← Back
Four families
407 3 STREET
BROOKLYN · BIN 3020963
💬 Discuss this project
1921Year Built
4Stories
C3Building Class
R6BZoning
5,353 sfGross Floor Area
4Units
Rent Stabilized33 Open Violations ▸FDNY Report ↗
Four families · Owner of record: 407 3RD STREET ASSOCIATES LLC · 2,050 sf lot · 2.61 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction9p · 2 filings · 20 docs
Floor 3Under Construction8p · 2 filings · 20 docs
Floor 2Under Construction8p · 2 filings · 20 docs
Floor 1Under Construction8p · 2 filings · 20 docs
CellarUnder Construction11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
407 AR1104/09/2026
407 3RD STREET ASSOCIATES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/07/2026$4.8M—407 3RD STREET ASSOCIATES LLC → 407 AR LLC$890/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EVAN CHAN ARCHITECT, PC302/12/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRUEBLUE CONSTRUCTION LLCGeneral Contractor304/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EVAN CHAN ARCHITECT, P.C.5605102/05/2026
Building Lifecycle
All (58)Filed (3)Permit Issued (4)Violation (34)Special Inspection (17)
04/30/2026
Violation issued (HPD, open)
A
03/30/2026
Permit issued — General Construction
B01344022-I1-GC-CX
02/17/2026
Permit issued — Plumbing
B01344022-S1-PL
02/12/2026
Filed — Alteration
PLUMBING WORK OF AN EXISTING 4 STORY BUILDING W/ CELLAR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 4 FAMILY DWELLING TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01344022-S1
02/05/2026
Filed — Alteration
PLUMBING WORK OF AN EXISTING 4 STORY BUILDING W/ CELLAR. GENERAL CONSTRUCTION WORK TYPE. EXISTING 4 FAMILY DWELLING TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01344022-I1
02/05/2026
Permit issued — General Construction
B01341455-I1-GC
01/27/2026
Permit issued — General Construction
B01341455-I1-GC
01/18/2026
Filed — Alteration
B01341455-I1
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Evan Chan
01/08/2026
Special inspection requirement — Heating Systems
Evan Chan
01/08/2026
Special inspection requirement — Mechanical Systems
Evan Chan
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Evan Chan
01/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Evan Chan
01/08/2026
Special inspection requirement — Final
Evan Chan
01/08/2026
Special inspection requirement — Fenestration air leakage
Evan Chan
01/08/2026
Special inspection requirement — Fenestration areas
Evan Chan
01/08/2026
Special inspection requirement — Lighting controls
Evan Chan
01/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Evan Chan
01/08/2026
Special inspection requirement — Maintenance information
Evan Chan
01/08/2026
Special inspection requirement — Lighting in dwelling units
Evan Chan
01/08/2026
Special inspection requirement — Interior lighting power
Evan Chan
01/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Evan Chan
01/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Evan Chan
01/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Evan Chan
01/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Evan Chan
11/19/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/03/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/17/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
02/18/2022
Violation issued (HPD, open)
I
02/18/2022
Violation issued (HPD, open)
A
08/25/2021
Violation issued (HPD, open)
C
08/25/2021
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, open)
I
04/05/2021
Violation issued (HPD, open)
A
10/28/2019
Violation issued (HPD, open)
I
10/12/2018
Violation issued (HPD, open)
I
11/15/2017
Violation issued (HPD, open)
I
11/01/2016
Violation issued (HPD, open)
I
10/06/2015
Violation issued (HPD, open)
I
04/13/2003
Violation issued (HPD, open)
B
04/11/1997
Violation issued (HPD, closed)
A
04/09/1997
Violation issued (HPD, open)
B
12/19/1989
Violation issued (HPD, open)
A
12/19/1989
Violation issued (HPD, open)
B
12/19/1989
Violation issued (HPD, open)
B
06/18/1987
Violation issued (HPD, open)
B
06/18/1987
Violation issued (HPD, open)
B
06/18/1987
Violation issued (HPD, open)
B
06/18/1987
Violation issued (HPD, open)
A
06/18/1987
Violation issued (HPD, open)
A
06/18/1987
Violation issued (HPD, open)
B
06/18/1987
Violation issued (HPD, open)
B
06/18/1987
Violation issued (HPD, open)
A
06/18/1987
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTRUEBLUE CONSTRUCTION LLC03/30/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.02/17/2026
DOB NOWGeneral ConstructionPermit IssuedTRUEBLUE CONSTRUCTION LLC02/05/2026
DOB NOWGeneral ConstructionPermit IssuedTRUEBLUE CONSTRUCTION LLC01/27/2026
1 project · most recent 05/15/2026
General Wiring
FiledStatusContractorScope
05/15/2026Permit IssuedGOODALL ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/08/2026Fire-Resistant Penetrations and JointsEvan Chanspecial
01/08/2026Heating SystemsEvan Chanspecial
01/08/2026Mechanical SystemsEvan Chanspecial
01/08/2026Energy Code Compliance InspectionsEvan Chanprogress
01/08/2026Fire-Resistance Rated ConstructionEvan Chanprogress
01/08/2026FinalEvan Chanprogress
01/08/2026Fenestration air leakageEvan Chanenergy_progress
01/08/2026Fenestration areasEvan Chanenergy_progress
01/08/2026Lighting controlsEvan Chanenergy_progress
01/08/2026Fenestration and door U-factor and product ratingsEvan Chanenergy_progress
01/08/2026Maintenance informationEvan Chanenergy_progress
01/08/2026Lighting in dwelling unitsEvan Chanenergy_progress
01/08/2026Interior lighting powerEvan Chanenergy_progress
01/08/2026HVAC-R and service water heating equipmentEvan Chanenergy_progress
01/08/2026HVAC-R and service water heating system controlsEvan Chanenergy_progress
01/08/2026HVAC-R and service water piping design and insulationEvan Chanenergy_progress
01/08/2026Duct leakage testing, insulation and designEvan Chanenergy_progress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026B01341455-I1Request digital key ↗
08/18/2026B01344022-S1Request digital key ↗
08/18/2026B01344022-I1Request digital key ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026B01344022-I1Open ↗
08/28/2026B01344022-I1Open ↗
08/28/2026B01344022-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026B01341455-I1Open ↗
08/18/2026B01344022-S1Open ↗
08/18/2026B01344022-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B01344022-I1Open ↗
08/28/2026B01344022-I1Open ↗
08/28/2026B01344022-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026B01341455-I1Open ↗
08/18/2026B01344022-I1Open ↗
08/18/2026B01344022-S1Open ↗