The Mott Hall School
401 WEST 164TH STREET · BIN 1062636
💬 Discuss this project
1930Year Built
4Stories
W1Building Class
R7-2Zoning
97,194 sfGross Floor Area
3Units
LL97 Covered3 Active Violations 0 unresolved · 3 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 36,673 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofI.S. 328M, I.S. 164 - ManhattanUnder Construction27p · 2 filings · 18 docs
Floor 4I.S. 164 - ManhattanUnder Construction41p · 2 filings · 16 docs
Floor 3I.S. 164 - ManhattanUnder Construction37p · 2 filings · 16 docs
Floor 2I.S. 164 - ManhattanUnder Construction40p · 2 filings · 16 docs
Floor 1I.S. 164 - Manhattan, I.S. 16Under Construction64p · 3 filings · 16 docs
BasementI.S. 164 - ManhattanUnder Construction1p · 1 filing · 20 docs
Sub-BasementI.S. 164 - Manhattan, I.S. 16Under Construction4p · 2 filings · 20 docs
Site & exteriorI.S. 328M, P.S. 164MUnder Construction22p · 5 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9708/26/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Precision 3Sixty NYC2603/21/2026
WSP403/21/2026
AK Consulting Services1603/21/2026
Superstructures Engineering + Architects503/21/2026
Dseny Engineering Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Litehouse BuildersGeneral Contractor1007/08/2026
Fidelis ContractingScaffold1008/26/2026
Fidelis ContractingGeneral Contractor607/08/2026
Whitestone ConstructionScaffold507/08/2026
Varsity Plumbing and HeatingPlumbing206/28/2026
Kelleher ElectriciansElectrical203/21/2026
ACS System AssociatesGeneral Contractor207/08/2026
MDS Construction ManagementGeneral Contractor208/18/2026
RNH Electric CompanyElectrical203/21/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Lit Mode Electrical ContgElectrical103/21/2026
Prince ElectricElectrical103/21/2026
A&H Express Plumbing & HeatingPlumbing106/28/2026
Stanco System Electrical ContElectrical103/22/2026
Laser Electrical Constr'gElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections14711509/29/2025
Building Lifecycle
All (184)Filed (31)Permit Issued (31)Signed Off (5)Violation (60)Inspection (2)Objection (25)Special Inspection (30)
08/17/2026
Permit issued — General Construction
M00934222-I1-GC
08/03/2026
Permit issued — Sidewalk Shed
M01109435-I1-SH
06/26/2026
Permit issued — Plumbing
M00921904-S3-PL
05/19/2026
Permit issued — Structural
M00921904-S1-ST
05/11/2026
Permit issued — Sidewalk Shed
M01109435-I1-SH
05/01/2026
Permit issued — General Construction
M00921904-I1-GC
04/22/2026
Permit issued — Supported Scaffold
M01109664-I1-SF
04/22/2026
Permit issued — Construction Fence
M01109427-I1-FN
04/22/2026
Permit issued — Mechanical Systems
M00921904-S2-MS
04/22/2026
Permit issued — Protection and Mechanical Methods
M01154621-I1-PMM
02/19/2026
Permit issued — Sidewalk Shed
M01109435-I1-SH
02/10/2026
Violation issued (ECB, open)
Construction
02/10/2026
Violation issued (ECB, closed)
Construction
01/29/2026
Permit issued — Plumbing
M00934222-S1-PL
01/28/2026
Permit issued — General Construction
M00934222-I1-GC
10/28/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01154621-P1
10/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01109427-P1
10/27/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
10/20/2025
Objection resolved — Addressed
10/02/2025
Objection raised — Other
09/29/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01109664-P1
09/29/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01109435-P1
09/29/2025
Objection raised — Other
08/20/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
06/25/2025
Permit issued — Plumbing
M00921904-S3-PL
06/13/2025
Signed off — Alteration
SH/PS164M - FOR TEMPORARY CONSTRUCTION EQUIPMENT(EMERGENCY SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH LLW# NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00752029-I1
05/27/2025
Permit issued — Structural
M00921904-S1-ST
05/22/2025
Permit issued — Mechanical Systems
M00921904-S2-MS
05/06/2025
Permit issued — General Construction
M00921904-I1-GC
04/30/2025
Permit issued — Sidewalk Shed
M01109435-I1-SH
04/30/2025
Permit issued — Supported Scaffold
M01109664-I1-SF
04/30/2025
Violation issued (ECB, open)
Construction
04/29/2025
Permit issued — Construction Fence
M01109427-I1-FN
04/29/2025
Permit issued — Protection and Mechanical Methods
M01154621-I1-PMM
04/14/2025
Filed — Alteration
INSTALLATION OF DEBRIS CHUTE FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS PER INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01154621-I1
02/18/2025
Violation issued (ECB, closed)
Construction
01/27/2025
Special inspection requirement — Post-installed Anchors
JACOB HAAS
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
01/24/2025
Permit issued — Sidewalk Shed
M00752029-I1-SH
01/23/2025
Objection resolved — Addressed
11/08/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01109427-I1
11/08/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01109664-I1
11/08/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR IS 328M AT 401 WEST 164 STREET, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01109435-I1
08/23/2024
Objection resolved — Addressed
07/23/2024
Signed off — Alteration
EXISTING MOP SINK TO BE REMOVED. REPLACED WITH ONE (1) CLASSROOM SINK WITH BUBBLER.
M00802429-S1
07/23/2024
Signed off — Alteration
EXISTING MOP SINK TO BE REMOVED. REPLACED WITH ONE (1) CLASSROOM SINK WITH BUBBLER.
M00802429-S2
07/23/2024
Signed off — Alteration
EXISTING MOP SINK TO BE REMOVED. REPLACED WITH ONE (1) CLASSROOM SINK WITH BUBBLER.
M00802429-S3
07/23/2024
Signed off — Alteration
EXISTING MOP SINK TO BE REMOVED. REPLACED WITH ONE (1) CLASSROOM SINK WITH BUBBLER.
M00802429-I1
06/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/28/2024
Objection raised — Other
05/28/2024
Objection raised — Other
05/23/2024
Filed — Alteration
Interior alteration of existing student toilet rooms into ADA accessible toilet rooms. Scope of work include installing new ADA compliant plumbing fixtures and accessories, new door and hardware, and ADA compliant drinking fountains in corridors.
M00934222-P2
05/22/2024
Filed — Alteration
Interior alteration of existing student toilet rooms into ADA accessible toilet rooms. Scope of work include installing new ADA compliant plumbing fixtures and accessories, new door and hardware, and ADA compliant drinking fountains in corridors.
M00934222-P1
05/22/2024
Special inspection requirement — Post-installed Anchors
05/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sandy Bishay
05/21/2024
Special inspection requirement — Lighting controls
Sandy Bishay
05/21/2024
Special inspection requirement — Interior lighting power
Sandy Bishay
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Sandy Bishay
01/29/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMDS Construction Management08/17/2026
DOB NOWSidewalk ShedPermit IssuedFidelis Contracting08/03/2026
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating06/26/2026
DOB NOWStructuralPermit IssuedFidelis Contracting05/19/2026
DOB NOWSidewalk ShedPermit IssuedFidelis Contracting05/11/2026
DOB NOWGeneral ConstructionPermit IssuedFidelis Contracting05/01/2026
DOB NOWSupported ScaffoldPermit IssuedFidelis Contracting04/22/2026
DOB NOWConstruction FencePermit IssuedFidelis Contracting04/22/2026
DOB NOWMechanical SystemsPermit IssuedACS System Associates04/22/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedFidelis Contracting04/22/2026
DOB NOWSidewalk ShedPermit IssuedFidelis Contracting02/19/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating01/29/2026
DOB NOWGeneral ConstructionPermit IssuedMDS Construction Management01/28/2026
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating06/25/2025
DOB NOWStructuralPermit IssuedFidelis Contracting05/27/2025
DOB NOWMechanical SystemsPermit IssuedACS System Associates05/22/2025
DOB NOWGeneral ConstructionPermit IssuedFidelis Contracting05/06/2025
DOB NOWSidewalk ShedPermit IssuedFidelis Contracting04/30/2025
DOB NOWSupported ScaffoldPermit IssuedFidelis Contracting04/30/2025
DOB NOWConstruction FencePermit IssuedFidelis Contracting04/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedFidelis Contracting04/29/2025
DOB NOWSidewalk ShedSigned-offWhitestone Construction01/24/2025
DOB NOWSidewalk ShedSigned-offWhitestone Construction01/23/2024
DOB NOWGeneral ConstructionSigned-offLitehouse Builders09/20/2023
DOB NOWGeneral ConstructionSigned-offLitehouse Builders09/20/2023
DOB NOWMechanical SystemsSigned-offLitehouse Builders09/19/2023
DOB NOWMechanical SystemsSigned-offLitehouse Builders05/08/2023
DOB NOWGeneral ConstructionSigned-offLitehouse Builders05/02/2023
DOB NOWPlumbingSigned-offOlympic Plumbing & Heating Service04/13/2023
DOB NOWGeneral ConstructionSigned-offLitehouse Builders04/12/2023
DOB NOWSidewalk ShedSigned-offWhitestone Construction01/17/2023
BISOTISSUEDNew Phase Electrical Cont01/28/2016
BISSPISSUEDAshlar Mechanical01/15/2009
BISPLISSUEDCardoza Plumbing09/12/2008
BISMHISSUEDHellman Construction Co09/05/2008
BISEQISSUEDAdam's European Contracting12/24/2007
BISEQISSUEDAdams European Contracting12/24/2007
BISOTISSUEDAdam's European Contracting08/15/2007
BISOTISSUEDAdam's European Contracting08/15/2007
BISEQISSUEDAdam's European Contracting08/07/2007
+ 33 more permits on file
1 project · most recent 11/03/2023
Ventilation Systems
FiledStatusContractorScope
11/03/2023Permit IssuedFidelis ContractingVentilation Systems
2 projects · most recent 05/23/2024
Water/Sanitary Storm
FiledStatusContractorScope
05/23/2024Permit IssuedA&H Express Plumbing & HeatingWater/Sanitary
11/03/2023Permit IssuedVarsity Plumbing and HeatingStorm
18 projects · most recent 05/11/2026
General Wiring Lighting
FiledStatusContractorScope
05/11/2026CompleteGemini Electric Co—
09/17/2025CompleteGemini Electric Co—
06/25/2025Permit IssuedLit Mode Electrical Contg—
05/19/2025Permit IssuedAujla ElectricGeneral Wiring
04/28/2025CompleteGemini Electric Co—
02/02/2025CompleteDNR ElectricGeneral Wiring
01/13/2025Permit IssuedAujla Electric—
11/27/2024Permit IssuedStanco System Electrical Cont—
11/17/2023CompleteTower ElectricGeneral Wiring
09/11/2023CompletePowerone Elect'l ContractingLighting
07/14/2022Permit IssuedGemini Electric CoGeneral Wiring
05/12/2022CompleteHexagon Construction & Electrical Group—
03/22/2022CompleteCharan Electrical Enterp's—
10/22/2021CompleteAbm Electric—
04/02/2019CompleteHexagon Construction & Electrical GroupGeneral Wiring
1 project · most recent 11/03/2023
Masonry
FiledStatusContractorScope
11/03/2023Permit IssuedVarsity Plumbing and HeatingMasonry
3 projects · most recent 10/28/2025
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
10/28/2025Permit IssuedFidelis ContractingFence
09/29/2025Permit IssuedFidelis ContractingSidewalk Shed
09/29/2025Permit IssuedFidelis ContractingScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
10/27/2025Post-installed AnchorsJACOB HAASspecial
08/20/2025Post-installed AnchorsJACOB HAASspecial
01/27/2025Post-installed AnchorsJACOB HAASspecial
01/27/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
05/22/2024Post-installed Anchors—special
05/22/2024Fire-Resistant Penetrations and Joints—special
05/21/2024Fire-Resistant Penetrations and JointsSandy Bishayspecial
05/21/2024Lighting controlsSandy Bishayenergy_progress
05/21/2024Interior lighting powerSandy Bishayenergy_progress
05/21/2024Energy Code Compliance InspectionsSandy Bishayprogress
12/21/2023FinalJACOB HAASprogress
12/21/2023Fire-Resistant Penetrations and JointsJACOB HAASspecial
12/21/2023Mechanical SystemsJACOB HAASspecial
12/21/2023Post-installed AnchorsJACOB HAASspecial
12/21/2023Energy Code Compliance InspectionsJACOB HAASprogress
12/21/2023Shutoff dampersJACOB HAASenergy_progress
12/21/2023HVAC-R and service water heating equipmentJACOB HAASenergy_progress
12/21/2023Maintenance informationJACOB HAASenergy_progress
12/21/2023HVAC-R and service water heating system controlsJACOB HAASenergy_progress
12/21/2023HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
12/12/2023HVAC-R and service water piping design and insulation—energy_progress
11/07/2023HVAC-R and service water piping design and insulation—energy_progress
10/23/2023HVAC-R and service water piping design and insulation—energy_progress
08/18/2023Energy Code Compliance InspectionsJACOB HAASprogress
08/18/2023Insulation placement and R valuesJACOB HAASenergy_progress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
I.S. 328MEducation—
Project M01154621 Alteration · Permit Entire · 04/14/2025
Project M01109427 Alteration · Permit Entire · 11/08/2024
Project M01109435 Alteration · Permit Entire · 11/08/2024
Project M01109664 Alteration · Permit Entire · 11/08/2024
I.S. 164 - ManhattanEducationSub-basement, Floors 1–4, Roof
Project M00921904 Alteration · Permit Entire · 08/21/2023
I.S. 16EducationSub-basement, Floor 1
Project M00802429 Alteration · LOC Issued · 12/22/2022
P.S. 164MEducation—
Project M00752029 Alteration · LOC Issued · 12/08/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/01/2026M00752029-I1Request digital key ↗
08/31/2026M00802429-S2Request digital key ↗
08/31/2026M00802429-S1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
01/16/2009110224524Open ↗
09/12/2008110224524Open ↗
09/05/2008110224524Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
08/18/2008110224524Open ↗
08/18/2008110224524Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/31/2026M00802429-S2Open ↗
08/31/2026M00802429-P4Open ↗
08/31/2026M00802429-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/13/2026M00802429-P9Open ↗
09/13/2026M00802429-P9Open ↗
09/13/2026M00802429-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/13/2026M00802429-P9Open ↗
09/02/2026M01109664-I1Open ↗
08/31/2026M00802429-S3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/18/2008110224524Open ↗
08/18/2008110224524Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
04/06/2009110224524Open ↗
11/20/2008110224524Open ↗
▸BISSCHEDULE B - PLUMBING1
08/18/2008110224524Open ↗
▸Safety & Tenant Protection7
▸DOB NOWNYCSCA - Approved Site Safety Plans7
08/21/2026M01109664-I1Open ↗
08/13/2026M01109427-P1Open ↗
08/13/2026M01109427-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/31/2026M00802429-S1Open ↗
08/31/2026M00802429-S2Open ↗
▸BISASBESTOS INSPECTION REPORT1
08/18/2008110224524Open ↗
▸Approvals, Objections & Sign-offs75
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
08/31/2026M00802429-S2Open ↗
08/31/2026M00802429-P8Open ↗
08/31/2026M00802429-S1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)27
08/31/2026M00802429-S3Open ↗
08/31/2026M00802429-P3Open ↗
08/31/2026M00802429-P6Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/31/2026M00802429-S2Open ↗
08/27/2026M00934222-S1Open ↗
08/15/2026M00802429-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/31/2026M00802429-S2Open ↗
08/31/2026M00802429-S3Open ↗
08/13/2026M00921904-S2Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
08/18/2008110224524Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/18/2008110224524Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/18/2008110224524Open ↗
08/18/2008110224524Open ↗
▸Other Documents36
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal31
08/31/2026M00802429-S2Open ↗
08/31/2026M00802429-S3Open ↗
08/31/2026M00802429-P3Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWNYCSCA Exhibit 24
08/31/2026M00802429-S2Open ↗
08/31/2026M00802429-S3Open ↗
08/13/2026M00802429-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00921904-S1Open ↗