← Back
Elevator apt, semi-fireproof with stores
408 MANHATTAN AVENUE
MANHATTAN · BIN 1059073
💬 Discuss this project
1910Year Built
7Stories
D7Building Class
R7AZoning
41,678 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: 400-408 HSG DEV FUNDCO · 7,064 sf lot · 5.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VENUS CONSTRUCTION NY607/08/2026
JIMMY G CONSTRUCTION503/22/2026
400-408 HSG DEV FUND CO603/22/2026
400-408 HSG DEV FUENDOS103/22/2026
OPPENHEIMER MFHHF INC103/22/2026
PRESTON MOORE/OWNER URBAN103/22/2026
OWNER OF BLDG 408 MANHATT103/22/2026
HSG DEVELOPMENT FOUND103/22/2026
HSG DEVELOPMENT FIND103/22/2026
U H O MANAGEMENT103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA108/17/2023
OPTIMIZED ENGINEERING ASSOCIATES101/11/2022
GREEN DESIGN109/23/2020
SYED ENGINEERING, P.C.102/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VICTOR SCHWARTZ ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VENUS CONSTRUCTION NY INCGeneral Contractor1107/08/2026
HI-TECH RESTORATION CORPGeneral Contractor407/08/2026
BALWINDER SINGHGeneral Contractor203/21/2026
JIMMY G CONSTRUCTION CORPGeneral Contractor203/21/2026
ROBERT CHIMENTIElectrical103/21/2026
BETANCOURT, JOHNElectrical103/21/2026
TORRES IVANElectrical103/21/2026
SMITH, STEPHENElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
MORRIS HELLERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OPTIMIZED ENGINEERING ASS2449101/11/2022
Building Lifecycle
All (92)Filed (4)Permit Issued (8)Signed Off (1)Facade (FISP) (12)Violation (60)Inspection (2)Special Inspection (5)
06/10/2026
Violation issued (HPD, open)
B
03/26/2026
Violation issued (ECB, open)
Elevators
01/21/2026
Violation issued (HPD, closed)
A
01/21/2026
Violation issued (HPD, open)
C
01/21/2026
Violation issued (HPD, open)
B
01/21/2026
Violation issued (HPD, open)
C
01/21/2026
Violation issued (HPD, open)
C
01/21/2026
Violation issued (HPD, open)
C
01/21/2026
Violation issued (HPD, open)
B
12/15/2025
Violation issued (HPD, open)
C
12/15/2025
Violation issued (HPD, open)
B
12/15/2025
Violation issued (HPD, open)
C
09/23/2025
Violation issued (HPD, open)
C
09/23/2025
Violation issued (HPD, open)
A
08/18/2025
Violation issued (ECB, closed)
Elevators
06/04/2025
Violation issued (HPD, closed)
A
12/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/22/2024
Violation issued (HPD, closed)
I
11/04/2024
Signed off — Alteration
FACADE RESTORATION IN CONNECTION WITH THE CYCLE 9 FISP REPORT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00610141-I1
07/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2024
Violation issued (HPD, closed)
B
05/27/2024
Violation issued (HPD, closed)
C
05/27/2024
Violation issued (HPD, open)
C
05/27/2024
Violation issued (HPD, closed)
B
05/10/2024
Permit issued — Supported Scaffold
M00920686-I1-SF
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2024
Violation issued (HPD, closed)
A
01/12/2024
Permit issued — General Construction
M00610141-I1-GC-CX
11/27/2023
Violation issued (HPD, closed)
C
08/18/2023
Permit issued — Supported Scaffold
M00920686-I1-SF
08/17/2023
Filed — Alteration
M00920686-I1
05/18/2023
Violation issued (HPD, closed)
B
05/18/2023
Violation issued (HPD, closed)
B
03/15/2023
Violation issued (HPD, closed)
A
03/02/2023
Violation issued (HPD, closed)
C
03/02/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
A
03/02/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
B
03/02/2023
Violation issued (HPD, closed)
B
12/02/2022
Permit issued — General Construction
M00610141-I1-GC-CX
09/23/2022
Permit issued — Sidewalk Shed
M00402757-I1-SH
02/17/2022
Cycle 9 facade report signed — SWARMP
02/15/2022
Cycle 9 facade inspection completed
02/15/2022
Violation issued (HPD, closed)
A
01/11/2022
Filed — Alteration
FACADE RESTORATION IN CONNECTION WITH THE CYCLE 9 FISP REPORT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00610141-I1
11/23/2021
Special inspection requirement — Structural Steel - Details
Guy Lagomarsino
10/12/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Guy Lagomarsino
10/12/2021
Special inspection requirement — Masonry
Guy Lagomarsino
10/12/2021
Special inspection requirement — Final
Guy Lagomarsino
10/12/2021
Special inspection requirement — Fenestration air leakage
Guy Lagomarsino
08/23/2021
Cycle 9 facade report submitted
04/01/2021
Violation issued (HPD, closed)
A
12/24/2020
Permit issued — Sidewalk Shed
M00402757-I1-SH
09/24/2020
Permit issued — Sidewalk Shed
M00402757-I1-SH
09/23/2020
Filed — Alteration
M00402757-I1
08/01/2020
Violation issued (HPD, closed)
C
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offVENUS CONSTRUCTION NY INC05/10/2024
DOB NOWGeneral ConstructionSigned-offVENUS CONSTRUCTION NY INC01/12/2024
DOB NOWSupported ScaffoldSigned-offVENUS CONSTRUCTION NY INC08/18/2023
DOB NOWGeneral ConstructionSigned-offVENUS CONSTRUCTION NY INC12/02/2022
DOB NOWSidewalk ShedSigned-offVENUS CONSTRUCTION NY INC09/23/2022
DOB NOWSidewalk ShedSigned-offHI-TECH RESTORATION CORP12/24/2020
DOB NOWSidewalk ShedSigned-offHI-TECH RESTORATION CORP09/24/2020
DOB NOWSidewalk ShedPermit IssuedJIMMY G CONSTRUCTION CORP02/19/2019
BISOTISSUEDEMPIRE & R GENERAL CONSTR04/04/2019
BISEQISSUEDHKS CONSTRUCTION CORP11/16/2016
BISEQISSUEDB H & B CONSTRUCTION INC08/26/2014
BISFBISSUEDA&C HEATING SERVICES INC11/03/2011
BISEQISSUEDEMPIRE & R GENERAL CONSTR09/26/2011
BISEQISSUEDEMPIRE & R GENERAL CONSTR06/21/2011
BISOTISSUEDAPEX BUILDING COMPANY INC06/17/2011
BISSPISSUEDC. JAMES PLBG & HTG INC10/30/2009
BISSPISSUEDC. JAMES PLBG & HTG INC09/10/2008
BISPLISSUEDC. JAMES P/H INC09/10/2008
2 projects · most recent 01/18/2022
FiledStatusContractorScope
01/18/2022Permit IssuedROBERT CHIMENTI37 meters, 1 new_meters
02/18/2019Permit IssuedHIGH QUALITY ELECTRIC OF—
1 project · most recent 02/18/2019
Sidewalk Shed
FiledStatusContractorScope
02/18/2019Permit IssuedJIMMY G CONSTRUCTION CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/23/2021Structural Steel - DetailsGuy Lagomarsinospecial
10/12/2021Structural Stability – Alterations of existing buildingsGuy Lagomarsinospecial
10/12/2021MasonryGuy Lagomarsinospecial
10/12/2021FinalGuy Lagomarsinoprogress
10/12/2021Fenestration air leakageGuy Lagomarsinoenergy_progress
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
09/03/2026M00610141-I1Request digital key ↗
08/29/2026M00920686-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00127470-I1Request digital key ↗
09/04/2026M00402757-I1Request digital key ↗
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION12
04/04/2019123494735Open ↗
11/15/2016140575438Open ↗
08/25/2014140245045Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
01/15/2019123355555Open ↗
10/30/2018123494735Open ↗
04/18/2018123355555Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
04/04/2019123494735Open ↗
11/29/2018123355555Open ↗
10/30/2018123494735Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/03/2026M00610141-I1Open ↗
08/29/2026M00920686-I1Open ↗
08/13/2026M00127470-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/30/2018123494735Open ↗
11/04/2011120878513Open ↗
06/14/2011120708190Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/04/2011120878513Open ↗
06/16/2011120721095Open ↗
06/03/2011120708190Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/30/2018123494735Open ↗
11/15/2016140575438Open ↗
08/25/2014140245045Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/22/2026M00610141-I1Open ↗
08/22/2026M00610141-I1Open ↗
08/22/2026M00610141-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/15/2016140575438Open ↗
08/25/2014140245045Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/15/2016140575438Open ↗
08/25/2014140245045Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026M00610141-I1Open ↗
08/22/2026M00610141-I1Open ↗
▸BISPC FULL REPORT1
11/08/2007110016893Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
02/09/2010110016893Open ↗
01/16/2010110016893Open ↗
12/03/2009110016893Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/09/2012120878513Open ↗
11/04/2011120878513Open ↗
▸BISSCHEDULE B - PLUMBING1
11/08/2007110016893Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
10/30/2018123494735Open ↗
04/18/2018123355555Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/29/2018123355555Open ↗
▸BISSTREET TREE CHECKLIST1
06/16/2011120721095Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00402757-I1Open ↗
▸Environmental & Asbestos7
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
11/04/2011120878513Open ↗
11/08/2007110016893Open ↗
11/04/2011120878513Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/29/2018123355555Open ↗
10/30/2018123494735Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/14/2011120708190Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/03/2026M00610141-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/29/2018123355555Open ↗
10/30/2018123494735Open ↗
09/11/2013120878513Open ↗
▸BISTECHNICAL REPORT: ENERGY2
11/07/2011120878513Open ↗
11/04/2011120878513Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/11/2013120878513Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00610141-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/07/2020110016893Open ↗
11/15/2016140575438Open ↗
08/25/2014140245045Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
11/04/2011120878513Open ↗
06/16/2011120721095Open ↗
06/03/2011120708190Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/11/2013120878513Open ↗
01/27/2012120708190Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/11/2013120878513Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00402757-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
10/30/2018123494735Open ↗
09/20/2018123355555Open ↗
04/18/2018123355555Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/07/2020110016893Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
10/30/2018123494735Open ↗
04/18/2018123355555Open ↗
11/04/2011120878513Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
11/09/2012120878513Open ↗
06/25/2012120878513Open ↗
01/15/2009110016893Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/15/2016140575438Open ↗
08/25/2014140245045Open ↗