Condo, residential unit in elevator building
Hardenbrook House Condominium
404 EAST 66 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1083271
💬 Discuss this project
1959Year Built
13Stories
R4Building Class
R8BZoning
129,238 sfGross Floor Area
180Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: THE HARDENBROOK HOUSE CONDOMINIUM · 19,000 sf lot · 6.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
Floor 121 filing · 3 docs
Floor 112 filings · 11 docs
Floor 101 filing · 3 docs
Floor 91 filing · 12 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41 filing · 4 docs
Floor 3
Floor 2
Floor 1
Site & exterior2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARDENBROOK HOUSE CONDO2303/21/2026
OUTDOOR INSTALLATIONS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
CLARKE CONSTRUCTION CONSULTANTS103/21/2026
GREEN LIGHT EXPEDITING LLC403/21/2026
HLZAE103/21/2026
EXPEDITION NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor2007/08/2026
QUALITY BUILDING CONSTRUTIONGeneral Contractor507/08/2026
SOLID CONCEPT LLCGeneral Contractor303/21/2026
CITI CONTRACTING OF NEW YGeneral Contractor303/21/2026
PERSPECTIVE GENERAL CONSTGeneral Contractor303/21/2026
WEST VILLAGE CONTRACT LLCGeneral Contractor209/30/2026
MAGNUM PLUMBING & HEATING CORP.Plumbing107/08/2026
HEMANCHAL DEONARINEElectrical103/21/2026
JOHN JR MARIElectrical103/21/2026
ROBERT CHIMENTIElectrical103/22/2026
ALEF ELEC'L CONTR'G INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BROADWAY INSPECTIONS8735111/05/2025
GEORGE J. XERAKIAS, PE1658207/11/2024
HOWARD L ZIMMERMAN ARCHIT1712107/22/2022
RYAN SPECIAL ENGINEERING2018105/10/2022
MICHAEL GRAY ARCHITECT4478206/01/2021
Building Lifecycle
All (147)Filed (18)Permit Issued (20)Signed Off (9)Facade (FISP) (21)Violation (60)Inspection (2)Objection (2)Special Inspection (15)
09/29/2026
Permit issued — General Construction
M01303920-I1-GC
11/05/2025
Filed — Alteration
M01303920-I1
10/20/2025
Signed off — Alteration
M01124113-I1
10/07/2025
Permit issued — Suspended Scaffold
M01124113-I1-SC
08/26/2025
Signed off — Alteration
M01128363-I1
04/03/2025
Permit issued — General Construction
M01128363-I1-GC
03/19/2025
Signed off — Alteration
M00552858-I1
03/04/2025
Filed — Alteration
M01128363-I1
02/27/2025
Permit issued — Sidewalk Shed
M00552858-I1-SH
02/04/2025
Cycle 9 facade report submitted
02/04/2025
Cycle 9 facade report signed — SAFE
01/18/2025
Cycle 9 facade inspection completed
01/14/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-I1
12/09/2024
Signed off — Alteration
M00710966-I1
10/21/2024
Filed — Alteration
M01124113-I1
10/17/2024
Special inspection requirement — Final
TREVOR O. FLOWERS
08/23/2024
Permit issued — General Construction
M00710966-I1-GC-CX
08/22/2024
Permit issued — Supported Scaffold
M08013460-I1-SF
07/18/2024
Permit issued — Suspended Scaffold
M01051042-P1-SC
07/12/2024
Permit issued — Sidewalk Shed
M00552858-I1-SH
07/11/2024
Filed — Alteration
M01051042-P1
06/05/2024
Cycle 9 facade report submitted
06/05/2024
Cycle 9 facade report signed — UNSAFE
05/29/2024
Cycle 9 facade inspection completed
05/22/2024
Permit issued — Suspended Scaffold
M01051042-I1-SC
05/20/2024
Filed — Alteration
M01051042-I1
01/05/2024
Signed off — Alteration
M00879858-I1
09/22/2023
Permit issued — Structural
M00710966-I1-GC-CX
09/18/2023
Permit issued — Supported Scaffold
M08013460-I1-SF
07/13/2023
Permit issued — Sidewalk Shed
M00552858-I1-SH
06/20/2023
Permit issued — General Construction
M00879858-I1-GC
06/09/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-P5
06/05/2023
Filed — Alteration
M00879858-I1
06/05/2023
Violation issued (HPD, closed)
A
06/05/2023
Violation issued (HPD, closed)
A
06/05/2023
Violation issued (HPD, closed)
A
06/05/2023
Violation issued (HPD, closed)
A
02/01/2023
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-P4
01/23/2023
Cycle 9 facade report submitted
01/23/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Cycle 9 facade report signed — UNSAFE
01/18/2023
Cycle 9 facade inspection completed
12/21/2022
Signed off — Alteration
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT 11GH AS PER PLANS SUBMITTED HEREWITH.
M00727958-I1
12/21/2022
Signed off — Alteration
M00727918-I1
12/09/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-P3
10/30/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-P2
10/20/2022
Violation issued (ECB, closed)
Construction
10/14/2022
Permit issued — General Construction
M00710966-I1-GC-CX
10/12/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-P1
10/12/2022
Permit issued — Supported Scaffold
M08013460-I1-SF
10/05/2022
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08013460-I1
09/30/2022
Signed off — Alteration
INSTALLATION OF AIR CONDITIONING UNITS IN EXISTING SLEEVES; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00422107-I1
08/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2022
Filed — Alteration
M00710966-I1
07/12/2022
Permit issued — Sidewalk Shed
M00552858-I1-SH
06/27/2022
Permit issued — Plumbing
M00727958-I1-PL
06/16/2022
Permit issued — General Construction
M00727918-I1-GC
05/16/2022
Objection raised — Scope
05/16/2022
Objection resolved — Addressed
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWEST VILLAGE CONTRACT LLC09/29/2026
DOB NOWSuspended ScaffoldPermit IssuedJEPOL CONSTRUCTION INC10/07/2025
DOB NOWGeneral ConstructionSigned-offPUNJAB CONSTRUCTION NYLLC04/03/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC02/27/2025
DOB NOWGeneral ConstructionSigned-offQUALITY BUILDING CONSTRUT08/23/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC08/22/2024
DOB NOWSuspended ScaffoldPermit IssuedQUALITY BLDG CONSTRUCTION07/18/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/12/2024
DOB NOWSuspended ScaffoldPermit IssuedQUALITY BLDG CONSTRUCTION05/22/2024
DOB NOWStructuralSigned-offQUALITY BUILDING CONSTRUT09/22/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC09/18/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/13/2023
DOB NOWGeneral ConstructionSigned-offSOLID CONCEPT LLC06/20/2023
DOB NOWGeneral ConstructionSigned-offQUALITY BUILDING CONSTRUT10/14/2022
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC10/12/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/12/2022
DOB NOWPlumbingSigned-offMAGNUM PLUMBING & HEATING CORP.06/27/2022
DOB NOWGeneral ConstructionSigned-offWEST VILLAGE CONTRACT LLC06/16/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC07/08/2021
DOB NOWMechanical SystemsSigned-offCITI CONTRACTING OF NEW Y05/03/2021
BISOTISSUEDCITI CONTRACTING OF NEW Y01/12/2021
BISOTISSUEDCITI CONTRACTING OF NEW Y10/05/2020
BISOTISSUEDMARLANDE HEATING CORP03/11/2020
BISPLISSUEDALKLEM PLUMBING INC03/11/2020
BISPLISSUEDSAFEPIPE PLUMBING INC02/05/2020
BISMHISSUEDCITI CONTRACTING OF NEW Y05/15/2019
BISPLISSUEDSAFEPIPE PLUMBING INC05/03/2018
BISOTISSUEDCITI CONTRACTING OF NEW Y04/23/2018
BISOTISSUEDMARLANDE HEATING CORP08/17/2017
BISEQISSUEDPHOENIX SUTTON STR INC04/12/2017
BISOTISSUEDMARLANDE HEATING CORP12/15/2016
BISPLISSUEDALKLEM PLUMBING INC12/15/2016
BISEQISSUEDOUTDOOR INSTALLATION LLC03/14/2008
BISOTISSUEDVETACO CONSTRUCTION02/15/2008
BISFBRE-ISSUEDABILENE, INC07/30/2007
BISEQISSUEDOUTDOOR INSTALLATION LLC04/23/2007
BISOTISSUEDCEMA CONSTRUCTION04/17/2000
BISPLISSUEDDNA PLUMBING CONTR. INC01/20/2000
BISOTISSUEDDELTA GENERAL CONTRACTING10/01/1999
BISEQISSUEDSPRING SCAFFOLDING INC09/22/1998
+ 3 more permits on file
8 projects · most recent 06/17/2022
General Wiring
FiledStatusContractorScope
06/17/2022Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
07/08/2021CompleteTOP SHELF ELECTRIC CORP—
03/11/2021CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
10/30/2019CompleteALEF ELEC'L CONTR'G INCGeneral Wiring
07/07/2019CompleteROBERT CHIMENTI—
02/06/2019CompleteROBERT CHIMENTIGeneral Wiring
02/04/2019CompleteROBERT CHIMENTIGeneral Wiring
01/11/2019CompleteALEF ELEC'L CONTR'G INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/17/2024FinalTREVOR O. FLOWERSprogress
05/04/2022Fire-Resistant Penetrations and JointsWilliam Ryanspecial
05/04/2022Lighting controlsBeyhan Karahanenergy_progress
05/04/2022Lighting in dwelling unitsBeyhan Karahanenergy_progress
04/28/2022FinalBeyhan Karahanprogress
04/01/2022Structural Steel - WeldingHoward Zimmermanspecial
04/01/2022FinalHoward Zimmermanprogress
04/01/2022Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
04/01/2022Post-installed AnchorsHoward Zimmermanspecial
04/01/2022Concrete - Cast-In-PlaceHoward Zimmermanspecial
04/01/2022MasonryHoward Zimmermanspecial
05/27/2021Mechanical SystemsMichael Grayspecial
05/27/2021FinalHARRY NICOLAIDESprogress
05/27/2021HVAC and service water heating system controls HARRY NICOLAIDESenergy_progress
05/27/2021HVAC and service water heating equipment HARRY NICOLAIDESenergy_progress
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch16
09/03/2026M00552858-I1Request digital key ↗
09/02/2026M00727918-I1Request digital key ↗
09/02/2026M00710966-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00422107-I1Request digital key ↗
08/15/2026M00422107-P1Request digital key ↗
▸Applications & Permits37
▸BISPLAN / WORK APPROVAL APPLICATION20
06/15/2021140930161Open ↗
11/30/2020140930161Open ↗
08/20/2020122800978Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION17
01/12/2021140930161Open ↗
10/05/2020123736680Open ↗
03/13/2020122800978Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00422107-I1Open ↗
09/02/2026M00727918-I1Open ↗
09/02/2026M00727958-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026M00710966-I1Open ↗
08/24/2026M00727918-I1Open ↗
08/24/2026M00727918-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/03/2019123736680Open ↗
01/14/2019123132555Open ↗
04/24/2018123132555Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026M00710966-I1Open ↗
08/24/2026M00727918-I1Open ↗
08/23/2026M00422107-P1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/19/2016122800978Open ↗
02/19/2008110098965Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/07/2017140627640Open ↗
12/19/2016122800978Open ↗
▸BISPC FULL REPORT1
02/15/2008110098965Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/07/2017140627640Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
—140930161Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/07/2017140627640Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/15/2008110098965Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING6
08/20/2020122800978Open ↗
08/12/2020122800978Open ↗
07/19/2020122800978Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
04/24/2020122800978Open ↗
10/07/2019123736680Open ↗
05/03/2019123736680Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/19/2016122800978Open ↗
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes7
12/22/2020140930161Open ↗
03/11/2020122800978Open ↗
03/10/2020122800978Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan2
09/03/2026M00422107-I1Open ↗
08/13/2026M00422107-P1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00422107-I1Open ↗
09/02/2026M00727918-I1Open ↗
08/14/2026M00727958-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/22/2020140930161Open ↗
11/30/2020140930161Open ↗
05/03/2019123736680Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/05/2008110196831Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/15/2008110098965Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01303920-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/03/2019123736680Open ↗
01/14/2019123132555Open ↗
04/24/2018123132555Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
03/14/2022140930161Open ↗
02/18/2021122800978Open ↗
10/06/2020123736680Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/14/2022140930161Open ↗
02/18/2021122800978Open ↗
10/06/2020123736680Open ↗
Showing 3 of 5 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
02/18/2021122800978Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00727918-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
03/16/2022140930161Open ↗
03/16/2022140930161Open ↗
03/14/2022140930161Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026M08013460-I1Open ↗
08/13/2026M08013460-P3Open ↗
08/13/2026M08013460-P4Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/21/2022140930161Open ↗
10/06/2020123736680Open ↗
01/14/2019123132555Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/18/2021122800978Open ↗
02/06/2020123736680Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/05/2008110196831Open ↗
02/15/2008110098965Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
03/14/2022140930161Open ↗
02/18/2021122800978Open ↗
10/06/2020123736680Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms18
▸BISBOROUGH INTAKE FORM7
10/05/2020123736680Open ↗
05/13/2020122800978Open ↗
04/24/2020122800978Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION5
06/16/2021140930161Open ↗
12/06/2020140930161Open ↗
07/22/2020122800978Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
05/03/2019123736680Open ↗
04/11/2018123132555Open ↗
12/19/2016122800978Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
04/07/2017140627640Open ↗
—140930161Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
02/18/2021122800978Open ↗
02/18/2021122800978Open ↗
10/05/2020123736680Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01051042-P1Open ↗
08/13/2026M01051042-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01051042-P1Open ↗
08/13/2026M01051042-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01124113-I1Open ↗