Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGazit Horizons, INC.1 filing
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
RoofBridge Towerplace Condominium10p · 3 filings · 20 docs
ArchitectureDMGeneralStructural
Issued Permit Scope
General Construction
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents · 5 drawing sheets
FACADE REPAIRS AND ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 4 drawing sheets
Structural filing associated with tenant fit out.
On file for this project
22 documents · 1 drawing sheet
PenthouseUnit PH1p · 1 filing · 4 docs
Civil
INTERIOR RENOVATION OF PH APARTMENT ON THE 38TH FLOOR. PLUMBING WORK ON (3) BATHROOMS AND KITCHEN. NO CHANGE IN SUE, EGRESS AND/OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 381p · 2 filings · 11 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
INTERIOR RENOVATION OR PH APARTMENT ON THE 38TH FLOOR, INCLUDING MINOR LAYOUT CHANGES. PLUMBING, LIGHTING AND ELECTRICAL WORK. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
INTERIOR RENOVATION OF PH APARTMENT ON THE 38TH FLOOR. PLUMBING WORK ON (3) BATHROOMS AND KITCHEN. NO CHANGE IN SUE, EGRESS AND/OR OCCUPANCY.
On file for this project
4 documents
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Unit 30A2 filings · 6 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
HEREBY FILING FOR THE INTERIOR RENOVATION OF UNIT 30A (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
HEREBY FILING FOR THE INTERIOR RENOVATION OF UNIT 30A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23Unit 23A1 filing · 7 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
PROPOSING TO COMBINE TWO APARTMENTS WITH INTERIOR RENOVATION. REMOVAL AND INSTALLATION OF NON-BEARING INTERIOR PARTITION, CABINETRY, CASEWORK & FINISHING. THE MINOR PLUMBING WORK WILL BE FILED UNDER SEPARATE APPLICATION.
On file for this project
7 documents
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15Unit 16C1 filing · 7 docs
EquipmentFire ProtectionStructural
Issued Permit Scope
Sprinklers · Supported Scaffold
Proposed Sprinkler Work filed in conjunction with ALT 2 Job 140939055
On file for this project
7 documents
Floor 14
Floor 13
Floor 12
Floor 11Gazit Horizons, INC.2p · 1 filing · 8 docs
EquipmentMechanicalStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
REMOVAL AND REPLACEMENT OF COOLING TOWER AND ASSOCIATED EQUIPMENT AT 11TH FLOOR. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
Floor 10
Floor 9
Floor 8
Floor 7Unit 7C1 filing · 6 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
Interior Renovation of Unit 7C as per plans. No Change to Use, Egress or Occupancy.
On file for this project
6 documents
Floor 6
Floor 5Interior renovations and use modification for mercantile occ1 filing · 20 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents
Floor 4Unit 4A, Unit 4B2 filings · 20 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Supported Scaffold
FILED FOR LEGALIZATION OF APTS. 4A &4B AS PER TPPN #3/97 PREVIOUSLY FILED UNDER APPLICATION # 102482528 APPROVED ON 02/23/2001 BUT NEVER PERMITTED, CREATE OPENING BETWEEN APTS. 4A & 4B, INTERIOR PARTITION CHANGES AND FINISHES. PLUMBING FILED UNDER LAA's.
On file for this project
2 documents
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents
Floor 3Allied Partners1p · 2 filings · 20 docs
ArchitectureEquipmentPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
REMOVAL OF 4 EXISTING DRYERS AND ASSOCIATED GAS CONNECTORS AND INSTALLATION OF 7 NEW DRYERS IN THE THRID FLOOR LAUNDRY ROOM WITH ASSOCIATED GAS PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents
Floor 2Gazit Horizons, INC.27p · 4 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents · 25 drawing sheets
REMOVE AND REPLACE IN-KIND PLUMBING FIXTURES AND PIPING OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR AND CELLAR AS PER PLANS FILED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 2 drawing sheets
Structural filing associated with tenant fit out.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Gazit Horizons, INC.24p · 4 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents · 22 drawing sheets
REMOVE AND REPLACE IN-KIND PLUMBING FIXTURES AND PIPING OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR AND CELLAR AS PER PLANS FILED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 2 drawing sheets
Structural filing associated with tenant fit out.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
MezzanineInterior renovations and use modification for mercantile occ1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents
CellarGazit Horizons, INC.40p · 4 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents · 36 drawing sheets
REMOVE AND REPLACE IN-KIND PLUMBING FIXTURES AND PIPING OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR AND CELLAR AS PER PLANS FILED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 5 drawing sheets
Structural filing associated with tenant fit out.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Sub-CellarGazitglobe, Home Depot25p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Support of Excavation
Sprinkler work associated with commercial tenant fit out.
On file for this project
77 documents · 22 drawing sheets
REMOVE AND REPLACE IN-KIND PLUMBING FIXTURES AND PIPING OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR AND CELLAR AS PER PLANS FILED HEREWITH. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 3 drawing sheets
Structural filing associated with tenant fit out.
On file for this project
22 documents
Latest 3 of 5 filings on this floor.
Site & exteriorBridge Towerplace Condominium24 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Sign · Supported Scaffold
FACADE REPAIRS AND ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 12 drawing sheets
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 5 drawing sheets
REFACE THREE NON-ILLUMINATED STOREFRONT ACCESSORY BUSINESS AWNINGS 5,6,7 ON EXISTING AWNING FRAME #102588870, AT E. 61 STREET ELEVATION, NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 24 filings on this floor.
Filed — no permit issuedHome Depot1 filing · 3 docs
ElectricalGeneral
No filed description on record for this project.
On file for this project
3 documents · 4 drawing sheets