← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Century Tower Condominium
400 EAST 90TH STREET · BIN 1087460
💬 Discuss this project
1999Year Built
23Stories
RMBuilding Class
C2-8Zoning
103,375 sfGross Floor Area
130Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Century Tower Condominium · 9,682 sf lot · 10.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 11Unit 11E1 filing · 2 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Pure Barre, Starbucks +1Under Construction77p · 6 filings · 20 docs
Site & exteriorStarbucks5p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RFR Realty2410/13/2026
RFD 90th & 1st1403/21/2026
Century Tower Condominium503/21/2026
Jordon Cooper403/21/2026
Jordan Cooper & Associates403/21/2026
N7 Owner203/21/2026
Longfellow Properties103/21/2026
Mobile Oil103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Elcherbini Architect107/14/2026
CFS Engineering303/27/2026
Concord Associates303/26/2026
The Golden Mean Group103/26/2026
Leon Skvirsky PE111/24/2025
Focal Point Architects & Associates109/15/2025
Ancora Engineering104/24/2025
Ware Malcomb212/04/2024
Ashraf104/15/2024
MG Engineering201/17/2024
Catapano Engineering109/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Empire City Consultants803/21/2026
Metropolis Group603/21/2026
Expedite Dem203/21/2026
Catapano Engineering203/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Barton ConstructionGeneral Contractor306/27/2026
Piece ManagementGeneral Contractor306/28/2026
Production ContractingGeneral Contractor303/21/2026
Surepower ElectricElectrical203/21/2026
National Retail ConstructionGeneral Contractor207/08/2026
National MaintenanceSign hanger107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Raptor MechanicalPlumbing107/08/2026
Gotham Wiring LicensedElectrical103/22/2026
Schumacher & Farley P&HPlumbing107/08/2026
Richard Wehner Electrical ContElectrical103/21/2026
Level Up PlumbingFire Protection110/13/2026
Alba ServicesGeneral Contractor104/09/2026
Platinum Services NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355107/14/2026
Shahrish Shuvo Engineering8524403/27/2026
SGM Engineering2366403/26/2026
Ancora Engineering6818104/24/2025
Aks Architectural & Engineering1957201/17/2024
Catapano Engineering & AR3235109/24/2019
Building Lifecycle
All (149)Filed (17)Permit Issued (14)Signed Off (7)Facade (FISP) (15)Violation (60)Inspection (2)Objection (4)Special Inspection (30)
10/12/2026
Permit issued — Sprinklers
M01366909-S3-EW-SP
10/07/2026
Signed off — Alteration
M00202448-I1
08/12/2026
Signed off — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-S1
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
08/04/2026
Objection raised — Scope
08/04/2026
Objection raised — Cost
07/14/2026
Filed — Alteration
Interior renovation of bathroom in Apt 11E. All as per plans and applications. No change in use, egress or occupancy.
M01424413-I1
06/30/2026
Special inspection requirement — Final
ABDALLAH ELCHERBINI
06/24/2026
Violation issued (ECB, closed)
Construction
06/22/2026
Permit issued — Mechanical Systems
M00202448-I1-MS
06/15/2026
Signed off — Alteration
M01312578-I1
05/11/2026
Permit issued — Plumbing
M01366909-S2-PL
05/01/2026
Permit issued — General Construction
M01366909-I1-GC
05/01/2026
Permit issued — Mechanical Systems
M01366909-S1-MS
04/13/2026
Signed off — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-I1
04/07/2026
Signed off — Alteration
New Sheetrock Ceiling, Painting, New Flooring and replacement of handrails, No change in Occupancy, Egress or Use.
M01214313-I1
03/30/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
03/30/2026
Special inspection requirement — Final
Shahrish Shuvo
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Shahrish Shuvo
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
03/30/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
03/30/2026
Special inspection requirement — Shutoff dampers
Shahrish Shuvo
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
03/30/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
03/27/2026
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-P1
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-S1
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-S3
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-S2
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-I1
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
03/25/2026
Special inspection requirement — Lighting controls
steven Giammona
03/25/2026
Special inspection requirement — Interior lighting power
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
03/23/2026
Special inspection requirement — Maintenance information
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
03/23/2026
Special inspection requirement — Shutoff dampers
steven Giammona
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
03/23/2026
Special inspection requirement — Maintenance information
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
12/02/2025
Permit issued — Sign
M01312578-I1-SG
11/25/2025
Permit issued — Plumbing
M01281201-S2-PL
11/24/2025
Filed — Alteration
M01312578-I1
11/05/2025
Permit issued — Mechanical Systems
M01281201-S1-MS
10/08/2025
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-S2
09/24/2025
Permit issued — General Construction
M01281201-I1-GC
09/19/2025
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-S1
09/15/2025
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-I1
05/02/2025
Permit issued — General Construction
M01214313-I1-GC
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedLevel Up Plumbing10/12/2026
DOB NOWMechanical SystemsSigned-offPiece Management06/22/2026
DOB NOWPlumbingPermit IssuedGregg NY Plumbing05/11/2026
DOB NOWGeneral ConstructionPermit IssuedNational Retail Construction05/01/2026
DOB NOWMechanical SystemsPermit IssuedNational Retail Construction05/01/2026
DOB NOWSignSigned-offNational Maintenance12/02/2025
DOB NOWPlumbingPermit IssuedRaptor Mechanical11/25/2025
DOB NOWMechanical SystemsSigned-offBarton Construction11/05/2025
DOB NOWGeneral ConstructionSigned-offBarton Construction09/24/2025
DOB NOWGeneral ConstructionSigned-offAlba Services05/02/2025
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY04/17/2024
DOB NOWPlumbingSigned-offSchumacher & Farley P&H11/03/2022
DOB NOWGeneral ConstructionSigned-offProduction Contracting11/03/2022
DOB NOWMechanical SystemsSigned-offPiece Management10/11/2019
BISEQISSUEDRock Group NY08/04/2020
BISEQISSUEDRock Group NY02/14/2019
BISEQISSUEDRock Group NY08/30/2018
BISOTISSUEDDJM NYC08/23/2018
BISEQISSUEDRock Group NY02/08/2018
BISOTISSUEDDJM NYC11/03/2017
BISEQISSUEDRock Group NY09/22/2017
BISMHISSUEDElite GC NY05/15/2017
BISPLISSUEDL&J PLG & Heating Co of NY03/24/2017
BISEQISSUEDRock Group NY02/24/2017
BISOTISSUEDElite GC NY02/23/2017
BISPLISSUEDTW Plumbing & Heating12/16/2016
BISOTISSUEDAugust Construction Group10/18/2016
BISPLISSUEDParkset Plumbing Co09/26/2016
BISPLISSUEDPeter Plumbing Associates05/13/2015
BISOTISSUEDHD HVAC of NY05/11/2015
BISMHISSUEDTitan Mechanical Services04/17/2015
BIS—ISSUEDMauceri Sign Co03/20/2013
BISOTISSUEDLelcaj Construction08/02/2012
BISOTISSUEDRSM Maintenance12/15/2011
BISMHISSUEDRSM Maintenance12/15/2011
BISPLISSUEDPractical Plumbing & Heating02/08/2010
BISPLRE-ISSUEDStephen Foy Mechanical Service12/08/2009
BISOTISSUEDD.D. Interiors12/04/2009
BISOTISSUEDRCD Restorations10/05/2006
BISEQISSUEDEverest Scaffolding08/08/2006
+ 24 more permits on file
1 project · most recent 03/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Signed-offBarton ConstructionAir Conditioning Systems
Cooling
Sigma SDSH-C.2-120-2 4,000 CFM ×2
1 project · most recent 03/26/2026
Sprinkler System
FiledStatusContractorScope
03/26/2026Permit IssuedLevel Up PlumbingSprinkler System
2 projects · most recent 03/27/2026
Water/Sanitary
FiledStatusContractorScope
03/27/2026Permit IssuedRaptor MechanicalWater/Sanitary
03/26/2026Permit IssuedGregg NY PlumbingWater/Sanitary
13 projects · most recent 06/02/2026
General Wiring Lighting
FiledStatusContractorScope
06/02/2026Permit IssuedEuro Electrical ContractingGeneral Wiring
04/23/2026Permit IssuedHome Run Electric—
10/06/2025Permit IssuedSurepower ElectricGeneral Wiring
10/06/2025Permit IssuedSurepower Electric—
09/30/2025CompleteModern Voltage NYC—
04/24/2025Permit IssuedAlba ElectricGeneral Wiring
12/23/2024Permit IssuedApollo Electric NYGGeneral Wiring
04/18/2024Permit IssuedIlluminous Electric—
12/05/2023CompleteAccurate ElectricalGeneral Wiring
10/26/2022Permit IssuedRobert Chimenti7 meters, 1 new_meters
12/11/2020Permit IssuedCandela Systems Corp DbaLighting
10/13/2019CompleteAster Electric—
08/12/2019CompleteGotham Wiring LicensedGeneral Wiring
1 project · most recent 03/26/2026
FiledStatusContractorScope
03/26/2026Permit IssuedLevel Up Plumbing1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
08/05/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
06/30/2026FinalABDALLAH ELCHERBINIprogress
03/30/2026Mechanical SystemsShahrish Shuvospecial
03/30/2026FinalShahrish Shuvoprogress
03/30/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
03/30/2026Duct leakage testing, insulation and designShahrish Shuvoenergy_progress
03/30/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
03/30/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
03/30/2026Maintenance informationShahrish Shuvoenergy_progress
03/30/2026Shutoff dampersShahrish Shuvoenergy_progress
03/30/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
03/30/2026Post-installed AnchorsShahrish Shuvospecial
03/30/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
03/26/2026Tenant Protection Plan Compliancesteven Giammonaspecial
03/26/2026Tenant Protection Plan Compliancesteven Giammonaspecial
03/26/2026Tenant Protection Plan Compliancesteven Giammonaspecial
03/25/2026Lighting controlssteven Giammonaenergy_progress
03/25/2026Interior lighting powersteven Giammonaenergy_progress
03/23/2026HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
03/23/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
03/23/2026Energy Code Compliance Inspectionssteven Giammonaprogress
03/23/2026HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
03/23/2026Maintenance informationsteven Giammonaenergy_progress
03/23/2026HVAC-R and service water heating system controlssteven Giammonaenergy_progress
03/23/2026Shutoff damperssteven Giammonaenergy_progress
Latest 25 of 51.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pure BarreFitness / RecreationFloor 1
Project M01366909 Alteration CO · Permit Entire · 03/26/2026
StarbucksRestaurant / Food ServiceFloor 1
Project M01312578 Alteration · LOC Issued · 11/24/2025
Project M08016854 Alteration · LOC Issued · 10/25/2022
Project M08020808 Alteration · LOC Issued · 10/25/2022
Project M00202448 Alteration · LOC Issued · 09/24/2019
Zing KidsEducationFloor 1
Project M01214313 Alteration · LOC Issued · 04/24/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 280 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/01/2026M08020808-P1Request digital key ↗
09/01/2026M08020808-I1Request digital key ↗
08/27/2026M01035355-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00202448-I1Request digital key ↗
▸Applications & Permits47
▸BISWORK PERMIT APPLICATION25
02/15/2019140608028Open ↗
08/24/2018123301382Open ↗
02/14/2018140608028Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
12/02/2020140691534Open ↗
08/10/2020140691534Open ↗
06/22/2018122966022Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/01/2015122379247Open ↗
▸Seals & Professional Certifications90
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
11/27/2018122966022Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00202448-I1Open ↗
09/01/2026M08020808-P1Open ↗
09/01/2026M08020808-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/05/2026M01366909-S2Open ↗
09/05/2026M01366909-S2Open ↗
08/28/2026M01214313-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
10/05/2026M01366909-S3Open ↗
09/05/2026M01366909-S2Open ↗
08/28/2026M01214313-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/12/2015122379247Open ↗
04/30/2015122370488Open ↗
03/21/2013121554031Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/21/2013121554031Open ↗
08/06/2012121176912Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
06/22/2018122966022Open ↗
04/20/2017122966022Open ↗
12/15/2016122966022Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/23/2016140553381Open ↗
10/18/2011120854370Open ↗
11/20/2009120153252Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
09/15/2015122379247Open ↗
07/17/2015122379247Open ↗
03/05/2010120198838Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/09/2016122370488Open ↗
04/30/2015122370488Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/30/2015122370488Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes5
08/16/2017123301382Open ↗
08/08/2017123301382Open ↗
10/14/2016122912857Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
12/15/2016122966022Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00202448-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026M01366909-I1Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS-CERTIFICATION (DEP ACP5)5
10/18/2011120854370Open ↗
10/18/2011120854370Open ↗
10/18/2011120854370Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00202448-I1Open ↗
09/01/2026M08020808-I1Open ↗
09/01/2026M08020808-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
08/16/2017123301382Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
05/22/2017140553381Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
10/18/2011120854370Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/23/2016140553381Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/23/2016140553381Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/13/2020140691534Open ↗
08/10/2020140608028Open ↗
09/21/2017140691534Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
12/09/2020140691534Open ↗
08/10/2020140608028Open ↗
08/29/2019123301382Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/21/2013121554031Open ↗
08/06/2012121176912Open ↗
Showing 2 of 4 on file for this type
▸BISSHED LETTER3
02/15/2019140608028Open ↗
02/15/2019140608028Open ↗
02/14/2018140608028Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/22/2017140553381Open ↗
10/01/2015122379247Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
08/08/2017123301382Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
08/08/2017123301382Open ↗
12/15/2016122966022Open ↗
10/14/2016122912857Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
08/28/2019123301382Open ↗
06/26/2018122966022Open ↗
05/25/2018140608028Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
06/22/2018122966022Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
▸Other Documents4
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
02/23/2017140608028Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/06/2012121176912Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/18/2026M01366909-I1Open ↗