401 SOUTH END AVENUE
MANHATTAN · Financial District-Battery Park City · BIN 1089805
💬 Discuss this project
2024Year Built
3Stories
Z9Building Class
BPCZoning
21,854 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Other miscellaneous · Owner of record: NYC DEPARTMENT OF TRANSPORTATION · 2,499,209 sf lot · 0.01 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Site & exteriorUnder Construction236p · 8 filings · 20 docs
Filed — no permit issued237p · 4 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arcadis2407/13/2026
Arcadis of New York, Inc.1307/02/2026
HIRANI ENGINEERING AND LAND SURVEYI906/04/2026
HC PEC103/17/2026
HAYDUK ENGINEERING, LLC201/16/2026
ARCADIS OF NY, INC.207/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING7803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURNER EE CRUZ A JOINTGeneral Contractor1507/16/2026
FERREIRA CONSTRUCTION COGeneral Contractor604/09/2026
MPC PLUMBING & HEATING INCPlumbing507/08/2026
KRISTINE DENAPOLIElectrical203/21/2026
PJP INSTALLERS INCGeneral Contractor107/08/2026
STARR INDUSTRIES LLCGeneral Contractor109/24/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1062707/13/2026
MJE CONSULTING ENGINEERIN8522705/21/2026
HUDSON PEAKS CONSULTING L83811601/16/2026
Building Lifecycle
All (203)Filed (51)Permit Issued (28)Inspection (15)Objection (79)Special Inspection (30)
09/23/2026
Permit issued — Construction Fence
M01463491-I1-FN
08/25/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/10/2026
Objection resolved — Resolved
08/07/2026
Objection raised — Scope
08/05/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
08/05/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
08/05/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
08/05/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
08/05/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
07/28/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
07/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/15/2026
Permit issued — Foundation
M01238849-S1-GC-CX
07/13/2026
Filed — Alteration
REACH 6 - TEMPORARY RELOCATION OF HVAC UNIT TO COMPLETE CONSTRUCTION OF FLOOD BARRIER SYSTEM FOR THE BPCA NORTH/WEST BATTERY PARK CITY RESILIENCY PROJECT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01238963-P1
07/13/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/08/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/06/2026
Permit issued — Support of Excavation
M01238849-S2-SE
07/02/2026
Filed — Alteration
3 temp. 6" watermain relocations, mount insulated HDPE watermains on existing facades and connect to existing bldg. at the facade. Install 12" private drain from pumphouse park, trench drain on Liberty St, and 12" drain to outfall to existing watercourse.
M01271983-P2
07/02/2026
Permit issued — Mechanical Systems
M01238963-S4-MS
07/02/2026
Permit issued — Structural
M01238963-S1-GC-CX
07/02/2026
Permit issued — Earth Work
M01238963-I1-GC-CX
07/02/2026
Permit issued — Earth Work
M01238849-I1-GC-CX
07/02/2026
Permit issued — Support of Excavation
M01238963-S2-SE
07/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2026
Permit issued — Plumbing
M01236760-S1-PL
06/23/2026
Filed — Alteration
Filing Plumbing work for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
M01271995-P4
06/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/22/2026
Filed — Alteration
Reach 3 Support of excavation Construction of flood barrier system for the BPCA North/West Battery Park City Resiliency Project. No change to use, egress, or occupancy.
M01252535-P1
06/22/2026
Filed — Alteration
Filing Plumbing work for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
M01271995-P2
06/22/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GHEBRYAL
06/22/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
06/22/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
06/22/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/22/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
06/15/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
06/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2026
Filed — Alteration
Filing Plumbing work for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use egress or occupancy.
M01271995-P3
06/03/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
06/03/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
GEORGE GHEBRYAL
06/03/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
06/03/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
06/03/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
06/03/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
06/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/01/2026
Permit issued — General Construction
M01236760-S3-GC-CX
05/21/2026
Filed — Alteration
Stormwater upgrades incl. removal/abandonment of existing systems, new rain gardens, drains, permeable paving, underdrains, and new outfall connection. Includes earthwork, grading, and impacts to adjacent properties; complies with NYC DOB code.
M01242515-P6
05/20/2026
Permit issued — Plumbing
M01238963-S3-PL
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSTARR INDUSTRIES LLC09/23/2026
DOB NOWFoundationPermit IssuedTURNER EE CRUZ A JOINT07/15/2026
DOB NOWSupport of ExcavationPermit IssuedTURNER EE CRUZ A JOINT07/06/2026
DOB NOWMechanical SystemsPermit IssuedTURNER EE CRUZ A JOINT07/02/2026
DOB NOWStructuralPermit IssuedTURNER EE CRUZ A JOINT07/02/2026
DOB NOWEarth WorkPermit IssuedTURNER EE CRUZ A JOINT07/02/2026
DOB NOWEarth WorkPermit IssuedTURNER EE CRUZ A JOINT07/02/2026
DOB NOWSupport of ExcavationPermit IssuedTURNER EE CRUZ A JOINT07/02/2026
DOB NOWPlumbingPermit IssuedMPC PLUMBING & HEATING INC06/25/2026
DOB NOWGeneral ConstructionPermit IssuedTURNER EE CRUZ A JOINT06/01/2026
DOB NOWPlumbingPermit IssuedMPC PLUMBING & HEATING INC05/20/2026
DOB NOWMechanical SystemsPermit IssuedTURNER EE CRUZ A JOINT05/12/2026
DOB NOWEarth WorkPermit IssuedTURNER EE CRUZ A JOINT05/12/2026
DOB NOWSupport of ExcavationPermit IssuedTURNER EE CRUZ A JOINT05/12/2026
DOB NOWStructuralPermit IssuedTURNER EE CRUZ A JOINT04/13/2026
DOB NOWSupport of ExcavationPermit IssuedTURNER EE CRUZ A JOINT04/13/2026
DOB NOWMechanical SystemsPermit IssuedTURNER EE CRUZ A JOINT04/13/2026
DOB NOWGeneral ConstructionPermit IssuedTURNER EE CRUZ A JOINT04/13/2026
DOB NOWConstruction FencePermit IssuedPJP INSTALLERS INC03/20/2026
DOB NOWPlumbingPermit IssuedMPC PLUMBING & HEATING IN02/27/2026
DOB NOWPlumbingPermit IssuedMPC PLUMBING & HEATING IN01/22/2026
DOB NOWPlumbingPermit IssuedMPC PLUMBING & HEATING IN01/14/2026
DOB NOWStructuralPermit IssuedFERREIRA CONSTRUCTION CO01/09/2026
DOB NOWFoundationPermit IssuedFERREIRA CONSTRUCTION CO01/09/2026
DOB NOWGeneral ConstructionPermit IssuedFERREIRA CONSTRUCTION CO01/09/2026
DOB NOWGeneral ConstructionPermit IssuedFERREIRA CONSTRUCTION CO12/16/2025
DOB NOWSupport of ExcavationPermit IssuedFERREIRA CONSTRUCTION CO12/16/2025
DOB NOWStructuralPermit IssuedFERREIRA CONSTRUCTION CO12/16/2025
BISPLISSUEDRICHARDS P AND H CO., INC06/20/2018
BISEQISSUEDPAUL J. SCARIANO INC08/03/2017
BISOTISSUEDPAUL J. SCARIANO INC05/09/2017
BISOTISSUEDPAUL J. SCARIANO INC05/09/2017
BIS—ISSUEDPAUL J. SCARIANO INC05/08/2017
BIS—ISSUEDPAUL J. SCARIANO INC05/08/2017
BIS—ISSUEDPAUL J. SCARIANO INC11/15/2016
BIS—ISSUEDPAUL J. SCARIANO INC11/15/2016
BISPLISSUEDRICHARDS P AND H CO., INC11/02/2016
BISOTISSUEDPAUL J. SCARIANO INC10/03/2016
BISOTISSUEDPAUL J. SCARIANO INC09/30/2016
BISOTISSUEDPAUL J. SCARIANO INC09/29/2016
+ 3 more permits on file
4 projects · most recent 07/13/2026
Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2026Permit IssuedTURNER EE CRUZ A JOINTAir Conditioning Systems
Cooling
Coleman TCHD60S44S3A 5 tons · Condensing Unit ×16
TCHD36S44S3A 3 tons · Condensing Unit ×4
Thermal Zone TZAA-360-DC757 5 tons · Condensing Unit ×4
TZAL-360-DC 5 tons · Condensing Unit ×4
TZPLS1460DAA 5 tons · Condensing Unit ×4
Carrier 38AUZA08A0A5A0A0A0 8 tons · Condensing Unit ×4
Daikin RXS24DVJU 2 tons · Condensing Unit ×4
Guardian GCGD60S21S2XEB 5 tons · Condensing Unit ×4
York YCD60B22SA 5 tons · Condensing Unit ×4
06/22/2026——Others
Other
Jandy Model No. JCP05-3AT-S 4 kW ×1
Stealth Model No. SHPF3.0-3PH 3 kW ×1
05/21/2026Permit IssuedTURNER EE CRUZ A JOINTAir Conditioning Systems
Cooling
Lg ARUM121BTES 10 tons · Vrf Outdoor ×4
04/27/2026Permit IssuedTURNER EE CRUZ A JOINTVentilation Systems
Ventilation
Plastec P20556P025 450 CFM · Exhaust Fan ×2
10 projects · most recent 07/13/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/13/2026Permit IssuedMADISON PIPE CONSULT INCStorm, Water/Sanitary
07/02/2026Permit IssuedMADISON PIPE CONSULT INCStorm, Water/Sanitary
06/23/2026Permit IssuedMADISON PIPE CONSULT INCStorm, Water/Sanitary
06/22/2026——Storm, Water/Sanitary
05/21/2026Permit IssuedMADISON PIPE CONSULT INCStorm
04/27/2026Permit IssuedMADISON PIPE CONSULT INCStorm
12/08/2025——Storm, Water/Sanitary
06/24/2025——Storm, Water/Sanitary
06/06/2025——Storm, Water/Sanitary
06/04/2025——Storm, Water/Sanitary
1 project · most recent 06/09/2021
General Wiring
FiledStatusContractorScope
06/09/2021CompleteINTERPHASE ELECTRIC CORP.General Wiring
10 projects · most recent 07/13/2026
Concrete Steel Masonry
FiledStatusContractorScope
07/13/2026Permit IssuedTURNER EE CRUZ A JOINTSteel, Concrete
07/02/2026Permit IssuedMADISON PIPE CONSULT INCMasonry
06/23/2026Permit IssuedMADISON PIPE CONSULT INCConcrete
06/22/2026——Steel, Concrete
05/21/2026Permit IssuedTURNER EE CRUZ A JOINTSteel, Concrete
04/27/2026Permit IssuedMADISON PIPE CONSULT INCSteel, Concrete
12/08/2025——Steel, Concrete
06/24/2025Permit IssuedTURNER EE CRUZ A JOINTSteel, Concrete
06/06/2025——Concrete
06/04/2025——1 scope_items
1 project · most recent 03/17/2026
Fence
FiledStatusContractorScope
03/17/2026Permit IssuedPJP INSTALLERS INCFence
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/08/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/25/2026Post-installed AnchorsGEORGE GHEBRYALspecial
08/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/05/2026FinalGEORGE GHEBRYALprogress
08/05/2026Post-installed AnchorsGEORGE GHEBRYALspecial
08/05/2026MasonryGEORGE GHEBRYALspecial
08/05/2026Lowest Floor ElevationGEORGE GHEBRYALprogress
08/05/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
07/28/2026Footing and FoundationGEORGE GHEBRYALprogress
07/28/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
07/28/2026Construction Operations Influencing Adjacent StructuresGEORGE GHEBRYALspecial
07/28/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
07/28/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
07/28/2026Lowest Floor ElevationGEORGE GHEBRYALprogress
07/28/2026FinalGEORGE GHEBRYALprogress
07/28/2026Deep Foundation ElementsGEORGE GHEBRYALspecial
07/28/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
07/28/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/13/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/22/2026Lowest Floor ElevationGEORGE GHEBRYALprogress
06/22/2026FinalGEORGE GHEBRYALprogress
06/22/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/22/2026MasonryGEORGE GHEBRYALspecial
06/22/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
06/15/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/03/2026Footing and FoundationGEORGE GHEBRYALprogress
Latest 25 of 150.
▾Documents — 507 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch53
09/06/2026M01370412-I1Request digital key ↗
08/23/2026M01234180-I1Request digital key ↗
08/23/2026M01234180-S1Request digital key ↗
Showing 3 of 53 on file for this type
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION18
05/27/2021123570563Open ↗
05/27/2021123570563Open ↗
07/26/2019122538405Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
03/23/2020123570563Open ↗
03/06/2020123570563Open ↗
03/06/2020123570563Open ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/14/2016122663714Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/14/2016122663714Open ↗
▸BISZONING DIAGRAM1
09/14/2016122663714Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/14/2016122663714Open ↗
▸Seals & Professional Certifications175
▸DOB NOWSpecial Inspector Seal & Signature72
09/28/2026M01238849-I1Open ↗
09/28/2026M01238849-I1Open ↗
09/28/2026M01238849-I1Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/06/2026M01370412-I1Open ↗
08/23/2026M01234180-S1Open ↗
08/23/2026M01234180-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/28/2026M01238849-I1Open ↗
09/28/2026M01238849-I1Open ↗
09/01/2026M01238849-S1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
03/06/2020123570563Open ↗
03/06/2020123570563Open ↗
11/18/2016122663714Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/06/2020123570563Open ↗
03/06/2020123570563Open ↗
08/04/2016122730964Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/06/2020123570563Open ↗
08/04/2016122730964Open ↗
01/12/2016122538405Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/12/2016122538405Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/07/2016122663714Open ↗
04/06/2016122663714Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/12/2016122538405Open ↗
▸Environmental & Asbestos46
▸DOB NOWDEP ACP-5: Asbestos Assessment Report46
08/23/2026M01238849-P2Open ↗
08/23/2026M01238849-P1Open ↗
08/23/2026M01238963-S3Open ↗
Showing 3 of 46 on file for this type
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/06/2020123570563Open ↗
11/18/2016122663714Open ↗
11/18/2016122663714Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/07/2025122538405Open ↗
09/14/2016122663714Open ↗
▸Inspections & Test Reports26
▸DOB NOWSOIL REPORT8
08/23/2026M01238849-P2Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram6
08/23/2026M01238849-S1Open ↗
08/20/2026M01249540-S1Open ↗
08/19/2026M01252535-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/07/2025122663714Open ↗
04/07/2025122538405Open ↗
04/06/2016122663714Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/18/2016122663714Open ↗
09/26/2016122538405Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/18/2016122663714Open ↗
09/26/2016122538405Open ↗
▸BISPOST-INSTALLED ANCHORS1
05/26/2021123570563Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/29/2021123570563Open ↗
▸BISSOIL REPORT1
09/14/2016122663714Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
04/29/2021123570563Open ↗
▸Approvals, Objections & Sign-offs120
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter49
08/23/2026M01234180-S1Open ↗
08/23/2026M01234180-I1Open ↗
08/23/2026M01238849-P2Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)37
08/23/2026M01238849-P1Open ↗
08/23/2026M01238849-P2Open ↗
08/21/2026M01236760-P2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
07/26/2019122538405Open ↗
11/18/2016122663714Open ↗
11/18/2016122663714Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
09/14/2016122663714Open ↗
▸BISFINAL1
05/26/2021123570563Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
09/14/2016122663714Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
03/06/2020123570563Open ↗
03/06/2020123570563Open ↗
01/12/2016122538405Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/23/2017122663714Open ↗
11/18/2016122663714Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
03/05/2020123570563Open ↗
▸Filing & Intake Forms20
▸BISADDITIONAL INFORMATION11
03/25/2020123570563Open ↗
03/25/2020123570563Open ↗
03/25/2020123570563Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET9
03/06/2020123570563Open ↗
03/06/2020123570563Open ↗
08/04/2016122730964Open ↗
Showing 3 of 9 on file for this type
▸Other Documents17
▸DOB NOWAdjoining Owners Notification9
08/23/2026M01238849-S2Open ↗
08/23/2026M01238849-I1Open ↗
Showing 2 of 9 on file for this type
▸BISSupporting Document: Fee Deferment4
11/18/2016122663714Open ↗
11/18/2016122663714Open ↗
11/18/2016122663714Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/23/2017122663714Open ↗
02/05/2016122663714Open ↗
▸BISSupporting Document: Fee Exempt1
09/14/2016122663714Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type