← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Bridge Tower Place
401 EAST 60TH STREET · BIN 1045271
💬 Discuss this project
1999Year Built
38Stories
RMBuilding Class
C6-2Zoning
378,474 sfGross Floor Area
271Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Bridge Tower Place Condominium · 40,200 sf lot · 9.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGazit Horizons, INC.1 filing
RoofBridge Towerplace Condominium10p · 3 filings · 20 docs
PenthouseUnit PH1p · 1 filing · 4 docs
Floor 381p · 2 filings · 11 docs
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Unit 30A2 filings · 6 docs
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23Unit 23A1 filing · 7 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15Unit 16C1 filing · 7 docs
Floor 14
Floor 13
Floor 12
Floor 11Gazit Horizons, INC.2p · 1 filing · 8 docs
Floor 10
Floor 9
Floor 8
Floor 7Unit 7C1 filing · 6 docs
Floor 6
Floor 5Interior renovations and use modification for mercantile occ1 filing · 20 docs
Floor 4Unit 4A, Unit 4B2 filings · 20 docs
Floor 3Allied Partners1p · 2 filings · 20 docs
Floor 2Gazit Horizons, INC.27p · 4 filings · 20 docs
Floor 1Gazit Horizons, INC.24p · 4 filings · 20 docs
MezzanineInterior renovations and use modification for mercantile occ1 filing · 20 docs
CellarGazit Horizons, INC.40p · 4 filings · 20 docs
Sub-CellarGazitglobe, Home Depot25p · 5 filings · 20 docs
Site & exteriorBridge Towerplace Condominium24 filings · 20 docs
Filed — no permit issuedHome Depot1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gazit Horizons20607/08/2026
Allied Partners1907/08/2026
Bridge Tower Place Condiminium1503/21/2026
East 60th St Associates1203/21/2026
FAM1103/21/2026
Owner: East 60th St Associates603/21/2026
Milstein Properties503/21/2026
Home Depot USA203/21/2026
Starbucks103/21/2026
East 60 Street Associates103/21/2026
401 East Sixty Holdings103/21/2026
200 West 86th Street103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JP Expedite5003/21/2026
JM Zoning6003/21/2026
Outsource Consultants203/21/2026
DI Dio Architecture403/21/2026
Metropolis Group403/21/2026
MK Associates403/21/2026
Jenny Flores Expediting303/21/2026
Xinos Construction1203/21/2026
AE Design Solution603/21/2026
Scarano Architect403/21/2026
MJ Engineering & Design203/21/2026
Abris Design Studio103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Schimenti Construction CoGeneral Contractor3407/08/2026
Signs CadSign hanger2307/08/2026
Bern ConceptGeneral Contractor807/08/2026
Brener Construction 212General Contractor807/08/2026
Xinos ConstructionScaffold704/09/2026
Nationwide MechanicalPlumbing407/08/2026
Arsenal ScaffoldScaffold307/08/2026
Xinos ConstructionGeneral Contractor207/08/2026
Valley Construction ServicesPlumbing207/08/2026
Signs Cadspecialty_contractor207/08/2026
Sortino JosephElectrical203/21/2026
NYC Fire SprinklerFire Protection207/08/2026
Alba ServicesGeneral Contractor207/08/2026
Pumping Sol Plumbing & Mechanical IPlumbing107/08/2026
PLNGeneral Contractor107/08/2026
Aero ElectricElectrical103/21/2026
Joseph Sgroi & SonsElectrical103/21/2026
Jte Electrical ServicesElectrical103/21/2026
Solas Electrical ContractingElectrical103/22/2026
Star Electrical ContractorsElectrical103/22/2026
Todaro JosephElectrical103/21/2026
LJG ConstructionGeneral Contractor104/09/2026
Orion Construction & PaintingGeneral Contractor107/08/2026
A.C. Morgan ElectricElectrical103/22/2026
Schimenti Construction CoScaffold107/08/2026
Crown PlumbingPlumbing107/08/2026
Phoenix Plumbing & MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DI Dio Architecture9224201/28/2026
Domani Inspection Service8432310/18/2024
Beyond Arch3600210/10/2023
NY Restoration Technology6187207/14/2023
Special Testing & Consulting1688109/16/2022
Integrity Consulting Service666307/12/2022
AR-Tech Engineering6659103/26/2022
Ancora Engineering6818210/22/2021
HRF Services5616107/29/2021
Greenline Developers3447209/14/2020
Building Lifecycle
All (300)Filed (58)Permit Issued (73)Signed Off (47)Facade (FISP) (6)Violation (11)Inspection (18)Objection (57)Special Inspection (30)
08/26/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY PIPE SCAFFOLDING AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, EGRESS OR OCCUPANCY.
M00869985-I1
02/17/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M00504038-I1
02/17/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M00501490-I1
02/09/2026
Signed off — Alteration
M01348744-I1
02/06/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00811459-I1
02/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2026
Permit issued — General Construction
M01348744-I1-GC
01/28/2026
Filed — Alteration
M01348744-I1
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel DiDio
12/02/2025
Filed — Alteration
REMOVAL OF 4 EXISTING DRYERS AND ASSOCIATED GAS CONNECTORS AND INSTALLATION OF 7 NEW DRYERS IN THE THRID FLOOR LAUNDRY ROOM WITH ASSOCIATED GAS PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01098261-P1
09/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2025
Permit issued — Plumbing
M01098261-I1-PL
07/22/2025
Signed off — Alteration CO
Filed to convert portion of sub-cellar from accessory residential parking to accessory commercial storage and to renovate the existing commercial retail spaces at the cellar, first and second floors as per plans filed herewith.
M00508416-S1
06/06/2025
Signed off — Alteration CO
Filed to convert portion of sub-cellar from accessory residential parking to accessory commercial storage and to renovate the existing commercial retail spaces at the cellar, first and second floors as per plans filed herewith.
M00508416-S3
06/04/2025
Signed off — Alteration CO
Filed to convert portion of sub-cellar from accessory residential parking to accessory commercial storage and to renovate the existing commercial retail spaces at the cellar, first and second floors as per plans filed herewith.
M00508416-S2
05/27/2025
Signed off — Alteration
REMOVAL AND REPLACEMENT OF COOLING TOWER AND ASSOCIATED EQUIPMENT AT 11TH FLOOR. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M00493532-I1
05/27/2025
Signed off — Alteration
NON-STRUCTURAL DEMOLITION OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH: REMOVE AND DISPOSE OF NON-STRUCTURAL PARTITIONS, FINISHES AND FIXTURES. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M00455223-S1
05/27/2025
Signed off — Alteration
NON-STRUCTURAL DEMOLITION OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH: REMOVE AND DISPOSE OF NON-STRUCTURAL PARTITIONS, FINISHES AND FIXTURES. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M00455223-I1
05/22/2025
Signed off — Alteration CO
Filed to convert portion of sub-cellar from accessory residential parking to accessory commercial storage and to renovate the existing commercial retail spaces at the cellar, first and second floors as per plans filed herewith.
M00508416-S5
05/12/2025
Cycle 10 facade report signed — SAFE
03/11/2025
Cycle 10 facade report submitted
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2025
Cycle 10 facade inspection completed
12/05/2024
Violation issued (ECB, closed)
Construction
11/06/2024
Objection resolved — Addressed
10/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Vestibules
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Preliminary
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
10/22/2024
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
10/18/2024
Filed — Alteration CO
Filed to convert portion of sub-cellar from accessory residential parking to accessory commercial storage and to renovate the existing commercial retail spaces at the cellar, first and second floors as per plans filed herewith.
M00508416-A1
10/17/2024
Objection raised — Scope
10/17/2024
Special inspection requirement — Preliminary
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Vestibules
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
10/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
10/08/2024
Filed — Alteration
REMOVAL OF 4 EXISTING DRYERS AND ASSOCIATED GAS CONNECTORS AND INSTALLATION OF 7 NEW DRYERS IN THE THRID FLOOR LAUNDRY ROOM WITH ASSOCIATED GAS PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01098261-I1
10/04/2024
Filed — Alteration
NON-STRUCTURAL DEMOLITION OF COMMERCIAL SPACE AT PARTIAL SUB-CELLAR, CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH: REMOVE AND DISPOSE OF NON-STRUCTURAL PARTITIONS, FINISHES AND FIXTURES. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M00455223-P1
08/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/22/2024
Objection resolved — Addressed
08/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLJG Construction02/03/2026
DOB NOWPlumbingSigned-offJag Plumbing & Mechanical08/11/2025
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co06/18/2024
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co06/18/2024
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co06/17/2024
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co06/17/2024
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co06/17/2024
DOB NOWGeneral ConstructionSigned-offXinos Construction05/24/2024
DOB NOWSidewalk ShedSigned-offXinos Construction02/20/2024
DOB NOWPlumbingSigned-offCrown Plumbing11/20/2023
DOB NOWGeneral ConstructionSigned-offPLN11/09/2023
DOB NOWGeneral ConstructionSigned-offSigns Cad10/16/2023
DOB NOWGeneral ConstructionSigned-offSigns Cad10/16/2023
DOB NOWSignSigned-offSigns Cad10/12/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offFrank Zanfardino10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWSignSigned-offSigns Cad10/11/2023
DOB NOWGeneral ConstructionSigned-offSchimenti Construction Co06/22/2023
DOB NOWGeneral ConstructionSigned-offOrion Construction & Pain06/16/2023
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co06/13/2023
DOB NOWGeneral ConstructionSigned-offXinos Construction05/14/2023
+ 60 more permits on file
1 project · most recent 10/18/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/18/2024Signed-offSchimenti Construction CoAir Conditioning Systems, Heating Systems
Cooling
Daikin SWP065HSM 60 tons · Fan Coil Indoor ×6
RXYQ72XATJA 23 tons · Vrf Outdoor ×3
WCCH2096 60 tons · Fan Coil Indoor ×2
Heating
Dunham-Bush SCS3H-50mm TB-AH032-PF 35 kW ×2
SCS3H-50mm TTB-AH012-PF 2 kW ×1
SCS3H-50mm TTB-AH022-PF 18 kW ×1
SCS3H-50mm TTB-AH150-PF 100 kW ×1
1 project · most recent 10/18/2024
Sprinkler System
FiledStatusContractorScope
10/18/2024Signed-offNYC Fire SprinklerSprinkler System
4 projects · most recent 12/02/2025
Water/Sanitary Gas Storm
FiledStatusContractorScope
12/02/2025Signed-offPumping Sol Plumbing & Mechanical IGas
10/18/2024Permit IssuedMCLNY Plumbing & HeatingWater/Sanitary
10/04/2024Permit IssuedMCLNY Plumbing & HeatingStorm, Water/Sanitary
07/12/2022Signed-offValley Construction ServicesGas, Water/Sanitary
23 projects · most recent 07/21/2026
General Wiring
FiledStatusContractorScope
07/21/2026CompleteAkay ElectricGeneral Wiring
11/05/2025CompleteAsko Electric Construction & Maintenance—
12/12/2024CompleteNova ElectricGeneral Wiring
09/12/2024Permit IssuedNGM Electric—
08/01/2024CompleteSigns Cad—
08/01/2024CompleteSigns Cad—
08/01/2024CompleteSigns Cad—
11/13/2023CompleteGlendale Electl ContngGeneral Wiring
09/07/2023CompleteSolas Electrical ContractingGeneral Wiring
10/26/2022Permit IssuedStar Electrical Contractors—
10/26/2022Permit IssuedStar Electrical Contractors—
07/24/2022Permit IssuedRobert Chimenti3 meters, 1 new_meters
02/01/2022Permit IssuedTuxedo Electrical Contracting—
01/05/2022Permit IssuedTuxedo Electrical Contracting—
12/23/2021Permit IssuedTuxedo Electrical ContractingGeneral Wiring
1 project · most recent 12/02/2025
FiledStatusContractorScope
12/02/2025Signed-offPumping Sol Plumbing & Mechanical I1 scope_items
1 project · most recent 07/14/2023
Scaffold
FiledStatusContractorScope
07/14/2023Signed-offXinos ConstructionScaffold
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
02/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/05/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
01/20/2026Fire-Resistant Penetrations and JointsDaniel DiDiospecial
10/22/2024Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
10/22/2024Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/22/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/22/2024PreliminaryJOHN MCMONAGLEprogress
10/22/2024Fenestration air leakageJOHN MCMONAGLEenergy_progress
10/22/2024VestibulesJOHN MCMONAGLEenergy_progress
10/22/2024Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
10/22/2024Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
10/22/2024Fenestration areasJOHN MCMONAGLEenergy_progress
10/22/2024Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
10/22/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
10/22/2024Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/22/2024Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
10/22/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)JOHN MCMONAGLEspecial
10/17/2024Fenestration areasJOHN MCMONAGLEenergy_progress
10/17/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)JOHN MCMONAGLEspecial
10/17/2024Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
10/17/2024Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/17/2024Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
10/17/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/17/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
10/17/2024Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/17/2024PreliminaryJOHN MCMONAGLEprogress
10/17/2024Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Home DepotRetailSub-cellar
Project M00683672 Alteration · Objections · 02/18/2022
Project M00520202 Alteration · LOC Issued · 06/09/2021
GazitglobeRetailSub-cellar
Project M00524379 Alteration · LOC Issued · 06/02/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 579 on file (BIS + DOB NOW)
▸Plans & Drawings70
▸DOB NOWPlans/Sketch67
09/03/2026M00501490-I1Request digital key ↗
09/03/2026M00504038-I1Request digital key ↗
09/03/2026M00504038-P1Request digital key ↗
Showing 3 of 67 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00385218-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00385218-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00455223-I1Request digital key ↗
▸Applications & Permits62
▸BISPLAN / WORK APPROVAL APPLICATION32
09/12/2025104490926Open ↗
09/11/2025104490926Open ↗
08/14/2025104490926Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION30
08/21/2020140939055Open ↗
07/25/2019123777822Open ↗
07/16/2019123777822Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications244
▸DOB NOWDPL-1: Design Professional Seal & Signature71
09/04/2026M00385218-S1Open ↗
09/04/2026M00385218-I1Open ↗
09/03/2026M00501490-I1Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature57
10/03/2026M00521683-P2Open ↗
10/03/2026M00521683-P2Open ↗
10/03/2026M00521683-P2Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWProgress Inspector Seal & Signature54
10/03/2026M00521683-P2Open ↗
09/20/2026M00524379-P2Open ↗
09/20/2026M00524379-P2Open ↗
Showing 3 of 54 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
12/23/2019123777822Open ↗
07/16/2019123777822Open ↗
07/16/2019123777822Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
08/17/2020140939055Open ↗
07/16/2019123777822Open ↗
02/13/2018122736487Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
07/16/2019123777822Open ↗
02/22/2018122736487Open ↗
03/30/2017123052481Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/17/2020140939055Open ↗
07/13/2020140922722Open ↗
05/11/2017140640901Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/17/2020140939055Open ↗
05/11/2017140640901Open ↗
05/10/2017140640484Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/13/2020140922722Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
08/08/2019122736487Open ↗
07/16/2019123777822Open ↗
02/13/2018122736487Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection17
▸BISTENANT PROTECTION PLAN AND NOTES7
08/17/2020140939055Open ↗
07/13/2020140922722Open ↗
05/11/2017140640901Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/16/2019123777822Open ↗
05/11/2015122360916Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
12/23/2019123777822Open ↗
07/16/2019123777822Open ↗
07/16/2019123777822Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.8
09/03/2026M00493532-I1Open ↗
Showing 1 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
03/12/2021121463996Open ↗
12/23/2019123777822Open ↗
05/29/2018123004532Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/22/2021122736487Open ↗
03/12/2021121463996Open ↗
01/13/2021140939055Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/22/2021122736487Open ↗
01/20/2021140939055Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/17/2020140939055Open ↗
07/13/2020140922722Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/21/2020140939055Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/21/2020140939055Open ↗
▸BISLIGHTING CONTROLS1
08/21/2020140939055Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/13/2020140922722Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/04/2014121059852Open ↗
▸BISINTERIOR LIGHTING POWER1
08/21/2020140939055Open ↗
▸BISNYCECC ANALYSIS1
08/17/2020140939055Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY13
11/26/2025104490926Open ↗
11/13/2025104490926Open ↗
04/22/2021122736487Open ↗
Showing 3 of 13 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
08/21/2020140939055Open ↗
07/13/2020140922722Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
06/27/2018123052481Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
10/30/2025104490926Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/12/2017121846583Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/21/2020140939055Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/21/2020140939055Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
11/28/2025104490926Open ↗
04/22/2021122736487Open ↗
03/12/2021121463996Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/22/2021122736487Open ↗
03/07/2018123052481Open ↗
Showing 2 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
09/03/2026M00501490-I1Open ↗
09/03/2026M00504038-I1Open ↗
09/03/2026M00504038-P1Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
08/21/2020140939055Open ↗
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT23
11/26/2025104490926Open ↗
03/12/2021121463996Open ↗
08/17/2020140939055Open ↗
Showing 3 of 23 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
03/09/2016122643498Open ↗
▸BISINSURANCE: DISABILITY1
08/21/2020140939055Open ↗
▸BISINSURANCE: WORKERS' COMPENSATION1
08/21/2020140939055Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/22/2021122736487Open ↗
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET15
07/16/2019123777822Open ↗
02/13/2018122736487Open ↗
03/30/2017123052481Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION15
10/27/2025104490926Open ↗
10/27/2025104490926Open ↗
02/06/2021140939055Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM6
12/23/2019123777822Open ↗
08/08/2019122736487Open ↗
06/27/2018123052481Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
08/17/2020140939055Open ↗
07/13/2020140922722Open ↗
05/11/2017140640901Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸BIS* FIRE STOPS 27-3451
10/30/2025104490926Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type