← Back
BuildNYC
Miscellaneous commercial condo
401 7TH AVENUE
MANHATTAN · BIN 1015191
💬 Discuss this project
1917Year Built
23Stories
R5Building Class
C6-6Zoning
152,460 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized13 Active Violations 32 old, status unconfirmed ▸FISP: No Report Filed
Miscellaneous commercial condo · Owner of record: Grapstein · 79,000 sf lot · 1.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPennsylvania Hotel, Copeland13 filings
RoofVORnADO6p · 3 filings · 20 docs
BulkheadVORnADO6p · 1 filing · 20 docs
Floor 18Temporary scaffold installation1p · 1 filing
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7VORnADO1 filing · 20 docs
Floor 6VORnADO1 filing · 20 docs
Floor 5VORnADO1 filing · 20 docs
Floor 4VORnADO1 filing · 20 docs
Floor 3VORnADO1p · 1 filing · 20 docs
Floor 2VORnADO11p · 9 filings · 20 docs
Floor 1Hotel Pennsylvania26p · 14 filings · 20 docs
MezzanineHotel Pennsylvania10p · 9 filings · 20 docs
CellarHotel Pennsylvania, Marquis Lighting16p · 9 filings · 20 docs
Sub-CellarVORnADO29p · 8 filings · 20 docs
Sub-BasementVornado Realty Trust1p · 1 filing · 8 docs
Site & exteriorHotel Pennsylvania - 401 7th Avenue VornadoUnder Construction9 filings · 20 docs
Filed — no permit issuedSubway stair closing signage1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
401 Commercial19003/21/2026
Vornado Realty Trust14207/08/2026
401 Hotel TRS1103/21/2026
Hotel Penn603/21/2026
Safeway Atlantic403/21/2026
15 Penn Plaza Associates403/21/2026
Bally Total Fitness Co203/21/2026
Sports Authority103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service5203/21/2026
Howard I Shapiro Associates5603/21/2026
Municipal Building Consultants203/21/2026
Gillman Consulting5003/21/2026
Archetype Consultants1603/21/2026
DY Expediting203/21/2026
AE Design Solution403/21/2026
Conapac Services Dba103/21/2026
RPO403/21/2026
Codegreen203/21/2026
Rip CC203/21/2026
Synergy Building Consultants103/21/2026
Conapac Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Northstar Contracting GroupGeneral Contractor5707/08/2026
S&E Bridge & ScaffoldScaffold3209/16/2026
Northstar Contracting GroupScaffold2607/08/2026
Turner Construction CompanyGeneral Contractor807/08/2026
Safway AtlanticScaffold607/08/2026
Pace PlumbingFire Protection607/08/2026
Tri-State DismantlingScaffold407/08/2026
LhotseScaffold403/21/2026
Tom Fitzpatrick ElectricalElectrical403/21/2026
Spring ScaffoldingScaffold303/21/2026
Eagle Scaffolding ServicesScaffold203/21/2026
Balaton ConsultingSign hanger207/08/2026
Nash Electric ServicesElectrical103/21/2026
Nash Electric ServicesElectrical103/22/2026
Bisantz Electric CoElectrical103/21/2026
Tri Borough ScaffoldingScaffold107/08/2026
Millar Elevator IndustriesElectrical103/21/2026
City Electrical Sign ErectorsElectrical103/22/2026
All American ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering49834201/24/2024
Alan D Marcus, PE1761108/28/2020
Becker Engineering633105/20/2020
Building Lifecycle
All (300)Filed (70)Permit Issued (76)Signed Off (16)Violation (60)Inspection (8)Objection (40)Special Inspection (30)
09/15/2026
Permit issued — Construction Fence
M00659884-I1-FN
09/08/2026
Filed — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE SHALL BE INSTALLED ON SIDEWALK/ROADWAY. DOT PERMITS BY OTHERS.
M00659884-P6
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2025
Permit issued — General Construction
M00553790-I1-GC
09/26/2025
Permit issued — Construction Fence
M00659884-I1-FN
09/12/2025
Permit issued — Construction Fence
M00659884-I1-FN
08/27/2025
Filed — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE SHALL BE INSTALLED ON SIDEWALK/ROADWAY. DOT PERMITS BY OTHERS.
M00659884-P5
06/04/2025
Violation issued (HPD, open)
A
04/29/2025
Filed — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE SHALL BE INSTALLED ON SIDEWALK/ROADWAY. DOT PERMITS BY OTHERS.
M00659884-P4
11/22/2024
Violation issued (HPD, open)
I
10/25/2024
Permit issued — General Construction
M00553790-I1-GC
10/04/2024
Signed off — Alteration
USE OF MECHANICAL DEMOLITION EQUIPMENT FOR DISMANTLING OF REMAINING STEEL FRAMING (M00977493-I1) & USE OF MANLIFT FOR WALL REPAIR AT ADJACENT PROPERTY (M00989073-I1).
M00977493-I1
10/03/2024
Signed off — Alteration
USE OF MECHANICAL DEMOLITION EQUIPMENT FOR DISMANTLING OF REMAINING STEEL FRAMING (M00977493-I1) & USE OF MANLIFT FOR WALL REPAIR AT ADJACENT PROPERTY (M00989073-I1).
M00977493-S1
09/26/2024
Permit issued — Construction Fence
M00659884-I1-FN
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2024
Violation issued (ECB, open)
Local Law
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2024
Filed — Alteration
INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE SHALL BE INSTALLED ON SIDEWALK/ROADWAY. DOT PERMITS BY OTHERS.
M00659884-P3
04/01/2024
Violation issued (HPD, open)
A
02/15/2024
Permit issued — Protection and Mechanical Methods
M00977493-S1-PMM
02/12/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00751184-I1
02/08/2024
Objection resolved — Addressed
02/01/2024
Objection raised — Other
01/31/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/24/2024
Filed — Alteration
USE OF MECHANICAL DEMOLITION EQUIPMENT FOR DISMANTLING OF REMAINING STEEL FRAMING (M00977493-I1) & USE OF MANLIFT FOR WALL REPAIR AT ADJACENT PROPERTY (M00989073-I1).
M00977493-S1
01/18/2024
Permit issued — Structural
M00977493-I1-ST
01/04/2024
Filed — Alteration
USE OF MECHANICAL DEMOLITION EQUIPMENT FOR DISMANTLING OF REMAINING STEEL FRAMING (M00977493-I1) & USE OF MANLIFT FOR WALL REPAIR AT ADJACENT PROPERTY (M00989073-I1).
M00977493-I1
12/18/2023
Signed off — Alteration
M00544207-I1
12/14/2023
Special inspection requirement — Demolition
ALEXIS SCHLESSINGERMAN
12/14/2023
Special inspection requirement — Final
James Scheld
12/14/2023
Special inspection requirement — Demolition
ALEXIS SCHLESSINGERMAN
11/30/2023
Permit issued — Construction Fence
M00659884-I1-FN
11/28/2023
Violation issued (ECB, closed)
Construction
11/15/2023
Violation issued (HPD, open)
I
11/06/2023
Signed off — Alteration
MEANS AND METHODS OF DEMOLITION FOR THE PARTIAL DEMOLITION OF THE 25-STORY HOTEL PENNSYLVANIA. GROUND FLOOR AND CELLAR LEVELS TO REMAIN. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE MAJOR ALTERATION M00553790.
M00644926-I1
10/31/2023
Violation issued (ECB, closed)
Construction
10/30/2023
Special inspection requirement — Demolition
ALEXIS SCHLESSINGERMAN
10/30/2023
Special inspection requirement — Structural Steel - High Strength Bolting
ALEXIS SCHLESSINGERMAN
10/30/2023
Special inspection requirement — Structural Steel - Details
ALEXIS SCHLESSINGERMAN
10/30/2023
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
10/30/2023
Special inspection requirement — Final
James Scheld
10/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
10/25/2023
Permit issued — General Construction
M00553790-I1-GC
10/23/2023
Filed — Alteration
MEANS AND METHODS OF DEMOLITION FOR THE PARTIAL DEMOLITION OF THE 25-STORY HOTEL PENNSYLVANIA. GROUND FLOOR AND CELLAR LEVELS TO REMAIN. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE MAJOR ALTERATION M00553790.
M00644926-P8
10/19/2023
Special inspection requirement — Final
James Scheld
10/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
10/19/2023
Special inspection requirement — Structural Steel - High Strength Bolting
ALEXIS SCHLESSINGERMAN
10/19/2023
Special inspection requirement — Structural Steel - Welding
ALEXIS SCHLESSINGERMAN
10/19/2023
Special inspection requirement — Demolition
ALEXIS SCHLESSINGERMAN
10/19/2023
Special inspection requirement — Structural Steel - Details
ALEXIS SCHLESSINGERMAN
10/17/2023
Signed off — Alteration
PARTIAL DEMO OF EXTERIOR WALL AND FLOOR SLAB TO CREATE WALL AND FLOOR OPENINGS NEEDED FOR THE INSTALLATION OF THE CONSTRUCTION HOIST AS PER PLANS FILED HEREWITH.
M00665076-I1
10/17/2023
Signed off — Alteration
Shoring and plating at ground floor (lobby) and shoring at sub-basement 1 (lower level), including sidewalk vaults, to create truck drive-thru at east side of building, as per plans filed herewith.
M00637369-I1
10/17/2023
Signed off — Alteration
MEANS AND METHODS OF DEMOLISHING PORTIONS OF FLOOR SLABS FOR THE INSTALLATION OF METAL DEBRIS CHUTES AT 401 7TH AVENUE FROM THE 19TH FLOOR TO THE LOBBY AS PER PLANS FILED HEREWITH.
M00645899-I1
10/17/2023
Signed off — Alteration
MEANS AND METHODS OF DEMOLITION FOR THE PARTIAL DEMOLITION OF THE 25-STORY HOTEL PENNSYLVANIA. GROUND FLOOR AND CELLAR LEVELS TO REMAIN. THIS APPLICATION IS FILED IN CONJUNCTION WITH THE MAJOR ALTERATION M00553790.
M00644926-S2
10/17/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00616893-I1
10/16/2023
Signed off — Alteration
M00652613-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/15/2026
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company10/20/2025
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/26/2025
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/12/2025
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company10/25/2024
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/26/2024
DOB NOWProtection and Mechanical MethodsSigned-offNorthstar Contracting Group02/15/2024
DOB NOWStructuralSigned-offNorthstar Contracting Group01/18/2024
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold11/30/2023
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company10/25/2023
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company10/13/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/27/2023
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold09/27/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/27/2023
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/27/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold07/19/2023
DOB NOWStructuralSigned-offNorthstar Contracting Group07/14/2023
DOB NOWStructuralSigned-offNorthstar Contracting Group06/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offNorthstar Contracting Group05/09/2023
DOB NOWStructuralSigned-offNorthstar Contracting Group05/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offNorthstar Contracting Group05/09/2023
DOB NOWProtection and Mechanical MethodsSigned-offNorthstar Contracting Group05/09/2023
DOB NOWStructuralSigned-offNorthstar Contracting Group05/09/2023
DOB NOWGeneral ConstructionPermit IssuedNorthstar Contracting Group05/08/2023
DOB NOWSprinklersPermit IssuedManengeering Bureau05/03/2023
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold04/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offTri-State Dismantling02/01/2023
DOB NOWSprinklersPermit IssuedManengeering Bureau01/31/2023
DOB NOWStandpipePermit IssuedManengeering Bureau01/31/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedSafway Atlantic12/20/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold12/08/2022
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold12/08/2022
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold12/08/2022
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company10/19/2022
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/30/2022
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold09/30/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold08/29/2022
DOB NOWStructuralSigned-offNorthstar Contracting Group08/02/2022
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company07/08/2022
DOB NOWSupported ScaffoldSigned-offEagle Scaffolding Services06/07/2022
+ 60 more permits on file
1 project · most recent 08/09/2023
Heating Systems
FiledStatusContractorScope
08/09/2023——Heating Systems
4 projects · most recent 11/23/2021
FiledStatusContractorScope
11/23/2021Permit IssuedManengeering Bureau—
11/23/2021———
08/26/2021Permit IssuedManengeering Bureau334 heads
09/02/2020———
4 projects · most recent 10/13/2023
Water/Sanitary
FiledStatusContractorScope
10/13/2023——Water/Sanitary
11/23/2021——Water/Sanitary
08/26/2021——Water/Sanitary
09/01/2020——Water/Sanitary
13 projects · most recent 12/14/2023
General Wiring
FiledStatusContractorScope
12/14/2023Permit IssuedNash Electric Services—
01/17/2023Permit IssuedRedgrave Electl MaintnceGeneral Wiring
01/16/2023Permit IssuedRedgrave Electl Maintnce—
01/16/2023Permit IssuedRedgrave Electl MaintnceGeneral Wiring
01/13/2023Permit IssuedRedgrave Electl Maintnce—
04/28/2022CompleteNash Electric Services—
04/14/2022CompleteNash Electric Services—
04/08/2022CompleteNash Electric Services—
07/19/2021CompleteTop Shelf Electric—
02/14/2020CompleteCity Electrical Sign Erectors—
02/14/2020CompleteCity Electrical Sign Erectors—
06/12/2019Permit IssuedCity Electrical Sign ErectorsGeneral Wiring
06/06/2019Permit IssuedV. Vass Electric—
3 projects · most recent 08/14/2023
Steel Concrete
FiledStatusContractorScope
08/14/2023——Steel, Concrete
05/28/2021——3 scope_items
05/20/2020——Steel
2 projects · most recent 09/08/2026
Fence Sidewalk Shed
FiledStatusContractorScope
09/08/2026Permit IssuedS&E Bridge & ScaffoldFence
08/17/2023Permit IssuedS&E Bridge & ScaffoldSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/31/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
09/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/11/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
12/14/2023DemolitionALEXIS SCHLESSINGERMANspecial
12/14/2023DemolitionALEXIS SCHLESSINGERMANspecial
12/14/2023FinalJames Scheldprogress
10/30/2023Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
10/30/2023Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
10/30/2023DemolitionALEXIS SCHLESSINGERMANspecial
10/30/2023Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
10/30/2023FinalJames Scheldprogress
10/30/2023Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
10/19/2023Structural Steel - High Strength BoltingALEXIS SCHLESSINGERMANspecial
10/19/2023Structural Steel - WeldingALEXIS SCHLESSINGERMANspecial
10/19/2023DemolitionALEXIS SCHLESSINGERMANspecial
10/19/2023FinalJames Scheldprogress
10/19/2023Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
10/19/2023Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
10/05/2023Air barrier - visual inspectionALEXIS SCHLESSINGERMANenergy_progress
10/05/2023Sprayed fire-resistant materialsALEXIS SCHLESSINGERMANspecial
10/05/2023Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
10/05/2023Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
10/05/2023Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
10/05/2023Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
10/05/2023Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
10/05/2023Wall Panels, Curtain Walls, and VeneersALEXIS SCHLESSINGERMANspecial
09/19/2023DemolitionALEXIS SCHLESSINGERMANspecial
09/19/2023Structural Steel - DetailsALEXIS SCHLESSINGERMANspecial
Latest 25 of 136.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pennsylvania HotelHotel / LodgingSub-cellar, Cellar, Floors 1–25
Project M00644926 Alteration · LOC Issued · 02/24/2022
Project M00305278 Alteration · LOC Issued · 02/11/2020
Hotel PennsylvaniaRetailFloor 1, Mezzanine
Project M00544207 Alteration · LOC Issued · 06/28/2021
CopelandOfficeFloors 2–8, 10–17
Project M00527044 Alteration · Permit Issued · 06/21/2021
Marquis LightingRetailCellar, Floor 1
Project M00331050 Alteration · Approved · 08/28/2020
Hotel Pennsylvania - 401 7th Avenue VornadoHotel / LodgingFloor 16
Project M00001927 Alteration · Permit Entire · 11/14/2017
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,008 on file (BIS + DOB NOW)
▸Plans & Drawings106
▸DOB NOWPlans/Sketch86
09/06/2026M00001927-I1Request digital key ↗
09/03/2026M00527071-I1Request digital key ↗
09/03/2026M00526991-I1Request digital key ↗
Showing 3 of 86 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly8
09/05/2026M00187851-I1Request digital key ↗
09/05/2026M00241833-I1Request digital key ↗
09/05/2026M00260065-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/04/2026M00329657-I1Request digital key ↗
09/04/2026M00340885-I1Request digital key ↗
09/04/2026M00340885-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00331069-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00331050-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00331077-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00305278-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00305278-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00176347-I1Request digital key ↗
▸Applications & Permits316
▸BISPLAN / WORK APPROVAL APPLICATION177
05/31/2022141007997Open ↗
05/26/2022141007997Open ↗
03/24/2022140062697Open ↗
Showing 3 of 177 on file for this type
▸BISWORK PERMIT APPLICATION130
03/01/2022141007997Open ↗
01/26/2022141007283Open ↗
07/21/2021123829385Open ↗
Showing 3 of 130 on file for this type
▸BISPLACE OF ASSEMBLY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications529
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION166
05/15/2020123829385Open ↗
05/15/2020123829385Open ↗
04/17/2020123701100Open ↗
Showing 3 of 166 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature106
09/15/2026M00659884-P6Open ↗
09/06/2026M00001927-I1Open ↗
09/05/2026M00237466-I1Open ↗
Showing 3 of 106 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST73
09/07/2021123829385Open ↗
08/31/2021123829385Open ↗
08/31/2021123829385Open ↗
Showing 3 of 73 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT49
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
03/18/2020123829385Open ↗
Showing 3 of 49 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/30/2026M00553790-P2Open ↗
09/01/2026M00537371-I1Open ↗
09/01/2026M00537371-P1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/30/2026M00553790-P2Open ↗
09/01/2026M00644926-P5Open ↗
09/01/2026M00644926-P2Open ↗
Showing 3 of 31 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION15
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
08/29/2019140866686Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY15
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
08/29/2019140866686Open ↗
Showing 3 of 15 on file for this type
▸Trade Schedules & Equipment91
▸BISSELF-CERT PLUMBING NOTICE28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
01/06/2020123596493Open ↗
12/17/2019123596493Open ↗
Showing 2 of 19 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection172
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist95
09/15/2026M00659884-P6Open ↗
09/06/2026M00001927-I1Open ↗
09/03/2026M00527071-I1Open ↗
Showing 3 of 95 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST59
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
08/31/2021123829385Open ↗
Showing 3 of 59 on file for this type
▸BISANTI-HARASSMENT CHECKLIST4
11/07/2019123740657Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTenant Protection Plan and Notes3
08/06/2020123842020Open ↗
08/05/2019123890110Open ↗
Showing 2 of 3 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT3
10/11/2019123887516Open ↗
Showing 1 of 3 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHPD: CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos130
▸DOB NOWOER: Notice to Proceed40
09/06/2026M00001927-I1Open ↗
09/03/2026M00527071-I1Open ↗
09/03/2026M00527044-I1Open ↗
Showing 3 of 40 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED21
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
05/14/2020123829385Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
09/02/2026M00645899-I1Open ↗
09/02/2026M00637369-I1Open ↗
Showing 2 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/02/2026M00645899-I1Open ↗
09/02/2026M00637369-I1Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance67
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
03/18/2020123842020Open ↗
03/18/2020123829385Open ↗
02/20/2020123842020Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
08/31/2021123829385Open ↗
06/28/2021123829385Open ↗
08/06/2020123842020Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISNYCECC ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY27
01/26/2022141007283Open ↗
08/31/2021123829385Open ↗
06/28/2021123829385Open ↗
Showing 3 of 27 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
03/01/2022141007997Open ↗
01/26/2022141007283Open ↗
▸Approvals, Objections & Sign-offs242
▸DOB NOWTransit Authority Approval71
09/15/2026M00659884-P6Open ↗
09/06/2026M00001927-I1Open ↗
09/02/2026M00645899-I1Open ↗
Showing 3 of 71 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST55
02/19/2021123887516Open ↗
09/01/2020103055140Open ↗
04/17/2020123701100Open ↗
Showing 3 of 55 on file for this type
▸BISADMINISTRATIVE OBJECTIONS36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION31
04/07/2022123829385Open ↗
08/31/2021123829385Open ↗
08/31/2021123829385Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP Variance (V5) letter15
09/04/2026M00340885-I1Open ↗
09/03/2026M00537371-I1Open ↗
09/03/2026M00527015-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL13
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
07/30/2020123855104Open ↗
Showing 3 of 13 on file for this type
▸BISSUPERSEDING LETTER9
12/10/2019123596493Open ↗
09/13/2019123338502Open ↗
Showing 2 of 9 on file for this type
▸BISTRANSIT AUTHORITY APPROVAL5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL3
03/01/2022141007997Open ↗
01/26/2022141007283Open ↗
02/19/2021123887516Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership109
▸BISCOST AFFIDAVIT107
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
08/31/2021123829385Open ↗
Showing 3 of 107 on file for this type
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms187
▸BISADDITIONAL INFORMATION72
05/31/2022141007997Open ↗
06/28/2021123829385Open ↗
07/22/2020123338502Open ↗
Showing 3 of 72 on file for this type
▸BISEFILING COVER SHEET63
03/18/2020123829385Open ↗
02/20/2020123842020Open ↗
02/19/2020123855104Open ↗
Showing 3 of 63 on file for this type
▸BISBOROUGH INTAKE FORM25
07/22/2020123338502Open ↗
05/06/2020123842020Open ↗
05/04/2020123855104Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET21
02/28/2022141007997Open ↗
01/26/2022141007283Open ↗
08/29/2019140866686Open ↗
Showing 3 of 21 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type