← Back
BuildNYC
Other miscellaneous
401 SOUTH END AVENUE
MANHATTAN · BIN 1089805
💬 Discuss this project
2024Year Built
3Stories
Z9Building Class
BPCZoning
21,854 sfGross Floor Area
3Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Other miscellaneous · Owner of record: NYC Department of Transportation · 2,499,209 sf lot · 0.01 FAR built · Flood zone X500
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Site & exterior9 filings
Filed — no permit issued3 filings
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arcadis2511/06/2026
Arcadis of New York1511/06/2026
Skyline Rigging109/23/2026
Hirani Engineering and Land Surveyi906/04/2026
HC Pec103/17/2026
Hayduk Engineering201/16/2026
Arcadis of NY207/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boyd Consulting7803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Turner EE Cruz A JointGeneral Contractor1610/26/2026
Ferreira Construction CoGeneral Contractor604/09/2026
MPC Plumbing & HeatingPlumbing507/08/2026
KND Licensed Electrical Cont'Electrical203/21/2026
PJP InstallersScaffold107/08/2026
Starr IndustriesScaffold109/24/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1063011/06/2026
Skyline Rigging7880109/23/2026
Hudson Peaks Consulting83811709/18/2026
Mje Consulting Engineering8522705/21/2026
Building Lifecycle
11/06/2026
Filed — Alteration
FILING FOR ST/FO WORK FOR REACH 2 - CONSTRUCTION OF A PLATFORM CONSISTING OF PRECAST/PRESTRESSED VOIDED DECKS WITH A TOPPING SLAB SPANNING 42-FT ON AVERAGE ON DRILLED SHAFT SUPPORTED BENTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. SEE COMMENTS BELOW.
M01238849-P3
11/06/2026
Filed — Alteration
3 temp. 6" watermain relocations, mount insulated HDPE watermains on existing facades and connect to existing bldg. at the facade. Install 12" private drain from pumphouse park, trench drain on Liberty St, and 12" drain to outfall to existing watercourse.
M01271983-P3
11/04/2026
Special inspection requirement — Lowest Floor Elevation
GEORGE GHEBRYAL
11/04/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
11/04/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
157 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Starr Industries—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—MPC Plumbing & Heating—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—MPC Plumbing & Heating—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—Turner EE Cruz A Joint—
DOB NOW—PJP Installers—
DOB NOW—MPC Plumbing & Heating—
DOB NOW—MPC Plumbing & Heating—
DOB NOW—MPC Plumbing & Heating—
DOB NOW—Ferreira Construction Co—
DOB NOW—Ferreira Construction Co—
DOB NOW—Ferreira Construction Co—
DOB NOW—Ferreira Construction Co—
DOB NOW—Ferreira Construction Co—
DOB NOW—Ferreira Construction Co—
BIS—Richards P and H Co—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
BIS—Richards P and H Co—
BIS—Paul J. Scariano—
BIS—Paul J. Scariano—
+ 4 more permits on file
Nothing on file for this building.
Nothing on file for this building.
531 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account