | 3 | 03/21/2026 |
| 30 West 57 | 2 | 03/21/2026 |
| Boulevard Leasing Co | 2 | 03/21/2026 |
| The Martin Group | 1 | 03/22/2026 |
| Vornado Realty Trust | 1 | 03/21/2026 |
| Duane Reade | 1 | 03/21/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Municipal Building Consultants | 174 | 03/21/2026 |
| Milrose Consultants | 73 | 03/21/2026 |
| William Vitacco Associates | 18 | 03/21/2026 |
| Burnham Nationwide | 1 | 03/21/2026 |
| AE Design Solution | 6 | 03/21/2026 |
| DVA Advisors | 5 | 03/21/2026 |
| Nobu | 4 | 03/21/2026 |
| Rand Engineering & Arch | 2 | 03/21/2026 |
| New York Design Arhictects | 4 | 03/21/2026 |
| Synergy Building Consultants | 1 | 03/21/2026 |
| Green Studio | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Quest Builders Group | General Contractor | 40 | 07/08/2026 |
| Tri-Star Construction | General Contractor | 28 | 10/17/2026 |
| JC Elite Construction Services | General Contractor | 16 | 07/08/2026 |
| JT Magen & Company | General Contractor | 16 | 07/08/2026 |
| Finaly General Contracting | General Contractor | 14 | 10/04/2026 |
| Icon Interiors | General Contractor | 10 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 7 | 07/08/2026 |
| JRM Construction Management | General Contractor | 7 | 07/08/2026 |
| Mill Brook Fire Protection | Fire Protection | 7 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 6 | 07/08/2026 |
| A&A Plumbing | Plumbing | 6 | 09/03/2026 |
| Shawmut Woodworking & Supply | General Contractor | 6 | 07/08/2026 |
| Rock Group NY | Scaffold | 6 | 03/21/2026 |
| PSI Partners | Fire Protection | 5 | 07/08/2026 |
| Verus | General Contractor | 4 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Clune Construction Co | General Contractor | 4 | 07/08/2026 |
| CPM Builders | General Contractor | 4 | 04/09/2026 |
| Fairmont Industries | General Contractor | 4 | 07/08/2026 |
| City/Suburban Plumbing | Plumbing | 4 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 4 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 4 | 07/08/2026 |
| Structure Tone | General Contractor | 4 | 07/08/2026 |
| Arsenal Scaffold | Scaffold | 4 | 03/21/2026 |
| Ralt | General Contractor | 3 | 03/21/2026 |
| Royal Concrete and Mason* | specialty_contractor | 3 | 03/21/2026 |
| LCS Plumbing & Consulting | Plumbing | 3 | 07/08/2026 |
| Enobrac Plumbing | Plumbing | 3 | 07/08/2026 |
| Ashland Plumbing | Plumbing | 3 | 07/08/2026 |
| Magic Mechanical | Plumbing | 3 | 06/28/2026 |
| Addison Plumbing and Heating | Fire Protection | 3 | 07/08/2026 |
| Five Borough NYC | Fire Protection | 3 | 07/08/2026 |
| Demar Plumbing | Fire Protection | 2 | 07/08/2026 |
| Newline Electrical | Electrical | 2 | 03/22/2026 |
| Crossland Mechanical | specialty_contractor | 2 | 03/21/2026 |
| Nycan Builders | General Contractor | 2 | 07/08/2026 |
| CS Bridge | Scaffold | 2 | 03/21/2026 |
| Eagle Scaffolding Services | Scaffold | 2 | 03/21/2026 |
| Piece Management | Scaffold | 2 | 03/21/2026 |
| A & M Warshaw Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 2 | 07/08/2026 |
| Commerical Plumbing Svces | Plumbing | 2 | 07/29/2026 |
| A.S.K. Electrical | Electrical | 2 | 03/22/2026 |
| Enobrac Plumbing | Fire Protection | 2 | 07/08/2026 |
| Go Pro Fire Protection | Fire Protection | 2 | 08/26/2026 |
| Ariana Contracting | Fire Protection | 1 | 07/08/2026 |
| Specialty Construction SY | General Contractor | 1 | 07/08/2026 |
| A + Sprinkler | Fire Protection | 1 | 07/08/2026 |
| M.C. Electrical NY | Electrical | 1 | 03/21/2026 |
| Piece Management | General Contractor | 1 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| Millenium Restoration | specialty_contractor | 1 | 07/08/2026 |
| Interstate Electric | Electrical | 1 | 03/22/2026 |
| Copper Plumbing | Plumbing | 1 | 07/08/2026 |
| Demar Mechanical | Plumbing | 1 | 07/08/2026 |
| Sean Coakley P & H | Fire Protection | 1 | 07/08/2026 |
| Denko Mechanical | Fire Protection | 1 | 09/09/2026 |
| Black Bull Bulders | General Contractor | 1 | 07/08/2026 |
| Sean Coakley P & H | Plumbing | 1 | 07/08/2026 |
| Bern Companies | General Contractor | 1 | 07/08/2026 |
| Troon Electric of New Yor | Electrical | 1 | 03/22/2026 |
| Geoffrey A. Lagas & Associates | Plumbing | 1 | 07/08/2026 |
| Soh Par Sprinkler | Fire Protection | 1 | 07/08/2026 |
| New York City Electric Services | Electrical | 1 | 03/22/2026 |
| Mikoma Electric | Electrical | 1 | 03/22/2026 |
| Lmec Electric | Electrical | 1 | 03/22/2026 |
| Miller Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Miller Plumbing & Heating | Fire Protection | 1 | 07/08/2026 |
| The Martin Group New York | General Contractor | 1 | 07/08/2026 |
| Addison Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Norway Electric | Electrical | 1 | 03/21/2026 |
| A Plus Plumbing | Plumbing | 1 | 07/08/2026 |
| Arco Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Arco Plumbing and Heating | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Trolydia Testing & Inspec | 4422 | 135 | 10/06/2026 |
| SRA Inspections | 3461 | 5 | 05/08/2026 |
| Milrose Consultants | 2003 | 7 | 12/16/2025 |
| AK Engineering | 678 | 6 | 12/15/2025 |
| Sag Engineering & Consulting | 608 | 11 | 11/13/2025 |
| SE Inspections | 7486 | 3 | 02/04/2025 |
| Rand Engineering & Architects | 266 | 1 | 11/26/2024 |
| Alan Margolin & Associates | 423 | 5 | 11/13/2024 |
| MEP Inspections | 1102 | 14 | 07/25/2024 |
| PCS Engineering | 3745 | 1 | 07/14/2024 |
| Madsen Engineering | 5423 | 3 | 02/20/2024 |
| The Eipel Engineering Group | 2714 | 1 | 10/27/2022 |
| Aks Architectural & Engineering | 1957 | 1 | 03/09/2022 |
| Ryan Special Engineering | 2018 | 2 | 03/12/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | Tri-Star Construction | 10/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Tri-Star Construction | 10/08/2026 |
| DOB NOW | General Construction | Permit Issued | Tri-Star Construction | 10/07/2026 |
| DOB NOW | General Construction | Permit Issued | Tri-Star Construction | 09/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | Denko Mechanical | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | Finaly General Contracting | 09/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Finaly General Contracting | 09/01/2026 |
| DOB NOW | Structural | Permit Issued | Tri-Star Construction | 09/01/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Finaly General Contracting | 08/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | Go Pro Fire Protection | 07/30/2026 |
| DOB NOW | Plumbing | Permit Issued | Commerical Plumbing Svces | 07/28/2026 |
| DOB NOW | General Construction | Permit Issued | Tri-Star Construction | 07/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Tri-Star Construction | 07/22/2026 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 06/22/2026 |
| DOB NOW | Structural | Permit Issued | Specialty Construction SY | 04/23/2026 |
| DOB NOW | General Construction | Signed-off | Tri-Star Construction | 02/05/2026 |
| DOB NOW | Plumbing | Permit Issued | Magic Mechanical | 01/23/2026 |
| DOB NOW | General Construction | Permit Issued | Medcon Services | 11/13/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M & L Signs | 07/23/2025 |
| DOB NOW | Sprinklers | Signed-off | Ariana Contracting | 07/21/2025 |
| DOB NOW | General Construction | Signed-off | Icon Interiors | 06/27/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 04/24/2025 |
| DOB NOW | Plumbing | Signed-off | Bedrock Plumbing & Heating | 04/23/2025 |
| DOB NOW | Sprinklers | Signed-off | Bedrock Mechanical | 04/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 04/21/2025 |
| DOB NOW | Plumbing | Signed-off | Copper Mechanical | 03/11/2025 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 02/28/2025 |
| DOB NOW | Structural | Signed-off | Medcon Services | 02/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Medcon Services | 02/05/2025 |
| DOB NOW | General Construction | Signed-off | Medcon Services | 02/04/2025 |
| DOB NOW | Structural | Signed-off | Royal Concrete and Mason* | 02/04/2025 |
| DOB NOW | Structural | Signed-off | Millenium Restoration | 02/03/2025 |
| DOB NOW | Plumbing | Signed-off | City/Suburban Plumbing | 01/28/2025 |
| DOB NOW | Sprinklers | Signed-off | Mora Fire Protection | 01/23/2025 |
| DOB NOW | General Construction | Signed-off | Tri-Star Construction | 01/22/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Tri-Star Construction | 01/22/2025 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 01/09/2025 |
| DOB NOW | General Construction | Signed-off | Tri-Star Construction | 12/19/2024 |
| DOB NOW | Plumbing | Signed-off | Prodigy Plumbing & Heating | 12/19/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/26/2026 | Permit Issued | Finaly General Contracting | Air Conditioning Systems | Cooling Climatemaster SC-018 600 CFM · Wshp ×1 |
| 11/13/2025 | Permit Issued | Tri-Star Construction | Air Conditioning Systems | Cooling Water Furnace UBH015SR001DBNEN2B32SSK 24,000 BTU · Ahu ×4 UBH030SR001DBNEN2B32SSK 12,000 BTU · Ahu ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/06/2026 | — | — | Sprinkler System |
| 09/28/2026 | — | — | Sprinkler System |
| 09/23/2026 | — | — | Sprinkler System |
| 09/01/2026 | — | — | 1 heads |
| 08/26/2026 | Permit Issued | Denko Mechanical | — |
| 08/11/2026 | Permit Issued | Go Pro Fire Protection | Sprinkler System |
| 11/20/2024 | — | — | — |
| 11/20/2024 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/23/2026 | — | — | Water/Sanitary |
| 08/26/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 08/11/2026 | Permit Issued | Complete Plumbing Safety | Water/Sanitary |
| 06/24/2026 | Permit Issued | Magic Mechanical | Gas |
| 11/20/2024 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | Permit Issued | RX Electric | — |
| 10/16/2026 | Permit Issued | RX Electric | General Wiring |
| 10/09/2026 | Permit Issued | Troon Electric of New Yor | General Wiring |
| 09/11/2026 | Permit Issued | MRD Electrical Services | General Wiring |
| 08/06/2026 | Permit Issued | Troon Electric of New Yor | — |
| 08/06/2026 | Permit Issued | Troon Electric of New Yor | — |
| 08/06/2026 | Permit Issued | Troon Electric of New Yor | — |
| 06/04/2026 | Permit Issued | Troon Electric of New Yor | General Wiring |
| 03/02/2026 | Complete | Heso Electrical | General Wiring |
| 11/04/2025 | Permit Issued | Transel Elev. & Electric | General Wiring |
| 11/04/2025 | Permit Issued | Transel Elev. & Electric | General Wiring |
| 11/04/2025 | Permit Issued | Transel Elev. & Electric | General Wiring |
| 10/17/2025 | Complete | Crosswire Electrical | General Wiring |
| 07/10/2025 | Complete | Polo Electric Corp D/B/A | General Wiring |
| 02/04/2025 | Complete | Avalon Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | Tri-Star Construction | Concrete |
| 07/15/2026 | Permit Issued | Specialty Construction SY | Concrete |
| 05/08/2026 | Permit Issued | CPM Builders | 1 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/09/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 12/19/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/06/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/10/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/06/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/20/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/22/2026 | Sprinkler Systems | — | special |
| 09/22/2026 | Final | Michael Carlton | progress |
| 09/22/2026 | Mechanical Systems | — | special |
| 09/22/2026 | Final | — | progress |
| 09/01/2026 | Duct leakage testing, insulation and design | EDWARD TOROSSIAN | energy_progress |
| 09/01/2026 | Energy Code Compliance Inspections | EDWARD TOROSSIAN | progress |
| 08/31/2026 | Final | Michael Carlton | progress |
| 08/31/2026 | Final | EDWARD TOROSSIAN | progress |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/31/2026 | Lighting controls | EDWARD TOROSSIAN | energy_progress |
| 08/31/2026 | Post-installed Anchors | — | special |
| 08/31/2026 | Mechanical Systems | — | special |
| 08/31/2026 | Mechanical Systems | EDWARD TOROSSIAN | special |
| 08/31/2026 | Post-installed Anchors | — | special |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/31/2026 | Interior lighting power | EDWARD TOROSSIAN | energy_progress |
| 08/31/2026 | Sprinkler Systems | — | special |
| 08/31/2026 | Sprinkler Systems | EDWARD TOROSSIAN | special |
| 08/31/2026 | Energy Code Compliance Inspections | EDWARD TOROSSIAN | progress |
| 08/31/2026 | Fire-Resistance Rated Construction | EDWARD TOROSSIAN | progress |
| 08/31/2026 | Final | — | progress |
| 08/31/2026 | Final | EDWARD TOROSSIAN | progress |
| 08/28/2026 | Sprinkler Systems | — | special |
| 08/19/2026 | Energy Code Compliance Inspections | — | progress |
| 08/19/2026 | Masonry | — | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Dealpath | Office | Floor 3 | Project M01464073 |
| Nobu Steak | Restaurant / Food Service | Floor 1, Mezzanine | Project M01065479 |
| Benihana | Restaurant / Food Service | Cellar, Floors 1, 2, Mezzanine | Project M01256200 Project M00848323 Project M00848346 Project M00661148 |
| Nobu | Restaurant / Food Service | Cellar, Floors 1, 2, Mezzanine, Roof | Project M01130225 Project M01098837 Project M01065373 Project M01106768 Project M08007732 Project M08007800 Project M08007824 Project M08007843 Project M08008385 |
| Lee Equity Partners | Office | Floor 16 | Project M01204815 Project M01204905 |
| Loro Piana | Retail | Floor 21 | Project M01151914 |
| MHR Fund Management | Office | Floor 24 | Project M01045286 Project M01045405 Project M01045410 Project M01045414 |
| Duquesne Family Office | Office | Floor 25 | Project M01020110 |
| HPS Investment Partners | Office | Floors 8, 9 | Project M01002313 Project M00963322 Project M00963273 Project M00963339 |
| Gruss & CO | Office | Floor 14 | Project M00952018 |
| McCann | Office | Floors 8, 9 | Project M00912557 Project M00912561 Project M00910004 |
| Moore Holdings | Office | Floor 20 | Project M08051116 Project M08051127 Project M08051153 |
| Givaudan | Office | Floors 10, 11, 17 | Project M00677089 Project M00677106 Project M00669782 Project M00322554 Project M00322584 |
| Darsana Capital Partners | Office | Floor 22 | Project M00666944 Project M00667768 Project M00668009 Project M00668658 |
| Lightyear Capital | Office | Floor 22 | Project M00521851 Project M00521863 Project M00522612 |
| Repe Capital Partners | Office | Floor 28 | Project M00457774 |
| Eastdil Secured | Office | Floor 23 | Project M00305773 Project M00305778 Project M00305783 Project M00336716 |
| HPS Investments | Office | Floors 32–34 | Project M00349759 |
| Access Industries | Office | Floor 28 | Project M00271690 |