Office, 20+ stories, with or without commercial
400 PARK AVENUE
MANHATTAN · BIN 1035751
💬 Discuss this project
1957Year Built
21Stories
O4Building Class
C5-3Zoning
214,392 sfGross Floor Area
20Units
LL97 Covered3 Open Violations ▸FISP: SAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: LBB 400 LLC · 12,552 sf lot · 17.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 4 filings · 20 docs
Floor 231p · 1 filing · 6 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 174p · 2 filings · 17 docs
Floor 163p · 1 filing · 11 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 86p · 1 filing · 5 docs
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 13 docs
Floor 3
Floor 2
Floor 1
Cellar2p · 1 filing · 6 docs
Basement2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERMAN PROPERTIES35109/13/2026
WATERMAN 400 PARK ASSOCIATES14407/08/2026
LBB 400 LLC103/22/2026
LBB 400 LLC WATERMAN 400103/22/2026
PARK AVENUE 400 PARTNERSHIP10103/22/2026
OWNER OF 400 PARK AVE203/22/2026
PARK AVE 400 PARTNERS203/22/2026
PROPERTIES WATERMAN103/22/2026
RFR REALTY503/21/2026
HORIZON REALTY MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMANI CONSULTING403/21/2026
AE DESIGN SOLUTION203/21/2026
RIZZO GROUP203/21/2026
BUILDING BROTHERS203/21/2026
JP EXPEDITE203/21/2026
W J PROFESSIONAL EXPEDITING COMPANY203/21/2026
A1 EXPEDITING SERVICE CORP.603/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COASTAL WATERPROOFING LLCGeneral Contractor607/08/2026
PERFORMANCE MECHANCIALGeneral Contractor307/08/2026
RC3 ELECTRIC, LLCGeneral Contractor303/21/2026
A.W. & S. CONSTRUCTION COGeneral Contractor203/21/2026
IMPERATO, NICHOLASElectrical203/21/2026
S.B.A. PLUMBING CORPPlumbing207/08/2026
LEVINE, GEORGEFire Protection203/21/2026
MOREHOUSE, DAVIDElectrical203/21/2026
SALCEDO, PEDROElectrical103/21/2026
S&P ELECTRIC CO LLCElectrical103/22/2026
SPIELER, RONALDElectrical103/21/2026
ZITO, ROCCOElectrical103/21/2026
A&M WARSHAW SERVICES LLCFire Protection107/08/2026
BUILD-SOURCE CORPGeneral Contractor104/09/2026
COLGATE ENTERPRISE CORPGeneral Contractor107/08/2026
SPK/LEWIS CONSTRUCTION LLGeneral Contractor107/08/2026
WILLIAM C. GERAKARIS P&HPlumbing107/08/2026
BALATON CONSULTING LLCScaffold107/08/2026
ASANKOMAH, KOFIElectrical103/21/2026
SIGNS CADScaffold107/08/2026
CAPITOL CONCRETEElectrical103/21/2026
CARPIO, DANNYElectrical103/21/2026
GURWITZ, LElectrical103/21/2026
HIRSCH, HOWARDElectrical103/21/2026
LOCAL 580 IRON WORKERSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983201/15/2026
SCHERER DESIGN GROUP7921206/13/2023
SRW ENGINEERING & ARCHITE1162110/04/2022
CANY ARCHITECTURE & ENGIN1125111/29/2021
DNA CONTROLLED INSPECTION554111/29/2021
P.A.COLLINS INSPECTIONS P2168202/24/2020
Building Lifecycle
All (168)Filed (18)Permit Issued (21)Signed Off (14)Facade (FISP) (21)Violation (60)Inspection (2)Objection (8)Special Inspection (24)
07/06/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01388017-I1
05/21/2026
Permit issued — Suspended Scaffold
M01388017-I1-SC
05/05/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01388017-I1
02/19/2026
Signed off — Alteration
Minor alterations to the corner office space on the 16th FL at 400 Park Ave.
M00595095-I1
02/04/2026
Cycle 9 facade report signed — SAFE
02/03/2026
Violation issued (FDNY_NOV, closed)
01/29/2026
Cycle 9 facade report submitted
01/28/2026
Signed off — Alteration
General construction and associated structural work taking place for facade repairs. No change in use, egress or occupancy.
M01084659-I1
01/19/2026
Cycle 9 facade inspection completed
01/15/2026
Filed — Alteration
General construction and associated structural work taking place for facade repairs. No change in use, egress or occupancy.
M01084659-P1
12/18/2025
Filed — Alteration
Minor alterations to the corner office space on the 16th FL at 400 Park Ave.
M00595095-P1
11/14/2025
Cycle 9 facade report signed — SWARMP
10/27/2025
Cycle 9 facade report submitted
10/23/2025
Cycle 9 facade inspection completed
10/21/2025
Permit issued — Suspended Scaffold
M01138329-I1-SC
09/05/2025
Permit issued — Structural
M01084659-I1-GC-CX
05/02/2025
Special inspection requirement — Final
DANIEL SHANNON
03/28/2025
Signed off — Alteration
Brick masonry repairs, including brick replacement, repointing, crack repairs and corner rebuilding.
M00605053-I1
03/24/2025
Signed off — Alteration
Construction work on the 4th floor includes removing and installing partitions, doors, and finishes. No change in uses, egress, or occupancy is involved.
M01169929-S1
03/24/2025
Signed off — Alteration
Construction work on the 4th floor includes removing and installing partitions, doors, and finishes. No change in uses, egress, or occupancy is involved.
M01169929-I1
03/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2025
Permit issued — Plumbing
M01169929-S1-PL
02/20/2025
Permit issued — General Construction
M01169929-I1-GC
02/13/2025
Signed off — Alteration
Verizon New Installation - Installing 12 antennas, 12 RRH units, 2 GPS units and a new steel platform with equipment cabinets. Related conduit run from cellar, floors 1 to 23, to roof.
M08011734-I1
02/11/2025
Filed — Alteration
Construction work on the 4th floor includes removing and installing partitions, doors, and finishes. No change in uses, egress, or occupancy is involved.
M01169929-S1
02/11/2025
Filed — Alteration
Construction work on the 4th floor includes removing and installing partitions, doors, and finishes. No change in uses, egress, or occupancy is involved.
M01169929-I1
02/04/2025
Special inspection requirement — Lighting controls
Yuji Kaneko
02/04/2025
Special inspection requirement — Interior lighting power
Yuji Kaneko
01/21/2025
Special inspection requirement — Final
Yuji Kaneko
11/20/2024
Permit issued — Suspended Scaffold
M01138329-I1-SC
11/12/2024
Cycle 9 facade report submitted
11/12/2024
Cycle 9 facade report signed — SWARMP
11/06/2024
Filed — Alteration
M01138329-I1
11/05/2024
Cycle 9 facade inspection completed
10/22/2024
Permit issued — Structural
M01084659-I1-GC-CX
08/14/2024
Filed — Alteration
General construction and associated structural work taking place for facade repairs. No change in use, egress or occupancy.
M01084659-I1
06/21/2024
Permit issued — Antenna
M08011734-I1-AN
03/13/2024
Signed off — Alteration
FILING FOR THE REPLACEMENT OF EXISTING WATER COOLED AC UNITS WITH NEW UNITS AND CONNECT TO EXISTING DUCTWORK EVAPORATOR UNITS IN FIRST FLOOR CEILING, CONDENSER UNITS IN BASEMENT AND SPECIFIED APPURTANANCES TO BE REPLACED. NO CHANGE IN EGRESS, USE OR OCC.
M00667496-I1
03/04/2024
Violation issued (FDNY_NOV, closed)
10/19/2023
Cycle 9 facade report submitted
10/19/2023
Cycle 9 facade report signed — SWARMP
09/01/2023
Permit issued — General Construction
M00605053-I1-GC-CX
08/23/2023
Cycle 9 facade inspection completed
06/13/2023
Filed — Alteration
Verizon New Installation - Installing 12 antennas, 12 RRH units, 2 GPS units and a new steel platform with equipment cabinets. Related conduit run from cellar, floors 1 to 23, to roof.
M08011734-P1
04/11/2023
Permit issued — Mechanical Systems
M00667496-I1-MS
03/18/2023
Violation issued (FDNY_NOV, closed)
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2023
Violation issued (FDNY_ORDER, closed)
12/21/2022
Objection raised — Scope
12/21/2022
Objection resolved — Addressed
12/13/2022
Objection raised — Scope
12/13/2022
Objection resolved — Addressed
12/13/2022
Objection raised — Zoning
12/13/2022
Objection resolved — Addressed
12/13/2022
Objection raised — Inspections
12/13/2022
Objection resolved — Addressed
12/07/2022
Filed — Alteration
Verizon New Installation - Installing 12 antennas, 12 RRH units, 2 GPS units and a new steel platform with equipment cabinets. Related conduit run from cellar, floors 1 to 23, to roof.
M08011734-I1
10/19/2022
Permit issued — Mechanical Systems
M00667496-I1-MS
10/04/2022
Filed — Alteration
FILING FOR THE REPLACEMENT OF EXISTING WATER COOLED AC UNITS WITH NEW UNITS AND CONNECT TO EXISTING DUCTWORK EVAPORATOR UNITS IN FIRST FLOOR CEILING, CONDENSER UNITS IN BASEMENT AND SPECIFIED APPURTANANCES TO BE REPLACED. NO CHANGE IN EGRESS, USE OR OCC.
M00667496-I1
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S05/21/2026
DOB NOWSuspended ScaffoldPermit IssuedCOASTAL WTRPRFG LLC10/21/2025
DOB NOWStructuralSigned-offCOASTAL WATERPROOFING LLC09/05/2025
DOB NOWPlumbingSigned-offS.B.A. PLUMBING CORP02/24/2025
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL02/20/2025
DOB NOWSuspended ScaffoldPermit IssuedCOASTAL WTRPRFG LLC11/20/2024
DOB NOWStructuralSigned-offCOASTAL WATERPROOFING LLC10/22/2024
DOB NOWAntennaSigned-offRC3 ELECTRIC, LLC06/21/2024
DOB NOWGeneral ConstructionSigned-offCOASTAL WATERPROOFING LLC09/01/2023
DOB NOWMechanical SystemsSigned-offPERFORMANCE MECHANCIAL04/11/2023
DOB NOWMechanical SystemsSigned-offPERFORMANCE MECHANCIAL10/19/2022
DOB NOWStructuralSigned-offCOASTAL WATERPROOFING LLC07/21/2022
DOB NOWGeneral ConstructionSigned-offBUILD-SOURCE CORP11/15/2021
DOB NOWSignSigned-offSIGNS CAD CORP09/28/2020
DOB NOWMechanical SystemsSigned-offA.W. & S. CONSTRUCTION CO07/09/2020
DOB NOWMechanical SystemsSigned-offA.W. & S. CONSTRUCTION CO03/05/2020
DOB NOWSprinklersSigned-offA&M WARSHAW SERVICES LLC03/04/2020
DOB NOWSprinklersSigned-offWILLIAM C. GERAKARIS P&H03/03/2020
DOB NOWPlumbingSigned-offS.B.A. PLUMBING CORP11/26/2019
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO02/06/2018
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP01/12/2018
BISOTISSUEDA.W. & S. CONSTRUCTION CO06/30/2020
BISOTISSUEDA.W. & S. CONSTRUCTION CO06/30/2020
BISOTISSUEDA.W. & S. CONSTRUCTION CO02/26/2020
BISOTISSUEDA.W. & S. CONSTRUCTION CO02/26/2020
BISOTISSUEDCORE FOUR CONSTRUCTION IN08/21/2019
BISOTISSUEDAMERICON CONSTRUCTION INC.06/27/2019
BISSPISSUEDSTANDARD FIRE SUPP CORP05/29/2019
BISOTISSUEDCOBURN PROJECT INTERIORS04/05/2019
BISSPISSUEDAGGRESSIVE FIRE PROT LLC02/25/2019
BISPLISSUEDS.B.A. PLUMBING CORP11/07/2018
BISOTISSUEDAMERICON CONSTRUCTION INC.11/05/2018
BISMHISSUEDAMERICON CONSTRUCTION INC.11/05/2018
BISPLISSUEDPAR PLUMBING CO., INC10/23/2018
BISMHISSUEDLB PHILIPS, LLC10/18/2018
BISOTISSUEDLB PHILIPS, LLC10/18/2018
BISSPISSUEDSTANDARD FIRE SUPP CORP09/11/2018
BISMHISSUEDKABACK ENTERPRISES INC08/21/2018
BISPLISSUEDTRISTATE PLBG SVCS CORP08/03/2018
BISSPISSUEDSTANDARD FIRE SUPP CORP07/18/2018
+ 31 more permits on file
10 projects · most recent 09/17/2025
General Wiring Lighting
FiledStatusContractorScope
09/17/2025CompleteATLAS-ACON ELEC. SERVICE1 meters
02/20/2025CompleteROBERT B SAMUELS, INC—
11/22/2024CompleteATLAS-ACON ELEC. SERVICE—
08/10/2020Permit IssuedQUEUE ELEC'L CONTRS, INCGeneral Wiring
07/26/2019Permit IssuedRAIDEN ELECTRIC LLCGeneral Wiring
03/14/2019CompleteNEAD ELECTRIC INC.General Wiring
03/08/2018Permit IssuedADCO ELEC'L CORPGeneral Wiring, Lighting
02/13/2018CompleteS&P ELECTRIC CO LLCGeneral Wiring
02/06/2018CompleteROBERT B. SAMUELS, INC.—
01/10/2018CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 05/05/2026
FiledStatusContractorScope
05/05/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/02/2025FinalDANIEL SHANNONprogress
02/04/2025Lighting controlsYuji Kanekoenergy_progress
02/04/2025Interior lighting powerYuji Kanekoenergy_progress
01/21/2025FinalYuji Kanekoprogress
09/21/2022Fire-Resistant Penetrations and JointsYvette Richardsonspecial
09/21/2022HVAC-R and service water heating system controlsYvette Richardsonenergy_progress
09/21/2022Maintenance informationYvette Richardsonenergy_progress
09/21/2022HVAC-R and service water heating equipmentYvette Richardsonenergy_progress
09/21/2022HVAC-R and service water piping design and insulationYvette Richardsonenergy_progress
01/24/2022FinalYvette Richardsonprogress
01/24/2022Mechanical SystemsYvette Richardsonspecial
11/29/2021MasonryERIN FISHERspecial
10/04/2021Structural Steel - WeldingWILLIAM FITZJOHNspecial
10/04/2021Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
10/04/2021FinalERIN FISHERprogress
09/14/2020FinalHackjong Choiprogress
02/12/2020Post-installed AnchorsPaul Collinsspecial
02/12/2020Maintenance informationPaul Collinsenergy_progress
01/27/2020HVAC and service water heating equipmentPaul Collinsenergy_progress
01/27/2020Sprinkler SystemsPaul Collinsspecial
01/27/2020FinalPaul Collinsprogress
01/27/2020HVAC insulation and sealingPaul Collinsenergy_progress
01/27/2020Mechanical SystemsPaul Collinsspecial
01/27/2020HVAC and service water heating system controlsPaul Collinsenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DLI North AmericaOfficeFloor 4
Project M01169929 Alteration · LOC Issued · 02/11/2025
City National BankOfficeFloor 8
Project M00227870 Alteration · LOC Issued · 11/13/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 2,833 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch14
09/06/2026M00010349-I1Request digital key ↗
09/06/2026M00008901-I1Request digital key ↗
09/03/2026M00605053-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00227870-I1Request digital key ↗
09/05/2026M00303949-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00303949-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00398635-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00303924-I1Request digital key ↗
▸Applications & Permits566
▸BISPLAN / WORK APPROVAL APPLICATION327
02/23/2023123339468Open ↗
02/21/2023123339468Open ↗
02/17/2023123339468Open ↗
Showing 3 of 327 on file for this type
▸BISWORK PERMIT APPLICATION238
03/02/2020123703386Open ↗
03/02/2020123703386Open ↗
08/21/2019123753900Open ↗
Showing 3 of 238 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications770
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION453
03/02/2020123703386Open ↗
03/02/2020123703386Open ↗
03/02/2020123703386Open ↗
Showing 3 of 453 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT111
03/02/2020123703386Open ↗
03/02/2020123703386Open ↗
07/24/2019123753900Open ↗
Showing 3 of 111 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST110
03/02/2020123703386Open ↗
07/24/2019123753900Open ↗
04/26/2019123893340Open ↗
Showing 3 of 110 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM57
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 57 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/06/2026M00010349-I1Open ↗
09/06/2026M00008901-I1Open ↗
09/05/2026M00303924-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/29/2026M00605053-I1Open ↗
09/01/2026M01169929-I1Open ↗
09/01/2026M01169929-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/29/2026M00605053-I1Open ↗
09/29/2026M00605053-I1Open ↗
08/28/2026M00667496-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment305
▸BISSELF-CERT PLUMBING NOTICE82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 82 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE79
12/17/2019123417089Open ↗
06/05/2019123450274Open ↗
05/31/2019123450274Open ↗
Showing 3 of 79 on file for this type
▸BISSCHEDULE B - PLUMBING43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA40
02/22/2024123339468Open ↗
10/08/2019123517462Open ↗
Showing 2 of 40 on file for this type
▸BISEQUIPMENT USE PERMITS26
10/28/2020123517435Open ↗
10/28/2020123517435Open ↗
Showing 2 of 26 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT19
10/28/2020123517435Open ↗
Showing 1 of 19 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8513
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE SIGNOFF1
06/02/2020121334877Open ↗
▸Environmental & Asbestos219
▸BISASBESTOS: CERTIFICATION (DEP ACP5)127
03/02/2020123703386Open ↗
07/24/2019123753900Open ↗
04/26/2019123893340Open ↗
Showing 3 of 127 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸DOB NOWOER: Notice to Proceed13
09/06/2026M00010349-I1Open ↗
09/06/2026M00008901-I1Open ↗
08/13/2026M00227870-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/05/2026M00303924-I1Open ↗
09/01/2026M00667496-I1Open ↗
08/24/2026M01169929-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction11
09/06/2026M00010349-I1Open ↗
09/06/2026M00008901-I1Open ↗
08/13/2026M00605053-I1Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
02/26/2020123703386Open ↗
08/19/2019123753900Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/15/2024123339468Open ↗
▸Energy Compliance148
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS97
03/02/2020123703386Open ↗
03/02/2020123703386Open ↗
07/24/2019123753900Open ↗
Showing 3 of 97 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS26
10/26/2020123517435Open ↗
07/18/2020123753900Open ↗
07/24/2019123380331Open ↗
Showing 3 of 26 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/26/2020123517435Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 2ND REVIEW1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY9
05/10/2021123893340Open ↗
10/26/2020123517435Open ↗
10/26/2020123517435Open ↗
Showing 3 of 9 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs195
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST112
04/16/2024123339468Open ↗
05/10/2021123893340Open ↗
10/26/2020123517435Open ↗
Showing 3 of 112 on file for this type
▸BISADMINISTRATIVE OBJECTIONS51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
09/04/2020123893340Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership263
▸BISCOST AFFIDAVIT261
04/15/2024123339468Open ↗
05/10/2021123893340Open ↗
10/26/2020123517435Open ↗
Showing 3 of 261 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/15/2024123339468Open ↗
06/08/2020121334877Open ↗
▸Filing & Intake Forms312
▸BISEFILING COVER SHEET199
03/02/2020123703386Open ↗
03/02/2020123703386Open ↗
07/24/2019123753900Open ↗
Showing 3 of 199 on file for this type
▸BISBOROUGH INTAKE FORM62
12/17/2019123417089Open ↗
12/09/2019121334877Open ↗
09/06/2019121334877Open ↗
Showing 3 of 62 on file for this type
▸BISADDITIONAL INFORMATION49
12/20/2019123417089Open ↗
12/12/2019123517435Open ↗
11/18/2019123517435Open ↗
Showing 3 of 49 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
06/08/2020121334877Open ↗
05/29/2020121334877Open ↗
Showing 2 of 10 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISARA Supporting Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01138329-I1Open ↗
▸DOB NOWIRA Certification1
08/17/2026M01388017-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01138329-I1Open ↗