← Back
BuildNYC
Office with commercial, 1-6 stories
409 EAST 60TH STREET
MANHATTAN · BIN 1045274
💬 Discuss this project
1930Year Built
5Stories
O5Building Class
C6-3Zoning
49,500 sfGross Floor Area
3Units
LL97 Covered0 Active Violations
Office with commercial, 1-6 stories · Owner of record: Steel East 60, LLC - Limited Liability C Ompany · 10,042 sf lot · 4.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInstallation of three air conditioning units3p · 1 filing · 4 docs
Floor 5CLOC East 3rd Floor Renovation5p · 1 filing · 3 docs
Floor 4Steel East 60 LLC8p · 2 filings · 15 docs
Floor 3Steel East 60 LLC18p · 2 filings · 18 docs
Floor 2Charter CommunicationsUnder Construction6p · 2 filings · 15 docs
Floor 1
Site & exteriorInstallation of 300PSF sidewalk shedUnder Construction3p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Steel East 6010607/08/2026
New York Presbyterian Hospital403/22/2026
Charter310/04/2026
Steel Equities303/22/2026
Steel East 60, LLC - Limited Liability C Ompany103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Volume Space Consulting110/05/2026
AG Engineering109/02/2026
Piro Studio104/06/2026
Mumtaz Enterprises112/29/2025
Timothy E. Krawetz109/07/2022
Trolydia Engineering501/20/2022
Environmental Engineering Solutions108/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting203/21/2026
George E Berger Associates1003/21/2026
Environmental Engineering Solutions103/21/2026
Municipal Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri-State Pavingspecialty_contractor507/08/2026
H.M. Hughes CoGeneral Contractor403/21/2026
Red Rock IndustriesGeneral Contractor307/08/2026
Admore Air Conditioningspecialty_contractor203/21/2026
Sahara ContractingGeneral Contractor207/08/2026
Ace Group NYScaffold110/07/2026
AinsworthGeneral Contractor107/08/2026
Airplex GroupGeneral Contractor110/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899109/02/2026
Piro Studio7503104/06/2026
Mumtaz Enterprises9459112/29/2025
Alan Margolin & Associates423109/07/2022
Trolydia Testing & Inspec4422501/20/2022
Nuenergen1717108/09/2021
Building Lifecycle
All (94)Filed (11)Permit Issued (14)Signed Off (7)Violation (28)Objection (4)Special Inspection (30)
10/06/2026
Permit issued — Sidewalk Shed
M01467518-I1-SH
10/05/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01467518-I1
10/02/2026
Permit issued — Mechanical Systems
M01445664-I1-MS
09/25/2026
Objection resolved — Addressed
09/25/2026
Objection resolved — Addressed
09/14/2026
Objection raised — Admin
09/14/2026
Objection raised — Other
09/02/2026
Filed — Alteration
Mechanical work for it rooms. No change in use egress or ocupancy.
M01445664-I1
08/13/2026
Special inspection requirement — Mechanical Systems
ARIEL GOLSHAN
08/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
ARIEL GOLSHAN
08/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
ARIEL GOLSHAN
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ARIEL GOLSHAN
08/13/2026
Special inspection requirement — Energy Code Compliance Inspections
ARIEL GOLSHAN
08/13/2026
Special inspection requirement — Final
ARIEL GOLSHAN
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
07/10/2026
Violation issued (ECB, closed)
Construction
07/10/2026
Violation issued (ECB, closed)
Unknown
06/16/2026
Permit issued — General Construction
M01329963-I1-GC
05/07/2026
Violation issued (ECB, closed)
Unknown
04/22/2026
Signed off — Alteration
Installation of (1) 4 ton split system AC system located on the 2nd floor.
M01374415-I1
04/21/2026
Permit issued — Mechanical Systems
M01374415-I1-MS
04/06/2026
Filed — Alteration
Installation of (1) 4 ton split system AC system located on the 2nd floor.
M01374415-I1
03/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
03/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
03/18/2026
Special inspection requirement — Final
PIETRO ROSATO
03/18/2026
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
02/10/2026
Permit issued — General Construction
M01329963-I1-GC
12/29/2025
Filed — Alteration
APPLICATION FILE TO EXTERIOR FACADE REPAIR AS MINOR BRICK REPLACEMENT, BRICK CRACK REPAIR AND BRICK POINTING AT REAR ELEVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01329963-I1
12/07/2025
Special inspection requirement — Final
Mumtaz Hussain
12/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mumtaz Hussain
12/07/2025
Special inspection requirement — Masonry
Mumtaz Hussain
05/10/2024
Signed off — Alteration
M00766262-I1
09/06/2023
Permit issued — Mechanical Systems
M00766262-I1-MS
09/13/2022
Permit issued — Mechanical Systems
M00766262-I1-MS
09/07/2022
Filed — Alteration
M00766262-I1
01/26/2022
Signed off — Alteration
SUBSEQUENT FILING FOR STRUCTURAL WORK TO REPAIR STEEL BEAMS AS SHOWN ON PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00581826-S1
01/26/2022
Signed off — Alteration
SUBSEQUENT FILING FOR STRUCTURAL WORK TO REPAIR STEEL BEAMS AS SHOWN ON PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00581826-I1
01/24/2022
Special inspection requirement — Structural Steel - High Strength Bolting
EDWARD TOROSSIAN
01/24/2022
Special inspection requirement — Structural Steel - Welding
EDWARD TOROSSIAN
01/24/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
EDWARD TOROSSIAN
01/24/2022
Special inspection requirement — Final
EDWARD TOROSSIAN
01/24/2022
Special inspection requirement — Structural Steel - Details
EDWARD TOROSSIAN
01/20/2022
Filed — Alteration
SUBSEQUENT FILING FOR STRUCTURAL WORK TO REPAIR STEEL BEAMS AS SHOWN ON PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00581826-P1
01/19/2022
Special inspection requirement — Structural Steel - Welding
EDWARD TOROSSIAN
01/19/2022
Special inspection requirement — Structural Steel - High Strength Bolting
EDWARD TOROSSIAN
01/19/2022
Special inspection requirement — Final
EDWARD TOROSSIAN
01/19/2022
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
EDWARD TOROSSIAN
01/19/2022
Special inspection requirement — Structural Steel - Details
EDWARD TOROSSIAN
01/14/2022
Permit issued — Structural
M00581826-S1-ST
12/29/2021
Filed — Alteration
SUBSEQUENT FILING FOR STRUCTURAL WORK TO REPAIR STEEL BEAMS AS SHOWN ON PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00581826-S1
12/29/2021
Signed off — Alteration
SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 4TH FLOOR AS SHOWN ON PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00532454-S1
12/07/2021
Permit issued — General Construction
M00581826-I1-GC
11/09/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Signed off — Alteration
INSTALLATION OF TWO 5-TON GOODMAN AIR CONDITIONING UNITS AND ONE 5-TON LUXAIRE AIR CONDITIONING UNIT ON ROOF
M00542197-I1
09/30/2021
Permit issued — Mechanical Systems
M00542197-I1-MS
09/14/2021
Permit issued — General Construction
M00581826-I1-GC
09/09/2021
Signed off — Alteration
SUBSEQUENT FILING FOR STRUCTURAL WORK ON THE 4TH FLOOR AS SHOWN ON PLANS.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00532454-I1
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAce Group NY10/06/2026
DOB NOWMechanical SystemsPermit IssuedAirplex Group10/02/2026
DOB NOWGeneral ConstructionPermit IssuedSahara Contracting06/16/2026
DOB NOWMechanical SystemsSigned-offAinsworth04/21/2026
DOB NOWGeneral ConstructionPermit IssuedSahara Contracting02/10/2026
DOB NOWMechanical SystemsSigned-offHM Hughes Co09/06/2023
DOB NOWMechanical SystemsSigned-offHM Hughes Co09/13/2022
DOB NOWStructuralSigned-offRed Rock Industries01/14/2022
DOB NOWGeneral ConstructionSigned-offRed Rock Industries12/07/2021
DOB NOWMechanical SystemsSigned-offAdmore Air Conditioning09/30/2021
DOB NOWGeneral ConstructionSigned-offRed Rock Industries09/14/2021
DOB NOWStructuralSigned-offTri-State Paving08/27/2021
DOB NOWGeneral ConstructionSigned-offTri-State Paving07/08/2021
DOB NOWGeneral ConstructionSigned-offTri-State Paving06/08/2021
BISPLISSUEDBluewater Plumbing & Heating07/05/2017
BISSPISSUEDPlumbing Works07/05/2017
BISOTISSUEDCarrickmore P&D06/01/2017
BISMHISSUEDCarrickmore P&D06/01/2017
BIS—ISSUEDAmeri Build Contracting Associates I12/21/2016
BISFPISSUEDLund Fire Products Co09/21/2016
BISSPISSUEDCapitol Fire SPKL Co07/16/2014
BISSPISSUEDCapitol Fire SPKL Co03/19/2014
BISPLISSUEDCochrane Plumbing & Heating06/20/2013
BISMHISSUEDActive Air Systems06/03/2013
BISPLISSUEDUnlimited PLG Solutions05/22/2013
BISMHISSUEDActive Air Systems05/14/2013
BIS—ISSUEDAmeri Build Contracting Associates I04/08/2013
BISSPISSUEDAbco-Peerless Sprinkler03/28/2013
BISPLISSUEDWiesenberg03/05/2013
BISEQISSUEDKenneth J. Herman02/28/2013
BISSPISSUEDCapitol Fire SPKL Co02/28/2013
BISMHISSUEDStructure Tone02/26/2013
BISOTISSUEDStructure Tone02/26/2013
BISEQISSUEDStructure Tone02/26/2013
BISSPISSUEDCapitol Fire SPKL Co02/25/2013
BISPLISSUEDUnlimited PLG Solutions02/22/2013
BISOTISSUEDAmeri Build Contracting Associates I02/11/2013
BISEQISSUEDKenneth J. Herman02/04/2013
BISEQISSUEDArsenal Scaffold01/31/2013
BISOTISSUEDAmeri Build Contracting Associates I01/23/2013
+ 17 more permits on file
1 project · most recent 09/02/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/02/2026Permit IssuedAirplex GroupAir Conditioning Systems, Ventilation Systems
Cooling
Vertiv - 110 kW · Ahu ×2
Ventilation
Qpac 1700081 9,255 CFM · Exhaust Fan ×18
4 projects · most recent 10/06/2026
General Wiring
FiledStatusContractorScope
10/06/2026Permit IssuedA to Z NY Electrical ContractorGeneral Wiring
10/06/2026Permit IssuedA to Z NY Electrical ContractorGeneral Wiring
09/29/2026Permit IssuedHigh Quality Electric of NYC—
10/17/2019Permit IssuedDooley Electric CoGeneral Wiring
1 project · most recent 10/05/2026
Sidewalk Shed
FiledStatusContractorScope
10/05/2026Permit IssuedAce Group NYSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
08/13/2026Mechanical SystemsARIEL GOLSHANspecial
08/13/2026HVAC-R and service water heating equipmentARIEL GOLSHANenergy_progress
08/13/2026HVAC-R and service water heating system controlsARIEL GOLSHANenergy_progress
08/13/2026HVAC-R and service water piping design and insulationARIEL GOLSHANenergy_progress
08/13/2026Energy Code Compliance InspectionsARIEL GOLSHANprogress
08/13/2026FinalARIEL GOLSHANprogress
08/13/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
03/24/2026HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
03/24/2026HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
03/24/2026Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
03/24/2026Energy Code Compliance InspectionsPIETRO ROSATOprogress
03/24/2026HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
03/18/2026FinalPIETRO ROSATOprogress
03/18/2026Mechanical SystemsPIETRO ROSATOspecial
12/07/2025FinalMumtaz Hussainprogress
12/07/2025Structural Stability – Alterations of existing buildingsMumtaz Hussainspecial
12/07/2025MasonryMumtaz Hussainspecial
01/24/2022Structural Steel - High Strength BoltingEDWARD TOROSSIANspecial
01/24/2022Structural Steel - WeldingEDWARD TOROSSIANspecial
01/24/2022Mastic and Intumescent Fire-resistant CoatingsEDWARD TOROSSIANspecial
01/24/2022FinalEDWARD TOROSSIANprogress
01/24/2022Structural Steel - DetailsEDWARD TOROSSIANspecial
01/19/2022Structural Steel - WeldingEDWARD TOROSSIANspecial
01/19/2022Structural Steel - High Strength BoltingEDWARD TOROSSIANspecial
01/19/2022FinalEDWARD TOROSSIANprogress
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Charter CommunicationsOfficeFloor 2
Project M01374415 Alteration · LOC Issued · 04/06/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 601 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
10/06/2026M01467518-I1Request digital key ↗
10/04/2026M01445664-I1Request digital key ↗
09/03/2026M00532454-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits110
▸BISPLAN / WORK APPROVAL APPLICATION65
06/30/2021140869433Open ↗
10/07/2019140869433Open ↗
12/28/2017120988690Open ↗
Showing 3 of 65 on file for this type
▸BISWORK PERMIT APPLICATION44
07/13/2017123021443Open ↗
07/13/2017123021443Open ↗
06/09/2017123021443Open ↗
Showing 3 of 44 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/30/2017121443296Open ↗
▸Seals & Professional Certifications130
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION52
10/04/2017123021443Open ↗
09/01/2017123021443Open ↗
09/01/2017123021443Open ↗
Showing 3 of 52 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
06/01/2016122530421Open ↗
Showing 1 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
10/03/2026M01445664-I1Open ↗
10/03/2026M01445664-I1Open ↗
09/30/2026M00542197-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/03/2026M01445664-I1Open ↗
09/30/2026M00542197-I1Open ↗
09/23/2026M01374415-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
10/06/2026M01467518-I1Open ↗
10/03/2026M01445664-I1Open ↗
09/03/2026M00542197-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/01/2016122530421Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/20/2019140869433Open ↗
▸Trade Schedules & Equipment79
▸BISSELF-CERT PLUMBING NOTICE22
10/02/2015121478454Open ↗
06/24/2015121478454Open ↗
07/17/2014121612665Open ↗
Showing 3 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING17
06/24/2014121478454Open ↗
06/17/2014121612665Open ↗
06/03/2014121612665Open ↗
Showing 3 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT12
09/05/2014121612665Open ↗
03/07/2014121612674Open ↗
03/07/2014121612674Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS10
09/05/2014121612665Open ↗
09/05/2014121612665Open ↗
02/20/2014121612674Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
06/19/2017122530421Open ↗
09/23/2016122530421Open ↗
11/17/2015121160402Open ↗
Showing 3 of 10 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
07/06/2015121478454Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/24/2017123021443Open ↗
05/09/2017123021443Open ↗
06/26/2014121478454Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
11/17/2017121443296Open ↗
10/26/2017121443296Open ↗
▸Environmental & Asbestos39
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
04/27/2017123021443Open ↗
06/01/2016122530421Open ↗
05/23/2016122530412Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
10/03/2026M01445664-I1Open ↗
09/03/2026M00581826-S1Open ↗
09/03/2026M00581826-I1Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
03/27/2014121409118Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
03/27/2014121409118Open ↗
Showing 1 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
09/01/2017123021443Open ↗
06/05/2017123021443Open ↗
09/05/2014121612665Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
10/30/2017121443296Open ↗
10/04/2017123021443Open ↗
03/07/2014121612674Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/07/2019140869433Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/20/2019140869433Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs75
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST44
01/05/2018121443296Open ↗
11/17/2017121443296Open ↗
10/30/2017121443296Open ↗
Showing 3 of 44 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
08/21/2015121443296Open ↗
08/21/2015121443296Open ↗
01/06/2015121443296Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
06/05/2017123021443Open ↗
12/17/2013121171999Open ↗
Showing 2 of 5 on file for this type
▸Cost, Insurance & Ownership53
▸BISCOST AFFIDAVIT53
09/20/2019140869433Open ↗
10/30/2017121443296Open ↗
10/04/2017123021443Open ↗
Showing 3 of 53 on file for this type
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET26
05/09/2017123021443Open ↗
05/09/2017123021443Open ↗
06/01/2016122530421Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION25
10/07/2019140869433Open ↗
09/06/2017123021443Open ↗
08/28/2017123021443Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM10
01/05/2018121443296Open ↗
12/28/2017120988690Open ↗
12/22/2017120988690Open ↗
Showing 3 of 10 on file for this type
▸BISeFiling Job Application Cover Sheet4
10/07/2019140869433Open ↗
Showing 1 of 4 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/30/2017121443296Open ↗
01/26/2017122530412Open ↗
▸BISPLOT DIAGRAM1
10/30/2017121443296Open ↗