HPD09/16/2026567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS, CEILINGS, FLOORS, FIXING LEAKS AND MANAGING GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT AT WEST YARD
HPD09/16/2026§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 26, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD09/16/2026§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE DRAIN PIPE AT BATHTUB IN THE BATHROOM LOCATED AT APT 26, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD09/16/2026§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 26, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD09/16/2026§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 26, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
ECB07/23/2026PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION: OBSERVED THE FOLLOWING. LOOSE/DEFECTED SECTION OF SHED PARAPET CORNER OF EXPOSURE 1 AND 2. REMEDY: COMPLY TO CODE SPECIFICATION.$2K due
DOB07/23/2026FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. DETERIORATION OF BLDG @ EXP1,2&3:CRACKS,STEP CRACKS DAMAGED JOINTS AND BOWED LINTELS CRACK WINDOW PANE AT EXP3.EXP4 DAMAGED WINDOW SILL, SPALLING AND DAMAGED JOINTS. REMEDY: REPAIR AND/OR REPLACE
HPD04/30/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
ECB03/25/2026FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST (1)STEP CRACKED BRICK/MORTARJOINTS, NORTH EAST CORNER OF PARAPET.-EXP #3 WEST-(1)CRACKED/SPALLING/$5K due
HPD06/08/2025§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 34, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD06/08/2025§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BOTTOM SHELF AT SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 34, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
HPD06/03/2025§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 26, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD06/03/2025HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 26, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
DOB04/04/2025FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED @ EXP#1 MULTIPLE CRACKED SPALLING WINDOW SILL @ EXP#2 MULTIPLE CRACKED WINDOW SILLS AND SPALLING. AT EXP#3-OBSERVED SPALLING PAINT/TAR MULTIPLE LOCATION & A STEP CRACK. REMEDY: FIX AND/OR REPLACE
DOB11/13/2019FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB08/23/2019EMERG WRK ORD:PARAPET COPING STONE@EXP1/2 CRNR FELL ON 8/22/19.COPING STONE@EXP1/2 CRNR@RISK OF COLLAP ONTO 1STORY MEDICAL OFFICE ROOF.EXP3 BRICKS@ROOF PART DETACHED FROM STRUCT& @RISK OF COLLAP INTO EXP3 REAR YARD.OWN RETAIN PE CONTR IMMED TEMP BRACE OR REMOVE LOOSE COPING STONE INSTL SHED@EXP3.WRK UND CONT&DIR SUPV PE.FILE WITHIN 2 BUSS DAYS STRT
DOB08/23/2019FTM:COPING STONE@EXP 1/2 FELL TO SIDEWALK ON 8/22/19.STEEL DUNNAGE@EXP 3/4 CRNR BEARING ON PARAPET WALL.EXP3 BRICK CHIMNEY HAD PART DETACHED BRICKS 4'LONG AT RISK OF PART COLLAP INTO REAR YARD.OWNR RETAIN PE TO EVAL ENTIRE BLDG INCL ROOF,PARAPET,CONNECT,CHIM&FACADES.PE TO PREPARE REPR DWGS.REPRS TO START UNDER PERMIT BY 9/30/19 & BE CMPL BY 12/30/19
ECB08/22/2019FAILURE TO MAINTAIN BUILDING WALLS NOTED AT TIME OF INSPECTION OBSERVED COING STONE APPROX 10 IN X 3 FT FALLEN FROM TO LEFT HAND CORNER 9EXPOSURE 1&2) AND LANDED ON PULIC SIDEWALK REPAIR DEFECTS MAINTAIN BUILDI$12K due
ECB10/08/2019FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER/BLDG WALLS ON APPURTENANCES. OBSERVED COPING STONE APPROX 10 IN X 3FT FALLEN FROM LEFT HANDCORNER. REMEDY: MAINTAIN BLDG WALLS.Nothing owed — awaiting certificate of correction