Office with commercial, 1-6 stories
408 WEST 14 STREET
MANHATTAN · BIN 1012236
💬 Discuss this project
1891Year Built
4Stories
O5Building Class
M1-5Zoning
37,400 sfGross Floor Area
11Units
LL97 Covered1 Open Violation ▸
Office with commercial, 1-6 stories · Owner of record: 404 WEST LLC · 10,325 sf lot · 3.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 13 docs
Floor 1Under Construction12p · 6 filings · 20 docs
CellarUnder Construction11p · 3 filings · 20 docs
BasementUnder Construction1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINTER MANAGEMENT11209/13/2026
404 WEST4803/22/2026
OWNER OF 408 WEST 14TH ST103/22/2026
401 WEST 14 REALTY203/22/2026
401 W 14 REALTY103/22/2026
BANK LEUMI TRUST OF NY203/22/2026
BANK LEUMI TRUST CO O103/22/2026
404 WEST LLC.C/OWINTER PROP. MGM303/21/2026
404 WEST LLC C O WINTER PROP MGT503/21/2026
404 WEST LLC C OWINTER PROP MGM503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AGOUTI CONSTRUCTION CONSULTING1003/21/2026
SEAY-YARBROUGH203/21/2026
MARY MCKEOWN803/21/2026
R-DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHILLI INCGeneral Contractor606/28/2026
GLYNN GROUP LLCGeneral Contractor303/21/2026
KING FREEZE MECHANICAL COGeneral Contractor203/21/2026
ALLSTATE SPRINKLER LLCFire Protection207/08/2026
N Y SIGN ARTScaffold207/08/2026
MAUCERI SIGN SYSTEMSScaffold106/27/2026
NU-WAY HEATING & COOLINGGeneral Contractor104/09/2026
ROBERT COVELLOElectrical103/21/2026
RMS INDUSTRIES OF NY, INCGeneral Contractor107/08/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
BEDROCK PLBG. & HTG., INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY TESTING, LLC7344506/15/2026
INTEGRITY CONSULTING SERV666601/28/2026
STEVE E. BLATZ ARCHITECT3634401/28/2026
KATZ ENGINEERING238111/08/2022
NEW CONCEPT ENGINEERING,3906109/23/2021
Building Lifecycle
All (140)Filed (24)Permit Issued (17)Signed Off (12)Violation (29)Inspection (14)Objection (14)Special Inspection (30)
08/14/2026
Signed off — Alteration
Lululemon - Structural work associated with dunnage for root fop RTU per plans filed herewith. No change to egress use or occupancy.
M01321602-I1
08/14/2026
Signed off — Alteration
"LULULEMON" New tenant build out. Remove/install non load bearing partitions, flooring, ceiling, finishes as per plans filed herewith. No change in egress, use or occupancy
M01319353-I1
08/14/2026
Signed off — Alteration
"Lululemon" Replacement of metal and glass section of existing storefront for new tenant build out. No change in egress, use or occupancy
M01322680-I1
07/30/2026
Signed off — Alteration
Mechanical work in conjunction with new tenant layout for "Lululemon" as per plans filed herewith. No change in egress, use or occupancy
M01321548-I1
07/23/2026
Signed off — Alteration
Lululemon. Installation of temporary plywood fence. No change in egress, use or occupancy.
M01321877-I1
07/13/2026
Signed off — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN INSTALLED ONTO NEW METAL TRANSOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01370960-I1
06/23/2026
Filed — Alteration
Plumbing work associated with new tenant build out for "Lululemon" per plans filed herewith. No change in egress, use or occupancy.
M01321564-P1
06/18/2026
Special inspection requirement — Final
KEVIN SNEDEKER
06/18/2026
Special inspection requirement — Mechanical Systems
KEVIN SNEDEKER
06/15/2026
Filed — Alteration
Mechanical work in conjunction with new tenant layout for "Lululemon" as per plans filed herewith. No change in egress, use or occupancy
M01321548-P1
06/11/2026
Special inspection requirement — Mechanical Systems
KEVIN SNEDEKER
06/11/2026
Special inspection requirement — Final
KEVIN SNEDEKER
05/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Special inspection requirement — Final
KEVIN SNEDEKER
04/29/2026
Filed — Alteration
"LULULEMON" New tenant build out. Remove/install non load bearing partitions, flooring, ceiling, finishes as per plans filed herewith. No change in egress, use or occupancy
M01319353-P1
04/21/2026
Signed off — Alteration
Mechanical work filed in conjunction with store renovation
M01215713-S4
04/21/2026
Signed off — Alteration
Mechanical work filed in conjunction with store renovation
M01215713-S3
04/21/2026
Signed off — Alteration
Mechanical work filed in conjunction with store renovation
M01215713-S2
04/21/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/20/2026
Signed off — Alteration
Mechanical work filed in conjunction with store renovation
M01215713-I1
04/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/20/2026
Filed — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN INSTALLED ONTO NEW METAL TRANSOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01370960-I1
03/20/2026
Permit issued — Sign
M01370960-I1-SG
03/18/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/13/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/12/2026
Permit issued — Structural
M01365527-I1-ST
03/12/2026
Permit issued — General Construction
M01322680-I1-GC
03/12/2026
Special inspection requirement — Final
Israel Wertentheil
03/09/2026
Filed — Alteration
Lululemon - Structural work associated with storefront work. No change to egress use or occupancy.
M01365527-I1
03/06/2026
Permit issued — Plumbing
M01321564-I1-PL
03/04/2026
Permit issued — Mechanical Systems
M01215713-S3-MS
02/27/2026
Filed — Alteration
"Lululemon" Replacement of metal and glass section of existing storefront for new tenant build out. No change in egress, use or occupancy
M01322680-I1
02/27/2026
Special inspection requirement — Structural Cold-Formed Steel
KEVIN SNEDEKER
02/27/2026
Special inspection requirement — Final
KEVIN SNEDEKER
02/25/2026
Permit issued — Structural
M01321602-I1-ST
02/25/2026
Permit issued — Mechanical Systems
M01321548-I1-MS
02/19/2026
Permit issued — Sprinklers
M01321570-I1-EW-SP
02/11/2026
Special inspection requirement — Final
David Rosini
02/11/2026
Special inspection requirement — Mechanical Systems
ALEKSANDR LEVIN
02/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Blatz
02/11/2026
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
02/09/2026
Permit issued — General Construction
M01319353-I1-GC
02/06/2026
Filed — Alteration
Lululemon - Structural work associated with dunnage for root fop RTU per plans filed herewith. No change to egress use or occupancy.
M01321602-I1
02/06/2026
Filed — Alteration
Mechanical work in conjunction with new tenant layout for "Lululemon" as per plans filed herewith. No change in egress, use or occupancy
M01321548-I1
02/06/2026
Filed — Alteration
Plumbing work associated with new tenant build out for "Lululemon" per plans filed herewith. No change in egress, use or occupancy.
M01321564-I1
02/03/2026
Special inspection requirement — Structural Cold-Formed Steel
KEVIN SNEDEKER
01/30/2026
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
01/28/2026
Filed — Alteration
Mechanical work filed in conjunction with store renovation
M01215713-P2
01/28/2026
Filed — Alteration
Mechanical work filed in conjunction with store renovation
M01215713-P3
01/22/2026
Permit issued — Construction Fence
M01321877-I1-FN
01/16/2026
Filed — Alteration
LULELEMON - Sprinkler work associated with new tenant build out. No change in egress, use or occupancy.
M01321570-I1
01/12/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/10/2025
Filed — Alteration
"LULULEMON" New tenant build out. Remove/install non load bearing partitions, flooring, ceiling, finishes as per plans filed herewith. No change in egress, use or occupancy
M01319353-I1
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMAUCERI SIGN CO., INC03/20/2026
DOB NOWStructuralSigned-offMICHILLI INC03/12/2026
DOB NOWGeneral ConstructionSigned-offMICHILLI INC03/12/2026
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC03/06/2026
DOB NOWMechanical SystemsSigned-offNU-WAY HEATING & COOLING03/04/2026
DOB NOWStructuralSigned-offMICHILLI INC02/25/2026
DOB NOWMechanical SystemsSigned-offMICHILLI INC02/25/2026
DOB NOWSprinklersPermit IssuedALLSTATE SPRINKLER LLC02/19/2026
DOB NOWGeneral ConstructionSigned-offMICHILLI INC02/09/2026
DOB NOWConstruction FenceSigned-offMICHILLI INC01/22/2026
DOB NOWSignPermit IssuedSKANSKA BUILDING INC09/18/2025
DOB NOWSignPermit IssuedSKANSKA BUILDING INC09/18/2025
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC08/11/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO07/16/2025
DOB NOWGeneral ConstructionSigned-offGLYNN GROUP LLC07/01/2025
DOB NOWMechanical SystemsSigned-offKING FREEZE MECHANICAL CO12/01/2022
DOB NOWMechanical SystemsSigned-offRMS INDUSTRIES OF NY, INC01/31/2022
BISMHISSUEDJ LAWRENCE CONSTRCTN CORP06/29/2018
BISPLISSUEDDEANGELIS PLBG & HTG.INC04/24/2018
BISOTISSUEDJ LAWRENCE CONSTRCTN CORP03/23/2018
BISOTISSUEDPETER DI NATALE & ASSOC I10/18/2017
BIS—ISSUEDMAUCERI SIGN CO., INC01/19/2017
BIS—ISSUEDMAUCERI SIGN CO., INC01/19/2017
BISOTISSUEDPETER DI NATALE & ASSOC I12/29/2016
BISMHISSUEDPETER DI NATALE & ASSOC I12/29/2016
BISSPISSUEDHYDRO MECHANICAL INC10/21/2016
BISMHISSUEDPETER DI NATALE & ASSOC I10/13/2016
BISOTISSUEDPETER DI NATALE & ASSOC I10/13/2016
BISMHISSUEDPETER DI NATALE & ASSOC I09/21/2016
BISOTISSUEDPETER DI NATALE & ASSOC I09/21/2016
BISPLISSUEDBEDROCK PLBG. & HTG., INC10/06/2015
BISSPISSUEDFULL CAPACITY FIRE CORP10/01/2015
BISMHISSUEDMICHILLI INC09/28/2015
BISOTISSUEDMICHILLI INC09/28/2015
BIS—ISSUEDCAD SIGNS NYC CORP02/23/2015
BIS—ISSUEDCAD SIGNS NYC CORP02/23/2015
BISSPISSUEDALLSTATE SPRINKLER LLC12/10/2014
BISPLISSUEDA PLUS PLUMBING CORP12/08/2014
BISOTISSUEDTRANSPARENT CONSTRUCTION12/05/2014
BISMHISSUEDTRANSPARENT CONSTRUCTION12/05/2014
+ 27 more permits on file
1 project · most recent 06/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026Signed-offMICHILLI INCHeating and Air Conditioning Systems
Heat / Cool
Daikin DHK 150A 125 CFM · Rooftop Unit ×5
2 projects · most recent 01/28/2026
FiledStatusContractorScope
01/28/2026Signed-offALLSTATE SPRINKLER LLC74 heads
01/16/2026Permit IssuedALLSTATE SPRINKLER LLC41 heads
3 projects · most recent 06/23/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/23/2026Permit IssuedBEDROCK PLBG. & HTG., INCGas, Water/Sanitary
01/28/2026Signed-offACCURATE MECHANICAL INCWater/Sanitary
01/16/2026———
3 projects · most recent 03/25/2026
General Wiring
FiledStatusContractorScope
03/25/2026Permit IssuedALBA ELECTRIC CORPGeneral Wiring
06/20/2025CompleteOMTA TECH INCGeneral Wiring
07/30/2018CompleteJSP ELECTL CNTNG CORPGeneral Wiring
3 projects · most recent 03/09/2026
FiledStatusContractorScope
03/09/2026Signed-offMICHILLI INC1 scope_items
02/06/2026Signed-offMICHILLI INC1 scope_items
01/28/2026Signed-offNU-WAY HEATING & COOLING1 scope_items
2 projects · most recent 01/28/2026
Fence
FiledStatusContractorScope
01/28/2026Signed-offNU-WAY HEATING & COOLINGFence
12/03/2025Signed-offMICHILLI INCFence
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/12/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/18/2026FinalKEVIN SNEDEKERprogress
06/18/2026Mechanical SystemsKEVIN SNEDEKERspecial
06/11/2026Mechanical SystemsKEVIN SNEDEKERspecial
06/11/2026FinalKEVIN SNEDEKERprogress
05/05/2026FinalKEVIN SNEDEKERprogress
03/12/2026FinalIsrael Wertentheilprogress
02/27/2026Structural Cold-Formed SteelKEVIN SNEDEKERspecial
02/27/2026FinalKEVIN SNEDEKERprogress
02/11/2026FinalDavid Rosiniprogress
02/11/2026Mechanical SystemsALEKSANDR LEVINspecial
02/11/2026Fire-Resistant Penetrations and JointsStephen Blatzspecial
02/11/2026Post-installed AnchorsALEKSANDR LEVINspecial
02/03/2026Structural Cold-Formed SteelKEVIN SNEDEKERspecial
01/30/2026Sprinkler SystemsALEKSANDR LEVINspecial
11/26/2025Fire-Resistant Penetrations and JointsStephen Blatzspecial
11/26/2025Mechanical SystemsALEKSANDR LEVINspecial
11/26/2025Post-installed AnchorsALEKSANDR LEVINspecial
11/26/2025FinalDavid Rosiniprogress
11/20/2025FinalKEVIN SNEDEKERprogress
11/19/2025Sprinkler SystemsKEVIN SNEDEKERspecial
11/19/2025FinalKEVIN SNEDEKERprogress
09/15/2025Fire-Resistant Penetrations and JointsStephen Blatzspecial
09/15/2025FinalStephen Blatzprogress
09/15/2025Post-installed AnchorsALEKSANDR LEVINspecial
08/17/2022Mechanical SystemsYURI KATZspecial
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Luca FaloniRetailFloor 1
Project M01269086 Alteration · Permit Entire · 08/28/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 485 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
09/03/2026M00517993-I1Request digital key ↗
09/01/2026M00795150-I1Request digital key ↗
08/21/2026M01269086-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits96
▸BISPLAN / WORK APPROVAL APPLICATION39
05/30/2018123386255Open ↗
05/25/2018123386255Open ↗
05/23/2018123386255Open ↗
Showing 3 of 39 on file for this type
▸BISWORK PERMIT APPLICATION38
07/02/2018123386255Open ↗
06/29/2018123386255Open ↗
04/27/2018123386255Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWLPC Approval/Permit19
09/03/2026M00517993-I1Open ↗
08/19/2026M01321564-P1Open ↗
08/19/2026M01321548-P1Open ↗
Showing 3 of 19 on file for this type
▸Seals & Professional Certifications146
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION52
03/28/2019123386255Open ↗
08/31/2018123386255Open ↗
08/14/2018123386255Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/03/2026M00517993-I1Open ↗
08/20/2026M01321877-I1Open ↗
08/19/2026M01321570-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
03/15/2018123386255Open ↗
01/20/2017122939133Open ↗
01/20/2017122939124Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M01215713-S4Open ↗
09/23/2026M01321570-I1Open ↗
09/02/2026M01215713-S3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026M01215713-S3Open ↗
09/02/2026M01321548-P1Open ↗
08/30/2026M00517993-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
02/10/2015122264922Open ↗
12/10/2014122182967Open ↗
Showing 2 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
03/15/2018123386255Open ↗
03/15/2018123386255Open ↗
01/20/2017122939133Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment32
▸BISSELF-CERT PLUMBING NOTICE9
12/28/2015122534383Open ↗
07/17/2015122182967Open ↗
02/11/2015122182967Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
05/30/2018123386255Open ↗
05/25/2018123386255Open ↗
05/23/2018123386255Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
03/26/2019123216670Open ↗
09/01/2017122863071Open ↗
Showing 2 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
07/17/2015122182967Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/19/2026M01321570-I1Open ↗
08/19/2026M01321564-I1Open ↗
08/19/2026M01321564-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
03/28/2018123216670Open ↗
03/15/2018123386255Open ↗
01/20/2017122939133Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
02/10/2015122265422Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/15/2018123386255Open ↗
03/23/2018123386255Open ↗
03/15/2018123386255Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
06/15/2018123386255Open ↗
08/05/2015122167859Open ↗
08/04/2015122182967Open ↗
▸Approvals, Objections & Sign-offs47
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/05/2019123386255Open ↗
05/29/2019123216670Open ↗
03/28/2019123386255Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS APPROVAL17
03/15/2018123386255Open ↗
01/20/2017122939133Open ↗
01/20/2017122939124Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/29/2019123216670Open ↗
09/16/2016122861162Open ↗
08/05/2015122167859Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership38
▸BISCOST AFFIDAVIT37
05/29/2019123216670Open ↗
03/28/2018123216670Open ↗
03/15/2018123386255Open ↗
Showing 3 of 37 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms40
▸BISEFILING COVER SHEET25
03/28/2018123216670Open ↗
03/15/2018123386255Open ↗
03/15/2018123386255Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM10
06/05/2019123386255Open ↗
05/29/2019123216670Open ↗
03/28/2019123386255Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION3
05/30/2018123386255Open ↗
05/25/2018123386255Open ↗
05/23/2018123386255Open ↗
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents9
▸DOB NOWProof of Historic Building9
08/19/2026M01321564-P1Open ↗
08/19/2026M01321548-P1Open ↗
08/17/2026M01319353-P1Open ↗
Showing 3 of 9 on file for this type